Cleaner Tail Recycling to Minimize Phosphate LossBy A. K. Fallaw, G. Wang, L. R. Moore, S. Dobson, Y. Xiong, J. Gu
"As ores degrade, mining techniques and chemistries change to meet market demand and maintain product quality. The balance of recovery and grade is a significant challenge in the Crago Process where a
Jan 1, 2016
-
Cleaning and Utilisation Of Coals for Low Emission at Swedish Power PlantsBy K. S. Eric Forssberg, Lennart Ryk
The paper discusses coal utilisation in Sweden. All hard coals have to be imported from other countries. Peat from domestic sources is used as a complement. Environmental legislation and taxation on f
Jan 1, 1995
-
Cleaning Coal and Refuse Fines With the Humphreys Spiral ConcentratorBy Joseph Alexis
Humphreys Engineering Co. has been associated with mining and milling since the turn of the century, but its greatest contribution to the industry was development of the Humphreys spiral concentrator
Jan 8, 1980
-
Cleaning Hartford waterways through underground storageBy Verya Nasria, William Bent, William Hogan
"The South Hartford Conveyance and Storage Tunnel (SHCST) project is a significant component of the Hartford Metropolitan District’s (MDC) long-term control plan (LTCP), which is overseen by the Conne
Jan 1, 2014
-
Cleaning Hydrometallurgical Liquor Using Jameson CellsBy Bob Clayton, David Readett
Jameson Cell technology has found applications in the cleaning of entrained material in copper Solvent Extraction - Electrowin plants. The materials involved are largely organic substances that have n
Jan 1, 1993
-
Cleaning Low-Quality Coal To Increase Mine Productivity And Improve Power Plant PerformanceBy Clark Harrison
It is not uncommon for overall quality of coal from a mine to deteriorate as the mine is developed or for an improved-quality coal specification to be imposed during the life of the mine. Either of th
Jan 1, 1987
-
Cleaning Middlings With Reverse Two-Stage HydrocyclonesBy Thomas A. Mekelburg
Due to a tight ash constraint on the clean coal product and difficult middlings washability characteristics, a considerable amount of coal was being lost in the jig middlings at the Monterey No. 2 Min
Jan 1, 1984
-
Clear Skies Predicted With Surface Mining And Reclamation Act In CaliforniaBy Donald J. Reining
The California Surface Mining and Reclamation Act (SMARA) is the nation's first legislation establishing a statewide mineral resource policy governing mining activities that recognizes regional n
Jan 1, 1984
-
Clear Springs Flotation Operation Of Virginia Carolina Chemical Corporation ? IntroductionBy John A. Brooks
The description of a phosphate flotation operation is repeat information for many people, except for variations in flow sheets. This paper is written to show the variations in flows, and to give enoug
Jan 1, 1962
-
Clearance Improvements for the White Haven and Rockport TunnelsBy J. C. May, G. M. Elliott, J. J. Brady
Increased clearance was required in two railroad tunnels that were built about the time of the Civil War. Clearance infringements, whether they be excavation tights or caused by ice accumulation, redu
Jan 1, 1997
-
Cleuson-Dixence Hydro-Electric ProjectBy F. Chavan
1. Introduction The new Cleuson-Dixence development project in the Valais region of the Swiss Alps, involves the construction of a new link between the Grande-Dixence dam (still world recordholder
Jan 1, 1995
-
Cliffs And Associates Limited Circored® Iron PlantBy E. C. Dowling, S. A. Elmquist, L. A. Kipfstuhl
The Cliffs and Associates Limited (CAL) 500,000 tpy HBI plant located in Trinidad was commissioned after modifications in early 2001. This plant employs the novel Lurgi Circored® process to reduce iro
Jan 1, 2002
-
Cliffs Robe River-The Success Story Of An Australian Iron Ore ProjectBy O. R. Bell
In Australia's remote North West are located the operations of Cliffs Robe River, one of the world's largest iron ore projects. Initial project cost was $US300 million and required the const
Jan 1, 1979
-
Climate Change Adaptation And Mitigation In The Aggregates Industry - SME Annual Meeting 2022By S. E. Restrepo
In recent years, mining operations have experienced the impacts of climate variability, increasing costs, and changes in the socioenvironmental dynamics of the territories. For this reason, the aggreg
Mar 2, 2022
-
Climate Change For Mine Planners: Some FundamentalsBy R. D. Williams
In spite of the increasingly polarized and politicized view of climate science and climate change in the United States, many of the principles behind the ?theory? of Anthropogenic Global Warming (AGW)
Feb 27, 2013
-
Climate Change Risk And Impact Assessment For Global Diversified Mining Group - Introduction - Preprint 09-015By T. Geyer
The Carbon Disclosure Project (the pre-eminent global initiative for institutional investor collaboration on climate change) groups the business risks (and opportunities) related to climate change int
Jan 1, 2009
-
Climate Control on High Production Retreating Longwall Coalfaces in Strata Temperatures Exceeding 42°C at Harworth CollieryBy S. J. Parkin, P. Shead
Extraction of coal at Harworth Colliery is undertaken in the Deep Soft seam at roughly 1000m depth where the strata temperature is 42 "C. Production employs the longwall retreating method using high p
Jan 1, 1997
-
Climate Control Within Large Excavated Vaults For Storage PurposesAt present the feasibility of developing underground facilities for the storage of a number of products including toxic waste, oil, nuclear waste and low pressure gas is under investigation in e numbe
Jan 1, 1993
-
Climax Completing $40 Million Modernization of Henderson Mine and MillBy William G. Doepken
After 15 years of production, 91 Mt (100 million st) of ore mined and nearly 227 kt (500 million lb) of molybdenum produced, Climax Molybdenum Co.'s Henderson Mine and Mill are being modernized a
Jan 1, 1991
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997