  • ISEE
    Blasting Cost Minimization at Duvha Opencast

    By S A. Steyn, I P. Douglas

    Duvha Opencast is a large South African dragline operation supplying coal to the Duvha Power Station which is operated by Eskom, the state power utility. For Duvha to remain competitive with other col

    Jan 1, 1991

  • ISEE
    Using Machine Learning and Novel Algorithms to Predict Muckpile Shape and Throw to Engineer a Perfect Blast

    By Ravi Sahu, Brad Gyngell, Oktai Radzhabov

    Design machine learning approach to simulate the process of muckpile throw distribution before blasting.

    Feb 1, 2020

  • ISEE
    Carbon Monoxide Poisoning at a Swface Coal Mine . . . . A Case Study

    By Thomas Kovalchuk, Kenneth Eltschlager, William Shuss

    In April of 2000, two adults and their newborn infant, were poisoned by carbon monoxide in their home and received medical treatment at a Pennsylvania hospital. Carboxyhemoglobin levels were; child -

    Jan 1, 2001

  • ISEE
    Northern Link - Tunnel Blasting In Environmentally Sensitive Surroundings - Using NCVIB

    By Donald Jonson

    Stockholm’s Northern Link, currently Europe’s largest urban road tunnel project, will be about 5 km long from west to east. Running through two separate, mostly parallel tunnels, each with 2-4 lanes,

    Jan 1, 2009

  • ISEE
    Fragmentation and Throw due to Blasting – Role of Initiation Systems

    By K. Ram Chandar, Vedala Rama Sastry

    Fragmentation and muck pile profile together play an important role in optimizing the excavation costs for given geo-mining conditions. Initiation system is one of the vital parameters influencing the

    Jan 1, 2008

  • ISEE
    Specialized Blend and Delivery Equipment Optimize Emulsion/ANFO Applications

    By Thomas F. Mechtenberg, Michael S. Powell

    In the past several years many coal operators and stone producers have reduced drilling and blasting cost by utilizing Bulk Emulsion/ANFO blends. For many operators the cost of equipment to handle ble

    Jan 1, 1990

  • ISEE
    ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus Tests

    By E. Contestabile, B. von Rosen, P. Lightfoot

    As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the

    Jan 1, 2001

  • ISEE
    Differential Topographic Vibration ISO-Mapping

    By D T. Froedge

    A new system for acquiring blast vibration data and a method for presenting that data in such a way that there can be an extraordinarily enhanced insight into the understanding of vibrations produced

    Jan 1, 1989

  • ISEE
    Microseconds Matter in Monitoring

    By Gregory B. Poole

    Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on

    Feb 1, 2020

  • ISEE
    Burden Velocity Analysis

    By Patricia Mendoza Watson, Lundquist Robert G

    The velocity with which the burden moves after blasting is of concern for safety and economic reasons. Models developed for motion velocity by various researchers were reviewed and likely model parame

    Jan 1, 1990

  • ISEE
    Finite Element Simulation of Time-Dependent Fracture and Fragmentation Processes in Rock Blasting

    By M Oldenburg, P J. Digby, L Nilsson

    A constitutive model for the simulation of fracture and fragmentation processes in rapidly loaded rocks is studied. The model was included in a wave propagation finite element code. The results obtain

    Jan 1, 1985

  • ISEE
    Blast Wave Propagation in Underground Mines

    By Richard J. Mainiero, Eric S. Weiss

    This project investigates the behavior of blast waves from the detonation of high explosives in an underground mine. A series of explosive tests was conducted in the underground and surface facilities

    Jan 1, 1995

  • ISEE
    Test and Study on Hard Rock Blasting in Drift-Pilot of Qinling Tunnel

    By Qi Jingyue, Wang Zhongquian, Yang Nianhua

    Qinling Tunnel is the longest tunnel in China. The rock stratum is very hard rock - intact mixed gneiss. At the beginning of the construction, drift-pilot excavation is very costly due to the use of r

    Jan 1, 1998

  • ISEE
    Multiple Raise Round Blasting Technique

    By Dave I. McGregor

    The Multiple Raise Round Blasting Technique (MRRBT) is a safe, efficient, cost effective method of blasting thee will use existing mine personnel. The MRRBT, developed from the conventional 'drop rais

    Jan 1, 1994

  • ISEE
    Target Loading from a Submerged Explosion

    By Ulrich Leiste, Andrew Wardlaw, William Fourney

    This paper describes the loading on a plate suspended directly over an explosive charge submerged in water. This problem is of interest because it yields results similar to those obtained in the deton

    Jan 1, 2008

  • ISEE
    Applying Remote Sensing and Geographic Information Systems to Blast Designs

    By Laurence Neufville

    Proper risk assessment and blast design are very desirable to the execution of a blast. Not only will this ensure that it achieves its desired outcome, but the probability of complaints and litigation

    Jan 1, 2009

  • ISEE
    Post Blast Analysis in Coal Mining

    By Geoff Baldwin, Alastair C. Torrance

    The use of monitors to assess equipment performance is carried out on a routine basis in many industries. The benefits gained through process control in knowing exactly how the equipment is working fa

    Jan 1, 1990

  • ISEE
    Efficient use of energy to control bench damage

    By Elias Poulakidas, Marco Arellano

    The impact of a higher copper price on the open pit metal mining sector has derived in a faster and safer way in which the mining operation of broken and mineralised material is carried out. In this r

    Jan 1, 2008

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

    By David Harrison, Brian Harrison

    The Army Corps of Engineers completed the Charleroi Lock and Dam in 1932. It is located on the Monongahela river approximately 22 miles (35k) south of Pittsburgh in Charleroi, Pennsylvania. It is comp

    Jan 1, 2018

  • ISEE
    How to Control Blast Vibrations in an Urban

    By R E. Langston, S M. Gazioglu

    A preconstruction inventory program was conducted to determine the existing conditions of residential, non-residential and all other structures within 2,000 feet of the blasting limits for a highway e

    Jan 1, 1980