Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A continuous quality improvement framework for electrowinning current efficiencyBy S. Michael, T. E. Moongo
Electrowinning consumes a substantial amount of electrical energy, and owing to the ever-increasing unit cost of electrical power there is a need to improve current efficiency in the process. This res
Jan 1, 2021
-
Optimisation and Prediction of Co3+-Enhanced Dissolution in Sulfuric AcidBy B. Mbuya, A. F. Mulaba-Bafubianda, J. M. Mvita
The paper explains the main effects of input leaching parameters, such as addition of a reducing agent, acidity, agitation, temperature, and leaching system potential, in relation to observed and pred
Jan 1, 2023
-
Innovative Process Design for Copper-Cobalt Oxide Ores in the Democratic Republic of CongoBy C. van der Merwe, R. Lumbule, J. Kgomo
"The mining industry in the Democratic Republic of Congo has seen a significant expansion in copper and cobalt production in recent years. The greater proportion of this expansion has arisen through p
Nov 1, 2018
-
Performance Optimization of an Industrial Gamma Activation Assay System for Analysing Gold and Rare Metal OresBy A. Sokolov, M. Demsky, E. Hasikova, V. Gostilo
"Previously, we upgraded and implemented two gamma activation assay (GAA) systems designed to analyse the gold content in raw ores at Zarafshan laboratory, Uzbekistan, and achieved a detection limit o
May 1, 2019
-
Effect of crushing chamber filling on the performance of cone crushers – the Sarcheshmeh copper complex case, S. Zare, M. Yahyaei, M. Mahmoudi, M. Maleki-Moghaddam, and S. BanisiBy S. Banisi, S. Zare, M. Mahmoudi, M. Maleki-Moghaddam, M. Yahyaei
As the orebodies become more complex and lower grade, there is an increasing demand from crushing circuits for a finer product. When the product from a crushing circuit does not satisfy the requiremen
Jan 1, 2020
-
Resource Estimation for Deep Tabular Orebodies the Anglogold Ashanti WayBy T. Flitton, R. Peattie
"The extreme depths and consequent expense of drilling and sampling the gold-bearing reefs of the Witwatersrand Basin have resulted in limited data being available for estimation of grade ahead of the
Jan 1, 2016
-
A Forecast of the Coal and Uranium Requirements For Electric Power Generation in South AfricaBy K, J. MAUNDERS
This paper briefly describes a computerised model of the South African electricity system which has been developed jointly by the Atomic Energy Board and the Electricity Supply Commission. The results
Jan 1, 2014
-
Optimizing the Public Gains from the Exploitation of Mineral Resources (2176cd36-e44e-4bbb-9bd9-109a940939d6)By J. Zwartendyk, A. Azis
"Every nation must decide how it should exploit its mineral resources so as to contribute most to its national objectives. It is argued that the present value of the future corporate income tax flow d
Jan 1, 2014
-
Applications of collectors containing thioamide groups in the flotation of copper, copper-molybdenum, and gold ores, V.I. Ryaboy, V.P. Kretov, and I.V. RyaboyBy V. I. Ryaboy, V. P. Kretov, I. V. Ryaboy
Attachment of collectors containing thioamide groups to sulfide minerals is interpreted as interaction between NH-acids and sulfides acting as solid bases with the formation of a donor–acceptor reagen
Jan 1, 2020
-
Modelling unsaturated dual-phase flow through crushed ores for heap leachingBy J. Petersen, S. W. Robertson
Heap leaching is used extensively for the processing of low-grade copper, gold, and uranium ores. The hydrodynamics is often the most important factor that limits the rate of metal recovery. Over the
Dec 11, 2024
-
A critical review of initial Resource and Reserve tonnage estimation and reportingBy L. Roux
This review was initially motivated by the author’s own experience in attempting to reconcile run-of mine production tons with the Coal Resource and Reserve estimation of mineable, in-situ tonnages. T
Nov 1, 2021
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
Optimizing Medium-Term Operational Plans for a Group of Copper Mines (476b3df3-c089-4b00-9560-1bbd80974db2)By M. Splaine, W. Davison, D. C. Atkinson
"Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium
Jan 1, 2014
-
Kimberlite-Country Rock Contact Delineation at Finsch Diamond MineBy M. Matabane, T. Khati
"Accurate delineation of the contact between a kimberlite pipe and country rock at production level depths is a challenge due to limited geological data. Geological information is obtained from widely
Feb 1, 2019
-
Selection of solution for desorption of rare-earth metals from cationite saturated by ions of these elements from extraction phosphoric acid, M.A. Naimanbayev, B.K. Kenzhaliyev, N.G. Lokhova, and Zh.A. BaltabekovaBy B. k. Kenzhaliyev, M. A. Naimanbayev, Zh. A. Baltabekova, N. G. Lokhova
In research various desorbents were used to desorb the following rare-earth metals from Purosorb 140 cation exchanger, i.e. ammonium chloride; ammonium sulfate; a mixture of nitric acid and ammonium n
Jan 1, 2020
-
Heavy-medium and gravity separation at Iscor's tin-ore and iron-ore minesBy H. C. Voges
The concentration of cassiterite at Iscor's Uis Mine is described, and information is given on aspects of the concentration of iron ore at Thabazimbi and Sishen Mines. At Uis, a very Iow-grade ti
Jan 1, 1982
-
Application of fuzzy set theory in the selection of underground mining method - SynopsisBy A. Karadogan
Decision making can be defined as the selection process of the best routes from the alternatives in order to achieve a goal, and mostly involves uncertainty. Additionally, mostly qualitative variables
Jan 1, 2008
-
The viability of using the Witwatersrand gold mine tailings for brickmakingBy S. Ndlovu, M. Malatse
"The Witwatersrand Basin is the heart of South Africa’a gold mining industry. The cluster of gold mines located in the Witwatersrand Basin generates a significant amount of mine tailings, which have a
Jan 1, 2015
-
On the accuracy of discrete element method (DEM) simulations: Rolling friction effects, E. Nematollahi, A. Ghasemi, and S. BanisiBy S. Banisi, A. Ghasemi, E. Nematollahi
Discrete element method (DEM) has been used as a popular simulation method to verify designs by visualising how material will flow through complex equipment geometries. Although DEM simulation is a po
Jan 1, 2020
-
Metal Accounting And Corporate GovernanceIn the wake of the financial crisis that affected world markets in 2002, there has been an increasing international focus on corporate governance. Various corporate governance codes of practice have b
Jan 1, 2014