Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: 100 Years / MILITARY ENGINEERING (PART IV) MINING AND DEMOLITIONS General Staff, War Office, 1910 LONDON Copyright

    By Robert Hopler

    SECTION 9.---BORING AND BLASTING.*155. Blasting is the operation of bringing down and detaching from its bed or position masses of material by means of explosives.

    Jan 1, 2011

  • ISEE
    Modeling and Optimization of Wall Damage in Underground Stope Blasting

    By Abraham Lindo

    "Blasting plays a key role in hard rock underground mining. It is by nature a violent and destructiveextraction method designed to economically fragment the rock into a suitable size for it to be load

    Jan 1, 2016

  • ISEE
    Tunnel Excavation on the Abutment of an Existing Dam

    To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint

    Jan 1, 2016

  • ISEE
    Site Specific Blasting Model Using Schmidt Tensile Strength and Image Analysis

    By K. M. Kim, J. B. Kemeny

    A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main

    Jan 1, 2011

  • ISEE
    Variations in Vibration Signals from Single Hole Quarry Blasts

    By Rob Farnfield, Yuill Gavin

    The rock blasting industry continues to be under pressure to reduce the level of vibration induced by the use of explosives. In recent years much research and development has been directed to minimizi

    Jan 1, 2001

  • ISEE
    Planning for Optimum Dragline Performance

    By Mark A. Williams, James D. Humphrey

    Without question, draglines are one if not the most effective tools available to the surface mining industry for overburden handling. With few moving parts and a two- or threeman crew, this machine si

    Jan 1, 1990

  • ISEE
    AEL Ring 2000

    While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p

    Jan 1, 2000

  • ISEE
    Ground Motions from and House Response to Underground Aggregate Mining

    By Professor of Civil and Environmental Engineering Northwestern University, Mike Wladron, Gordon Revey

    A unique judicial opportunity allowed measurement of the response of three cracks in residential structure to blasting for underground aggregate mining. Instrumented cracks were located in the interio

    Jan 1, 2007

  • ISEE
    The Importance and Advantages of Accurate Calculation, Evaluation and Control of Dragline Methodologies

    By K B. Holm

    This paper deals with the advances made at Syferfontein Colliery in the calculation and control of dragline methodology. The high capital outlay and operating cost of a dragline necessitates strict co

    Jan 1, 1994

  • ISEE
    Drilling and Blasting in Environmentally Sensitive Areas

    By William Clark, Rick Taylor

    "Ajax Contracting was awarded the project to drill, blast and crush 100,000 tons of quarryrock for the Forest Service In Elk City, Idaho, during the summer of 1992. This projecttakes place in an area

    Jan 1, 1993

  • ISEE
    2000 Blasting in the New Millennium Won't You Be My Neighbor?

    By Ann Barron, Mark Abernethy

    Regardless of the care exercised by a blaster, seismic and acoustic effects produced by blasting can be disruptive and alarming to many people. With the general trend toward larger blasts, increased p

    Jan 1, 2004

  • ISEE
    Increased Blasting Efficiency Through Operational and Geological Controls on Ore Particle Size

    By W. Boas, R. Silva, D. Yumi, L. Steffen

    The continuity of the flow and stages within the mining process is essential to achieve success in its operation and results, especially when it comes to a gold mine. During the first seven months of

    Jan 1, 2024

  • ISEE
    Final Rock Slope Blasting Techniques: Considerations in Design and Execution

    By Michael F. Barber

    "Highway slopes are intended to remain stable over a long period of time. Unexpected slope failures can be costly in terms of human life and property damage or loss. Cleanup of failures can prove to b

    Jan 1, 1999

  • ISEE
    Space Age Explosives used to Fell Rocket Launch Towers

    By Jared Redyke

    Thursday, October 14, 1999 marked another important milestone for America’s space program. At exactly 10:05 AM EST on a beautiful, sunny Florida morning, Dykon, Inc. of Tulsa, Oklahoma detonated appro

    Jan 1, 2001

  • ISEE
    Response of Manufactured Houses to Blast Vibrations

    By Michael Mann

    Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl

    Jan 1, 2000

  • ISEE
    Applying the Concept of Difficulty of Tunnelling to Brazilian Cases

    By Luiz Guilherme Isfer Maciel, Marilena Cardu, Fernando Golin, Jacopo Seccatore

    "This study applies the concept of the difficulty of tunnelling by drilling an blasting (D&B) to selectedcases from the Brazilian tunnelling industry. The difficulty of tunnelling has been defined in

    Jan 1, 2017

  • ISEE
    Effects of Decoupling and Simultaneous Detonation on Blast Vibrations

    By Rodney D. Lamond

    The need for blast vibration monitoring can be attributed to a combination of three factors: Structural damage, Blast design and Human annoyance. Traditionally, vibration damage criteria are prescribe

    Jan 1, 1995

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Integration of Big Data from Drilling and Blasting for Plant Throughput Optimization at Constancia Mine

    By Hernan Escalante, Jonathan Alvis, Paulo Alcazar

    Constancia Mine, operated by Hudbay Perú and located in the district of Velille, Chumbivilcas province, Cusco, is an open-pit operation characterized by low-grade ore. In this context, operational eff

    Jan 26, 2026

  • ISEE
    Remotely Piloted Aircrafts (RPAs) as an Everyday Tool for Quarry Planning and Blast Design.

    By Jose Luis Pineda Villarreal

    New technologies emerge every day with practical applications for open pit mining. For every operation, managers need to understand the best way to increase efficiency in drilling, blasting, fragmenta

    Jan 1, 2018