Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine ProductivityBy Tyler Rockley, J. P. Remi Proulx, Ruilin Yang
A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr
Feb 1, 2020
-
Alternatives to Shovel/Truck Pre-Stripping: Three Case StudiesBy Richard R. Marston, Scott Herr, Steve Pries, Donald L. Jr Ewart
The purpose of this paper is to identify and examine alternative methods (other than shovel/truck stripping) of effecting the pre-stripping of consolidated overburden, in conjunction with dragline str
Jan 1, 1992
-
Industrial Risk Assessment and its Applications to Commercial ExplosivesBy David Leidel
A major characteristic that distinguishes modern society from its predecessors is the understanding that events are not driven by the whims of the gods, pre-ordained fate or nature, but are controlled
Jan 1, 2007
-
Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators (3c055ade-7146-4060-a860-4133718a0454)By Michael S. Wieland
This report focuses on the U.S. Bureau of Mines research regarding desensitization and malfunction of delay detonators and cap-sensitive explosives. Delay blasting in underground coal generates tremen
Jan 1, 1992
-
Trial Study--Self Consuming Detonators to Reduce Ore ContaminationBy Kurt B. Oakes, Brian M. Fortelka
Unimin Corporation operates an underground Silica Sand mine at Guion, AR located in North Central Arkansas. The Silica Sand deposit at Guion is part of the St. Peter Sandstone Formation, which is over
Jan 1, 1999
-
Modeling of rock fragments trajectories ejected from blasting based on high-speed video analysisBy Jaime Herrero, Santiago Gómez, Pablo Segarra, José Ángel Sanchidrián
This paper presents a mathematical model for the study of the 2D movement of blast bench faces based on the high-speed video analysis of three blasts at El Aljibe quarry (Spain) recorded at 2,000 fram
Jan 26, 2026
-
Business Improvement through Mentoring at a Natural Resources CompanyBy Shannon Studden, Angela King, Allan Koski
Cliffs Natural Resources is an international mining and natural resources company with over 160 years of history. A member of the S&P 500 Index, the company is a major global iron ore producer and a s
Jan 1, 2014
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power PlantBy Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001
-
Blasting to the Rescue, Underwater Concrete Bridge-Pier DemolitionBy Jerry Wallace
A highway bridge demolition project to allow shipping access to a new container port in Puget Sound ran into trouble when contract-stipulated mechanical means of demolition failed. Blasting was then e
Jan 1, 1999
-
The Literature of Explosives and BlastingBy Robert Hopler
The literature of explosives and blasting consists of a great variety of printed materials. These materials include technical papers, books, and articles by individuals and organizations; manufacturer
Jan 1, 2000
-
Fixortm -A New Approach to Neutralizing Landmines and UxoBy Bill Bauet, John Anderson
There are always security concerns when explosives are transported and stored, and these concerns are intensified in peacekeeping operations where explosives could fall into the wrong hands. MREL Spec
Jan 1, 2001
-
Using Vibration Prediction to Reduce Blasting Costs and ComplaintsBy Thomas Leonard, Philip R. Berger, Bryan E. Papillon
Bardon Trimount Inc., a large producer of aggregate, crushed stone, and concrete, was experiencing significant public opposition to its five quarries in the Boston area. It was believed by the authors
Jan 1, 1996
-
Rock Mass Identification Prior To Blasting: Reasons And MethodBy Anne Charline Sauvage
Blast designers and blasters need to know the rock mass influence on blast to increase explosive effi-ciency and to optimize costs, but also to succeed in limiting blast emissions (vibration, overpres
Jan 1, 2013
-
Dual Delay Detonators: a Practical Solution to Blasting ProblemsBy John T. Watson, Jim Bailey
Increasing public awareness is probably the single most important challenge faced by any blasting contractor today. This increased awareness usually results in an outcry for tighter regulations and r
Jan 1, 1990
-
New Photo-Optic System for Adaptation to Measure VODBy William H. Snyer
A relatively inexpensive, very fast response photo-optic/fiberoptic system has been conceived, constructed and employed by Denver Research Institute (DRI) to measure charge breakout uniformity on the
Jan 1, 1990
-
Planning for Optimum Dragline PerformanceBy Mark A. Williams, James D. Humphrey
Without question, draglines are one if not the most effective tools available to the surface mining industry for overburden handling. With few moving parts and a two- or threeman crew, this machine si
Jan 1, 1990
-
The Neglected Step to Accurate Blast Monitoring: Proper CouplingBy Donelson A. Robertson
Proper coupling between the seismograph transducer and the surface is the most important aspect of seismograph monitoring but probably receives the least attention in many blasting situations. Without
Jan 1, 1993
-
Comparison of Techniques Used to Develop a Slot RaiseBy Mauro F. Dobran
The use of Slot Raises has been common for many years. The following presentation will compare various methods of developing these Slot Raises and introduce two new ones.
Jan 1, 1996
-
Predicting and Controlling Ground VibrationBy James W. Reil, Douglas A. Anderson
Blast vibration monitoring has generally been regarded as a necessary evil. New instrumentation and computer programs can change this. Rather than the usual trial and error methods to control vibratio
Jan 1, 1989
-
The History of Perimiter Blasting at the Homestake MineBy Justus Deen, Paul Sterk
Overbreak into the wall rock of a development drift leads to the inevitable need to rehabilitate a drift. Moreover, overbreak in a production heading can lead to external dilution and lower ore grades
Jan 1, 1997