Application Of A High-Intensity Cooling System To DC-Arc Furnace Production Of Ferrocobalt At ChambishiBy L. R. Nelson
A review is presented of the furnace cooling system design and operating developments since the initial furnace start-up in January 2001 of the Chambishi DC-arc furnace to produce ferrocobalt alloy. T
Jan 1, 2004
-
From Graduate Metallurgist to Effective Process Engineer: The Metcelerate ProgrammeBy J. Cilliers, R. Seitz, D. Drinkwater
Mineral processing produces a saleable product from high-cost ore. The Mineral Processing Engineer must constantly improve the separation to create the most value from the ore and reduce the associate
Jan 1, 2023
-
Relationships between comminution energy and product size for a magnetite ore - SynopsisAn extensive laboratory grinding study was carried out on a magnetite ore in order to assess the grinding behaviour of magnetic concentrate and tail from low intensity magnetic separation (LIMS).The t
Jan 1, 2010
-
A Set Of Indices Based On Indentation Tests For Assessment Of Rock Cutting Performance And Rock PropertiesBy H. Copur
Experimental studies for quantification of force and brittleness indices relevant to rock cutting performance are presented. A simple interpretation method is developed, which quantifies the force-pen
Jan 1, 2003
-
The Transfer Of Knowledge Produced By The DEEPMINE Research Programme: A Critical EvaluationBy R. J. Durrheim
The DEEPMINE Collaborative Research Programme was established to create the technological and human resources platform that would make it possible to mine gold safely and profitably at depths of 3 to
Jan 1, 2002
-
Optimizing yield of metallic zinc tapped from a zinc smelter by studying factors causing zinc losses to dross - SynopsisBy A. de Meyer
Zincor experienced significant losses of metallic zinc to dross during the melting of zinc cathode plates. In this study five factors affecting the formation of dross are identified from literature. D
Jan 1, 2010
-
Electronic Delay Detonators - A Unique Solution To Pertinent Mining Problems (VOLUME 105 )By R. Banda
This paper describes the decision to implement and then the implementation itself, through trials, of electronic ?Smartdets? over previously used shock tubes. It concludes that Mufulira Mine has becom
Jan 1, 2005
-
Development Of A Viable Process For The Recovery Of Zinc From Oxide OresThe Skorpion Zinc Project demonstrated the viability of the production of zinc from non-sulphide (commonly called ?zinc-oxide?) ores, using the leach/solvent extraction/electrowinning process route. T
Jan 1, 2008
-
A Fluid Dynamics Simulation Of Chromium Recovery From AOD Slags During Reduction With Ferrosilicon AdditionsBy Z. Lin, M. Isac, R. I. L. Guthrie
The kinetic and thermodynamic efficiencies of chromium recovery from the slag in an AOD process during the slag de-oxidation period with ferrosilicon is a complex process affected by slag basicity, te
Jan 1, 2004
-
The Effect of Geological Uncertainty on Achieving Short-Term Targets: A Quantitative Approach Using Stochastic Process SimulationBy M. Soleymani Shishvan
"Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random v
Jan 1, 2016
-
A study of internal overburden dump design and stability analysis for Hazelwood Power Mine, Latrobe Valley, Victoria, AustraliaBy D. Nag, J. Fernando
Hazelwood Power Mine is one of the largest open pit brown coal mines in Australia. The removal of overburden is the first step in coal winning operation. The primary aim of construction of overburden
Jan 1, 2003
-
Blast optimization at Kriel Colliery - SynopsisBy A. M. Neale
Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe
Jan 1, 2010
-
Author's ReplyDr Hanekom I would like to thank Dr Hanekom for a very valuable -contribution; it summarizes careful statistical test work which was an omission from the original paper. Minor manipulative details, t
-
Design of lining system for a pressure tunnel on the base of interaction between rock and liningBy A. Kazemi, M. A. Ahmadi
Pressure tunnels are constructed nurously in related with powerhouse. In some cases, according to high internal water pressure, rock mass around tunnel can seldom suffer this pressure. So installation
Jan 1, 2003
-
Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis (443bbb20-5eab-43f3-85de-c6c40fb656b6)By Ö. Erdem
The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (
Jan 1, 2012
-
The Standard Reactivity Test As A Measure Of Lime?s QualityBy J. H. Potgieter
The method used to assess the reactivity of lime was evaluated to gauge it usefulness as a quality control tool. The effect of particle sizes, different lime and water masses for a fixed s:l ratio and
Jan 1, 2002
-
Spinel Removal From PGM Smelting FurnacesBy A. R. Barnes, A. F. Newall
Keywords: Pyrometallurgy, furnace, smelting, spinel, PGM, phase diagrams As Merensky reef ores are replaced by UG2 ores, chromium levels in PGM smelting furnace feeds have steadily increased. Inc
Jan 1, 2006
-
The application of “Optimine” to evaluate risks associated with extraction of a remnant pillar at depthBy S. K. Murphy, K. B. Le Bron, A. K. Ward, S. Hayes, T. Rangasamy
A process for evaluating different options for extraction of mining blocks is presented. The process is described and an example of the application of the process to a case study is presented.
Jan 1, 2003
-
Study on photodegradation performance and mechanism of novel light-sensitive copper-molybdenum separation, inhibitors W. Guiye, Z. Yangge, H. Long, L. Huinan, and L. ChongjunBy W. Guiye, L. Chongjun, L. Huinan, Z. Yangge, H. Long
The current application of copper-molybdenum (Cu-Mo) separation inhibitors is often associated with large dosage, high toxicity, environmental pollution problems. In order to solve these problems, a l
Jan 1, 2020
-
Estimating the in-situ mass strength and time to failure of coal pillars in bord-and-pillar workingsBy J. A. Taylor, R. J. Fowell
Abstract: The amount of published literature pertaining to the field of rock mechanics has increased markedly in recent years. Whilst computer applications aid our understanding of the mechanisms of