Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy F. Djahanguiri
The US Bureau of Mines con¬ducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would
Jan 1, 1997
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft GroundBy Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los
Jan 1, 2003
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Design And Construction Of A New Mine - The Design Of Mimosa #2 Mine ? IntroductionBy Ulises Deveze T.
The coal company Minerales Monclova, S.A. (MIMOSA), the owner of the Mimosa R Line, is a subsidiary company of Altos Hornos de Mexico, S.A., the largest steel plant in Mexico with an annual capacity o
Jan 1, 1974
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Design and construction of a surface air cooling and refrigeration installation at a South African mineImpala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum
Jan 1, 2009
-
Design and Construction of a Vehicular Underpass Under a Live HighwayBy Nai-piu Tong, Huaren Dou, Sui-shun Poon, Leslie H. Swann
This paper mainly presents geotechnical aspects of a vehicular underpass that was built across under one of the busiest highway in Hong Kong. The underpass, in a section comprising an upper arch and i
Jan 1, 2003
-
Design And Construction Of Access Shaft And Cross Adit Los Angeles Metro Rail Tunnel Contract A146By Wolfgang H. Roth, Stephen J. Navin, Samuel K. Louis, Anthony F. Stirbys
This paper presents a case history of the design and construction of the access shaft and cross adit utilized to gain access to the Los Angeles Metro Rail tunnel alignment, at the A146 Contract site.
Jan 1, 1989
-
Design And Construction Of BinsBy F. Forbes
For many years, the Machinery Division of Dravo Corporation has been designing and constructing bins and hunkers as part of overall plant facilities. We have designed bins to handle a variety of mater
Jan 1, 1968
-
Design And Construction Of Bulkheads For Underground Backfill SystemsBy A. Afrouz, F. P. Hassani
The types of bulkhead that contain backfill in stopes under various pressures and mining conditions are outlined. Conventionally adopted theoretical and empirical techniques were integrated in the des
Jan 1, 1993
-
Design and Construction of Clay Liners for Gold Tailings Facilities and Heap Leach PadsBy Bruce S. Brown, Jeremy P. Haile
The construction of tailings facilities and heap leach pads for gold mining operations generally requires the installation of one or more impermeable liners beneath the structures to satisfy environme
Jan 1, 1988
-
Design and Construction of Dulles Airport TunnelsBy Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
Design And Construction Of Earth Bottom ThickenersBy Edward S. Hsia
Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl
Jan 1, 1977
-
Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, VermontBy Bradford F. Townsend, Robin B. Dill, Richard M. Croswell
Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co
Jan 1, 1993
-
Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental IssuesBy Adrian Coombs
The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion
Jan 1, 2008
-
Design and Construction of Gold Hill Tailings ImpoundmentsBy Gordon I. McPhail, John D. Nelson
Tailings management represents a major portion of the cost associated with extraction of gold. For each gram of gold extracted, 150 to 200 kg of waste material is produced. Because of environmental co
Jan 1, 1987
-
Design And Construction Of Lake Mead Intake No. 3 Shafts And TunnelBy Jon Hurt
INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021