Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Selection of Powder Factor in Large Diameter Blastholes (fd85c28b-31b4-4c7a-b833-27f2a5d736a0)

    By Jack Eloranta

    This paper documents the relationship between material handling and processing costs compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this case

    Jan 1, 1995

  • ISEE
    Record Blast at Iron Ore Company of Canada

    By D. Scott Scovira, Rick Webber

    The Iron Ore Company of Canada [IOC] is a global leader in Arctic mining applications, and the blasting crew have something to be very proud of. On Wednesday 21 Dec 2005 at 3:28 PM the largest single

    Jan 1, 2008

  • ISEE
    Budget Model Data of Drill and Blast Tunnelling in Brazil

    By Pedro C. Carneiro, Luiz G. I. Maciel

    "This article presents data of advance and excavation rates in tunnelling works, and how theseactivities interact with the duration and cost of a contract. These key parameters, after analysis andsynt

    Jan 1, 2016

  • ISEE
    Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, Florida (307cb8ee-5b0c-48e5-806c-57d316a0ab82)

    By Doug Wathen, Philip M. E Thomas

    The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational

    Jan 1, 1996

  • ISEE
    Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, Florida

    By Doug Wathen, Philip M. E Thomas

    The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational

    Jan 1, 1996

  • ISEE
    Primex Detonating Cord We Process Production Method

    By R C. Sittig

    The manufacture of commerical detonating cord by the "wet process" technique is discussed. Raw material variability as a potential source of production problems is examined. Comparison to the "dry pro

    Jan 1, 1976

  • ISEE
    Effect of Geology on Burden Displacement

    By Rahim G. Haghighi, Calvin J. Konya

    Fragmentation is the fundamental concern of rock blasting and it measures the effectiveness of blasting. Fragmentation is sensitive to not only the interrelationship among the design variables, but al

    Jan 1, 1986

  • ISEE
    Evaluation of Safety in Pre-Loading Emulsion Explosives at Sulfide Mine

    By Zhang Shixun, Wang Xuguang, Wang Guoli

    A massive millisecond blast at an open-pit mine of large scale can be realized by using the blasting technology of pre-loaded explosives, which can enlarge production scale, reduce the frequency of bl

    Jan 1, 1998

  • ISEE
    Blasting and Excavating on Precarious Rock Slopes

    There is an intuitive tendency to equate rock strength with rock stability, yet the two must be evaluated separately. A slope in strong hard rock is not necessarily stable, nor is a slope in weathered

    Jan 1, 1996

  • ISEE
    Quality-Controlled Blasting At Hobet Mining Inc.

    By Jim Simpson, John Waller, Scott Stewart

    The authors review the evolution of drilling and blasting procedures at this West Virginia surface coal mine where management seeks continually to improve and update the drilling and blasting programs

    Jan 1, 1992

  • ISEE
    Rock Blasting Environmental Impacts

    By Carlos Agreda

    The rock blasting environmental impacts such as: flyrock, groud vibrations,airblast,and/or noise, dust and fumes are identified and mentioned. Some comments on the correction factors that might be tak

    Jan 1, 1995

  • ISEE
    Refinements in Blasting Practices at Minntac Mine

    By B Kniivila, A B. Andrews, T Lerick, Keith Jansen

    Minntac Mine is a large, open pit taconite mine located at the center of the Mesabi Iron Range in northern Minnesota. The planned development of the Mine in the direction of nearby communities prompte

    Jan 1, 1984

  • ISEE
    Improper Spacing; a Major Problem with Surface Blasting

    By Richard L. Ash, Calvin J. Konya

    Proper selection of the spacing distance between blastholes is fundamental to successful blasting. Its value directly affects the profitability of an operation. It also exercises control over adverse

    Jan 1, 1979

  • ISEE
    Prediction and Determination of Explosive-Induced Fracture

    By J R. Hearst, T R. Butkovich

    Explosive-induced fracturing and permeability enhancement far from a free face were studied. A one-dimensional computer program, SOC, was used to predict the total failure-associated distortional stra

    Jan 1, 1976

  • ISEE
    Multi-Blasthole, Multi-Row, Detonation Delay timing Simulation of Rock Blasting Using DMCBLAST_3D

    By Dale Preece, Stephen Chung

    Development of DMCBLAST-3D is continuing and now includes the capability to simulate the detonation of multiple blastholes in multiple rows that make up a conventional bench blast, either in a rock qu

    Jan 1, 2002

  • ISEE
    Modern Blast Engineering to Improve Mine Profitability

    By Josh Campbell

    Modern blast engineering involves the use of modern technology to provide more efficient blasts. Through the use of improved measurement techniques more information can be obtained on many of the phys

    Jan 1, 1998

  • ISEE
    Blasting at Cyprus Northshore Mining Company - A New Approach to Mining Taconite at an Old Mine

    By Thomas L. Barkley, Michael A. Indihar

    The new Cyprus Northshore Mining Co. has taken the previous blasting methods of Reserve Mining Co.'s mine in northern Minnesota and adapted them to a new competative Iron Ore Industry. Cyprus was chal

    Jan 1, 1991

  • ISEE
    Increased Productivity through Frost Blasting

    By Terry Graf, Bill Thompson, John Guenther

    SYNCRUDE CANADA LTD.. operates the largest synthetic crude oil production facility in the world. Over 60,000,000 Bank Cubic Metres of oil sand is mined each year from their open pit located in Fort Mc

    Jan 1, 1993

  • ISEE
    Implementation of a Statistical Process Control (SPC) Program to Evaluate and Improve Blast Performance

    By Michael D. Duffy, Martin W. Chenoweth

    "Tenn Luttrell Company (TLC) is a major lime and limestone producer in the eastTennessee area. The property, which isreferred to as the Chesney Mine, has been mined from the surface and underground ov

    Jan 1, 1993

  • ISEE
    Capture of a Groundwater Contamination Plume in Fractured Bedrock by an Artificially Produced Fracture Zone Created Through Controlled Blasting

    By Robert J. Nothnagle, Kristen Franz Begor, Rodney W. Sutch

    Recovery of contaminated groundwater in a fractured bedrock system presents some unique problems. Typically, the most common problem occurs from the inability to adequately characterize the discrete f

    Jan 1, 1988