Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    New Dimensions in Initiation Systems

    By Curtis G. Kremer

    "New explosives initiation systems continue to be developed as new technologies make advancements possible. Due to recent initiator developments, explosives users now have the most reliable, accurate

    Jan 1, 1991

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

    Feb 1, 2020

  • ISEE
    Enhancing Blast Performance Evaluation through 3D Muck-pile Fragmentation Analysis: Overcoming Surface-Based Limitations

    By O. Cermak, F. Degonld

    Although 3D fragmentation analysis is a relatively new technology, it is rapidly gaining popularity among mid-sized mining operations and quarries. The results provided by this technology are adequate

    Jan 1, 2024

  • ISEE
    Front-End Loader Proof of Concept to assess the performance of an autonomous fragmentation analysis system.

    By Tyler Rockley, Carla Reyes

    Autonomous fragmentation measurement systems designed for shovels have been in operation for nearly two decades, however fragmentation systems capable of performing in the dynamic conditions of the fr

    Jan 21, 2025

  • ISEE
    More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design

    By Paul Klaric, Nicholas Bodley

    Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the

    Feb 6, 2023

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    Maximizing Drill Factors in Construction Blasting

    By Pat McLaughlin

    Blast design in the construction industry has often been based on past practice or powder factors. This is to some extent understandable, since construction projects do not have the longevity of minin

    Jan 1, 1994

  • ISEE
    Improved Remediation Performance of a Contaminated Basalt Aquifer by Blast Fracturing

    By Adrian Moore, Bryan Goodwin, David Fales, David Lam

    This paper describes the development of blasting protocols used to successfully create a 450m long blast fractured permeable trench in a basalt aquifer up to 20m thick, at a petrochemical facility in

    Jan 1, 2011

  • ISEE
    Optimized Drilling Through Automation

    By Eric C. Gerst

    "In this current era of soft commodity and coal prices the mining industry is turning towards optimizingall levels of production to reduce operating costs. Part of this trend includes the automation o

    Jan 1, 2017

  • ISEE
    Blast Vibration Modelling - An Instrument to Optimise Quarry Production

    By Drew Martin

    In March 2010 the Boral Linwood Quarry, Adelaide South Australia, implemented the blasting contractors Monte Carlo Blast Vibration Model as part of their blast design process. The Linwood Quarry was d

    Jan 1, 2012

  • ISEE
    Electronic Detonator and Modern Non-Electric Shocktube Detonator Accuracy

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The emergence of electronic detonators as viable products for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to tim

    Jan 1, 2011

  • ISEE
    Segregation Blasting Using Electronic Initiation at the Coeur Rochester Mine, Nevada

    By Donald Wagstaff, D. Scott Scovire

    The Coeur Rochester Mine is the largest primary silver surface mine in North America. Throughout its 17-year life, gold and silver grades leaving the tertiary crusher have typically been, on average,

    Jan 1, 2004

  • ISEE
    Ring Blasting Design Modeling and Optimization

    By María Rocha, Benjamín Cebrián, Roberto Laredo

    "Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all

    Jan 1, 2017

  • ISEE
    Cap Testing at the Minntac Mine

    By Jack Eloranta

    To improve control of blasting, tests were performed to assess non-electric cap accuracy. Simultaneous testing using a Velocity of Detonation Recorder (VODR), Red Lake LoCam and an Instantel DS-677 bl

    Jan 1, 1992

  • ISEE
    Pinkerton Tunnel Open Cut Project

    By Dale L. Ramsey

    The Pinkerton Tunnel Open Cut Project is part of the National Gateway Clearance Initiative improvement project to achieve a minimum of 6.4 meters (21 feet) of vertical clearance along CSX Transportati

    Jan 1, 2014

  • ISEE
    An Overview of the Effect of Soil Properties on Explosive Cratering

    By Denis Rickman, Jon Windham, Stephen Akers, Byron Armstrong

    The soil crater formed by detonation of an explosive charge is of considerable military interest because of the common use of explosives to create soil obstacles. The soil crater is also an important

    Jan 1, 2010

  • ISEE
    Optimization of Blast Fragmentation Curves and Determination of Rock-Blast Domains at Coimolache Mine, Based on Rock Factor Criterion and Kuz-Ram Model

    By Luis Huaroc, Augusto Sotomayor, Erick Rodriguez, Paulo Fernández, José Ricaldi, Luis Alejandro

    The application of the Kuz-Ram model for the prediction of fragmentation is used worldwide, in Coimolache Mine it was used to determine blast domains and optimize the process by obtaining drilling pat

    Feb 1, 2020

  • ISEE
    Optimized and Calibrated Migration to HXNBlast at Minera San Cristóbal

    By Javier Castaneda, Luis Zozaya, Noel Huarachi, María Rocha

    The objective of the project was to implement and calibrate drill and blast models supported by Geotechnical and Geological models as well as the mine and operation characteristics. The models would t

    Feb 1, 2020

  • ISEE
    Prediction of Ground Vibrations Using Neural Network in a Peruvian Mine

    By Pavel A. Torres, Darwin Torres, Sandro Huaman

    Given the limited efficiency of blast-induced ground vibrations prediction empirical models, due to the complex geological system from a Peruvian mine. An artificial neural network was built in order

    Feb 1, 2020

  • ISEE
    Saudi Arabia Transition to Mining – Blast Optimization at Maaden Gold Mines

    By Angel Rafael Fernandez, Yahya Khader Al-Harbi, Benjamin Cebrian Romo, Antonio Morato Medina

    The kingdom of Saudi Arabia has set the goal to diversify their economy from oil into different fields including mining. As the vast Arabian Peninsula is explored, orebodies of Aluminium, Copper, Gold

    Feb 6, 2023