Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007
-
Construction of the Combined Sewage Overflow Tunnel for the City of Fall RiverBy Shemek Oginski
The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast
Jan 1, 2005
-
Construction of the Cowles Mountain TunnelBy George K. Mitteer
The Cowles Mountain Tunnel was driven 2,073 m (6,800 ft) with a 3.43 m (11 ft 3 in) shuffle shoe TBM, for the San Diego County Water Authority, through extremely high strength granitic rock in the Cit
Jan 1, 1995
-
Construction of the Detroit River Outfall No. 2By Michael Traylor, Michael Jatczak, Brett Robinson
The Detroit River Outfall No. 2. is an effluent water conveyance system linking the Detroit Metropolitan Wastewater Treatment Plant to the Detroit River. The 6.4m (21ft) finished diameter tunnel exten
Jan 1, 2003
-
Construction Of The East Side Access Manhattan TunnelsBy Don Hickey
The MTA in conjunction with LIRR, are in the process of expanding one of the largest commuter railroads in the country, with over 260,000 passengers a day. The LIRR, which provides 700 passenger train
-
Construction of the East-West Cross Drift Tunnel at the Yucca Mountain SiteBy Brian Fulcher, John Eastlund, J. B. Copeland
Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Pro
Jan 1, 1999
-
Construction of the Inter-Island Tunnel Boston Harbor ProjectBy A. J. Stewart, R. L. Shufflebotham, D. W. Ferguson, T. L. Page
The Inter-Island Tunnel is a 7.7 kilometer (25,160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Bo
Jan 1, 1997
-
Construction of the Lewis Street CSO Tunnel, Nashville, TennesseeBy Patrick J. Doig
The Lewis Street CSO Tunnel is an important element in the efforts of the Metropolitan Government of Nashville and Davidson County (Metro) to improve the treatment of waste-water in the area. The t
Jan 1, 1997
-
Construction of the Longest Road Tunnel in MexicoBy Miguel Angel Banuet Rodriquez, Hector Conceso Aragon
"Construction of the longest road tunnel in Mexico is part of Acapulco’s alternate roadway to the scenic roadway project. This article provides a brief summary regarding details of the construction si
Jan 3, 2018
-
Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case HistoryBy Bob Rautenberg
The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Construction of the NATM Tunnel at San Diego State UniversityBy Justin Brown, Michael Kobler, Dave Ragland, Bob Shufflebotham
PROJECT OVERVIEW As the sun-bronzed San Diego students strolled casually to class, mining crews from Atkinson Construction were working only 9 meters below the surface. The330 meter long, 11.3 met
Jan 1, 2003
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In BostonBy J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long
-
Construction of the NuMI Underground Laboratory FacilitiesBy Christopher Laughton, Michael P. Bruen
At Fermilab, a 4000-ft long underground complex has recently been constructed for a high-energy physics experiment. The complex is sited up to 350 ft, below grade principally in bedrock. The rock exca
Jan 1, 2003
-
Construction Of The Pacheco Pumping Chamber And ShaftsBy Russell Clough
The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re
Jan 1, 1985
-
Construction of the Pergau Hydroelectric Power Project, MalaysiaBy Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007