Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    An Assessment of Size Distribution of Rock Fragments from Blastin gin an Underground Hardrock Mine

    By F O. Otuonye

    Full-face blasts were fired in a 12 x 8 ft drift of an underground hardrock mine in a basalt formation with porphyry copper to study the effects of drill pattern and explosive type on the size distrib

    Jan 1, 1985

  • ISEE
    Determination of Dynamic Pressure and its Effect on Blasting

    By Ignacio Humeres Valdivia, Alejandro Ferrada Vergara

    In the latest years, the use of innovative blasting techniques has become more frequent in mines all over the world. Such techniques allow the miner to be more aggressive in the distribution of explos

    Jan 1, 2015

  • ISEE
    Dilution Control and Vibration Studies at an Underground Mine

    By B Mohanty, R Yang, M Leblanc

    A total of 33 blasts in the pillar recovery program at INCO-Crean Hill has been investigated by means of an extensive set of diagnostic techniques. These included, borehole deviation measurements, sto

    Jan 1, 1995

  • ISEE
    Longer Delay Periods Reduce Rockfall Hazard at a Contour Mine

    By Virgil J. Stachura, Larry R. Fletcher

    The Bureau of Mines conducted a series of delayed blasting experiments at a West Virginia contour coal mine which resulted in smoother highwalls. The highwalls were smoother due to reduced overbreak a

    Jan 1, 1985

  • ISEE
    Improving Blast Preformance with High Density Toe Loads

    By John Floyd, Larry Wardrip

    A series of tests were conducted to evaluate the performance of a high density, high velocity cartridged explosive. The tests included two production blasts in a limestone quarry and two production bl

    Jan 1, 2002

  • ISEE
    Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators Accuracy

    By J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris

    The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,

    Jan 1, 2012

  • ISEE
    Predicting Tunnel Overbreak

    By P. R. Mohanty, Kaushik Dey

    Blast-induced tunnel overbreak prediction in the past has been based on peak particle velocity measured far from the blast site with necessary extrapolation. This has often resulted in suggesting high

    Jan 1, 2004

  • ISEE
    "Frequency Adjustment" with High Accuracy Detonators

    By Ken C. Pruss

    Seismic studies have proven that the frequency with which shock or vibration waves are reacting on a structure, in correlation with the amplitude of those waves, has a definite affect of structural da

    Jan 1, 1989

  • ISEE
    MSHA Regulations and Bom Research Program on Multiple Short-Delay Blasting of Coal

    By J Edmund Hay, Harry C. Verakisl, Richard J. Mainiero, John J. Mulhern

    As the first stage in the rulemaking process, MSHA prepared requirements for the approval and use of permissible explosives and blasting items in underground coal mines. These draft requirements known

    Jan 1, 1985

  • ISEE
    Tunnel Lining Removal and Excavation by Controlled Blasting

    By Jeff Hammer, John McGregor

    "The Twin Tunnels, originally constructed in 1964, have become a major choking point for trafficheading up to and returning from the Colorado high country along the I-70 corridor. To increase traffic

    Jan 1, 2016

  • ISEE
    Implementation of Electronic Detonators at Barrick Goldstrike Mines, Inc

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    In March of 2001 Barrick Goldstrike Mines, Inc. began evaluating the potential benefits of electronic detonators at the Betze Post open pit gold mine. The original evaluation focused on increased frag

    Jan 1, 2004

  • ISEE
    Relating Horsepower to Drilling Productivity (315b5cd4-5d8d-4d24-b315-826af9c6ec5d)

    By Brian Wingfield, Rick Givens, Greg Williams

    Many technological advancements have been made in explosive products and applications over the last 15 years resulting in productivity and cost gains. However, the applications of total energy (engine

    Jan 1, 1996

  • ISEE
    Dewatering Small Diameter Bore Holes

    By R J. Hill

    Blasters are well aware of the problems and expense faced when trying to load in wet bore holes; problems of poor coupling and poor density, as well as the expense of higher priced cartridge product.

    Jan 1, 1986

  • ISEE
    Observation of Flyrock at Several Mines and Quarries

    By John W. Kopp

    The U. S. Bureau of Mines investigated flyrock and burden movement from blasting at several limestone and basalt quarries in the upper midwest. Blasts have been studied at 14 different sites using hig

    Jan 1, 1994

  • ISEE
    Relating Horsepower to Drilling Productivity

    By Brian Wingfield, Rick Givens, Greg Williams

    Many technological advancements have been made in explosive products and applications over the last 15 years resulting in productivity and cost gains. However, the application of total energy (engine

    Jan 1, 1996

  • ISEE
    Reactivity of ANFO Mixtures with Midwest High Sulfur Coals and Pyrites

    By John W. Brown

    For seventeen years, I have been involved in surface coal mining in the Mldwest coal fields only to find that once again, I have experienced a problem that was not known to exist in our area. The exis

    Jan 1, 1992

  • ISEE
    Blasting with Used Oil/Diesel Blend at Echo Bay Minerals - McCoy/Cove Mine

    By Sally Lynn Zadra

    "In May, 1994, Echo Bay Minerals - McCoy/Cove Mine petitioned for approval to recycle used oil formanufacturing ANFO. Recycling oil in this way will result in a cost savings for the minesite as well a

    Jan 1, 1996

  • ISEE
    Auditing Underground Development Drilling and Blasting

    By Thomas L. Barkley

    My historic auditing of Underground Drilling and Blasting Practices has demonstrated to the author the need for reviews of many mines' procedures in these processes. Poor understanding of the basic pr

    Jan 1, 2019

  • ISEE
    Effect of Fragmentation on Loader Efficiency

    By David Willock, S. Singh, Michael Glogger

    The efficiency of the loading system in a mine depends upon the characteristics of the muck pile, the loading machine specifications and the loading practices. The focus of this paper was to look spec

    Jan 1, 2001

  • ISEE
    Dynamic Shock Tests for Dynamite Slurry and Emulsion Explosive

    By Kenichiro Yamamoto, Masaharu Murakami, Toshio Matsuzawa, Yoshiyuki Ikeda

    In a series of tests, we examined the dynamic shock resistance of Emulsion Explosive in water and compared it with that of Dynamite and Slurry Explosives. Both the distance between donor and acceptor

    Jan 1, 1983