Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Potential Changes In The Physical Beneficiation Processes That Can Improve The Recovery Grade Or Costs For The Platinum Group MetalsBy J. Engelbrecht
Understanding the deportment of minerals in size fractions has already led to improvements in the flow sheets for platinum minerals beneficiation. There are, however, more potential changes in the
Jan 1, 2012
-
Chemical wear analysis of a tap-hole on a SiMn production furnaceBy M. Tangstad, J. D. Steenkamp
In April 2013 a 48 MVA submerged arc furnace producing silicomanganese was excavated in South Africa. Since the high shell temperatures recorded in the tap-hole area resulted in the furnace being swit
Jan 1, 2015
-
An Optimization Procedure For The Secondary Cooling Zone Of A Continuous Billet CasterBy D. deV. van der Spuy
A procedure for optimizing the secondary cooling zone of continuous casters is proposed and illustrated by a billet caster example. The procedure consists of quantifying deviations from the required c
Jan 1, 1999
-
Fire and brimstone: The roasting of a Merensky PGM concentrateBy P. den Hoed, R. I. Rambiyana
"Four sulphide minerals - pyrite (FeS2), pyrrhotite (Fe1-xS), pentlandite ([Ni,Fe]9S8), and chalcopyrite (CuFeS2) - contain the base metals and most of the iron in concentrates of platinum group metal
Jan 1, 2015
-
Underwind And Overwind Protection Systems With Enhanced Self-Sufficiency (030db833-15eb-45bc-a368-bd664b61eafa)By N. D. L. Burger
Underwind and overwind protection system concepts for mine hoist shafts were developed in conjunction with and for the Safety in Mines Research Advisory Committee (SIMRAC). End-of-wind operation of mi
Jan 1, 2004
-
Seminar on Reactivity of Lime in Steel MakingA Seminar to discuss 'Reactivity of Line in Steel Making' was held in the auditorium of Iscor's Headquarters Building in Pretoria on the 5th August, 1971. The Institute organised thi
-
Grinding process modelling and circuit analysis in a copper mine, T. Song, T.H. Yang, J.W. Zhou, and Q.K. WangBy T. H. Yang, Q. K. Wang, T. Song, J. W. Zhou
The grinding circuit can be one of the most important mineral processing circuits in plants. Along with the application of large-scale milling machines, the design and optimisation of the operation st
Jan 1, 2020
-
Author's ReplyDr Hanekom I would like to thank Dr Hanekom for a very valuable -contribution; it summarizes careful statistical test work which was an omission from the original paper. Minor manipulative details, t
-
SPOTLIGHT on project management in the metallurgical industryBy J. D. Koch
The past ten years or so have seen many changes in the methods and approach adopted for projects in the metallurgical and mining industry in South Africa. These changes have led to an increased use by
Jan 1, 1981
-
Recovery of lithium from spodumene by chlorination roasting, P.F.A. Braga, S.C.A. França, C.P. Pinto, and G.D. RosalesBy G. D. Rosales, P. F. A. Braga, S. C. A. França, C. P. Pinto
The growing market demand for lithium is mainly due to its use in the manufacture of batteries for electric or hybrid vehicles and portable equipment (smartphones, tablets, power tools, notebooks, etc
Jan 1, 2020
-
Probabilistic Mine Design Methods To Reduce Rockburst RiskBy F. M. C. C. Vieira
There are many uncertainties that a mine designer should consider when selecting an optimal layout. Even though the inherent variability in the design parameters indicates that single-values are not r
Jan 1, 2002
-
Development Of A Vibration-Absorbing Handle For Rock DrillsBy J. P. D. Strydom
The transmission of excessive vibration to the human body can cause physical stress that may result in crippling pain or permanent disability. Rock drills are known to transmit high levels of vibratio
Jan 1, 2002
-
Strategic long-term planning at Anglo Platinum - SynopsisBy G. L. Smith
This paper consolidates the key elements of seven contributions, on strategic long-term planning, to two of the three international conferences on Strategic versus Tactical approaches in Mining held o
Jan 1, 2009
-
Modern materials for underground supportBy M. McChesney
Modern materials for underground support* by M. McChesney The properties required of a support material for underground tunnels are discussed and, because concrete is both economical and easy to apply
Jan 12, 1976
-
Improvements in stope drilling and blasting for deep gold minesBy N. G. Cook, N. C. Joughin, A. J. A. White
The rate of face advance in the gold mines is between 3 and 10 m a month, with a median value of about 5 m a month; it follows that faces are blasted less frequently than is planned. There are many ad
Jan 1, 1975
-
Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, ZambiaBy E. Munnik
The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir
Jan 1, 2003
-
Physical and numerical modelling of a four-strand steelmaking tundish using flow analysis of different configurationsBy J. H. Cloete, S. M. Bradshaw, D. K. Chibwe
"The primary function of a tundish in the steelmaking industry is to serve as a buffer tank, accepting molten steel from the batch ladle process and allowing it to be cast continuously. However, moder
Jan 1, 2014
-
SPOTLIGHT on the role of the geologist in the estimation of ore reservesBy H. H. Bird
The crux of reliable estimates of ore reserves lies in a comprehension of the related geological events and their controls on the formation and distribution of the economic mineralization, and on the
Jan 1, 1980
-
Comparison of continuous and discontinuous modelling for computational rock mechanicsBy T. Scheldt, M. Lu, A. Myrvang
Abstract: In this paper both continuous and discontinuous modelling are utilised in order to analyze the stability of the Gjøvik Olympic Mountain Hall. The large span cavern (62 m) was built for the 1
Jan 1, 2003
-
The presinking of Harmony No. 4 shaft by use of the MA TLA headgearBy I. M. W. Preston
A new shaft system was required to replace stope face for the North Section of Harmony Mine and to allow for systematic opening up of the North Eastern Section. Owing to the economic circumstances at
Jan 1, 1983