Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improving Productivity at Farco Mining of Texas Using Emulsion/ANFO Blends

    By Nick Lewis

    Farce Mining of Texas is a surface coal mine located in Laredo, Texas. Farce mines and sells approximately 600,000 tons /year of bituminous coal. A map showing the location of Laredo is provided in F

    Jan 1, 1994

  • ISEE
    Analysis of Dynamic Stability of Rock Slope Under Loading of Blast Induced Seismic

    By Wenbo Lu

    A combined method is present in this paper in analysis the dynamic stability of rock slope under the loading of blast induced seismic, in which, by combining the dynamic load calculating method of qua

    Jan 1, 1999

  • ISEE
    Recent Projects - Perfect Landing Hyatt Regency Hotel Razed for Airport Expansion

    By Brent Blanchard

    Dallas/Fort Worth Airport recently took a major step in its fiveyear expansion project with the explosive demolition of the Hyatt Regency Hotel West. Built in 1965, the Hyatt Regency held the distinct

    Jan 1, 2003

  • ISEE
    Dynamic Mud Flow Effects on Emulsion Explosives in Indonesia

    By Garfiansyah Rayes

    In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr

    Jan 21, 2025

  • ISEE
    Displacement Control of Uncrushable Materials from Underground Mining Interacting with Open-Pit Operations Through Three-Dimensional Simulation

    By Hector O. Romero, Paulo C. Fernández A, Christian Rees Prado, Claudio C. Gajardo

    In open-pit mining operations, the presence of remnants from past underground labors represents a significant operational challenge, especially if they are in the surroundings of high-grade zones. The

    Jan 26, 2026

  • ISEE
    Geomechanical differentiation of cratering mechanisms with two degrees of freedom and burden dependency investigated through single hole blast tests.

    By J. D. Aubertin

    Rock blasting is a complex engineering process that requires in-depth knowledge of operations and geomechanical conditions. Acknowledged design precepts are based on cratering behavior associated with

    Jan 1, 2024

  • ISEE
    Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock Conditions

    By Luis Huaroc, Jorge Cardenas, José Salvador

    One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents

    Jan 26, 2026

  • ISEE
    Improving stope productivity with wireless initiation.

    By Luan Monteiro, Francisco Biulchi

    The AngloGold Ashanti - Cuiaba mine sought innovative approaches to minimize lateral development and stope extraction time while maintaining optimal gold recovery and minimizing dilution. The stope 8G

    Jan 21, 2025

  • ISEE
    A Survey to Better Understand Collegiate Talent for Recruiting Purposes

    By Paul Sainato

    Recruiting and retaining students in the explosives industry is becoming increasingly important each year. With no undergraduate degree in explosives engineering currently available in the United Stat

    Jan 1, 2016

  • ISEE
    Response of Manufactured Houses to Blast Vibrations

    By Michael Mann

    Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl

    Jan 1, 2000

  • ISEE
    Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole Stoping

    By Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall

    Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific

    Jan 1, 2018

  • ISEE
    A Quantitative Triple Bottom Line Mine to Mill Process Evaluator

    By X. Gumede

    A model is being developed to quantify the benefits for mining houses resulting from the reduction in greenhouse gas and energy consumption by the application of innovative blast designs in addition t

    Jan 1, 2012

  • ISEE
    Wall Control Blasting Practices at Kisladag Gold Mine

    By Ekin Güngor, Berkant Ozdemir, Erkan Bayrak, Serdar Ergün, Sedat Esen

    "This paper presents the final wall blasting practices at Eldorado Kisladag Gold Mine in Turkey. Benchmark and improved wall control designs were explained in detail. Kisladag Mine has been implementi

    Jan 1, 2017

  • ISEE
    Comparison of Micro-Inch In-Plane and Out-of-Plane Resoponse of Cracks to Blast Vibration and Weather

    By Jeffrey Meissner, Mike Waldron, Charles Dowding

    Most studies of crack response have focused on opening and closing of a crack in the plane of the wall in which the crack occurs. Crack movement also occurs perpendicular or normal to the plane of the

    Jan 1, 2010

  • ISEE
    Prototype gauges for measuring detonation temperature and pressure of commercial explosives

    By A. Torrance

    A better understanding of the detonation performance of an explosive charge can be gained by directly measuring pressure, temperature and velocity of detonation (VOD). This is particularly important w

    Jan 1, 2011

  • ISEE
    Timing Effects on Fragmentation

    By C. Braun, C. Kennedy, P. Katsabanis

    A series of small scale tests, simulating multi-hole blasts have been performed to establish the effect of delays on blast fragmentation. The blasts were performed in high quality granodiorite blocks,

    Jan 1, 2006

  • ISEE
    Large Arena Test Simulator Using Small High Explosive Charges.

    By Paul Worsey, Larry Frost, Braden Lusk, Seok Bin Lim

    For certification of blast resistant windows, current tests consist of arena tests or large air gun tests. Arena tests involve the detonation of more than 1000 pounds of explosives with windows placed

    Jan 1, 2006

  • ISEE
    How to Achieve 100% of Advance in Tunnel

    By Alan Diaz Butron, Eng. Thierry Bernard

    "In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by

    Jan 1, 2017

  • ISEE
    Practical Blasting Damage Investigating for Insurance Claims and Law Suits

    By David A. Paul

    Over the past several years a great deal of information on blasting vibrations and their effects on structures has been generated. Much of this knowledge has been gained through the use of ground vibr

    Jan 1, 1983

  • ISEE
    A Review of Rock Classification Methods and Applicability to Blast Design

    By Hae-Moon Choi, Sang-Don Lee, Hee Soon Shin, Choon Sunwo, Chang-Ha Ryu, Hyun-Koo Lee

    Building tunnels means dealing with what rock is encountered. Relocation of the site of the underground structure is rarely possible. Tunneling engineers and miners have to cope with the quality of th

    Jan 1, 2004