Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Design of intelligent proximity detection zones to prevent striking and pinning fatalities around continuous mining machines - SME Transactions 2016

    By P. T. Bissert, J. P. Ducarme, J. L. Carr, A. K. Smith

    The continuous mining machine is a key piece of equipment used in underground coal mining operations. Over the past several decades these machines have been involved in a number of mine worker fatalit

    Jan 1, 2016

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • SME
    Design Of Large Span Highway Tunnel Liners

    By D. L. Petersen, C. R. Nelson, P. M. Bergson, B. K. Nelson

    Membrane waterproofing systems in large tunnels cause the partial decoupling of the concrete liner from the rockbolted and shotcreted reinforced rockmass. This decoupling leads to a loose fit of the l

    Jan 1, 1991

  • SME
    Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c

    Jun 13, 2021

  • SME
    Design Of Longwall Development Headings ? Introduction

    By D. S. Choi

    Underground production of coal by longwall methods has increased significantly in the last few years and will very likely continue to: increase. There are several reasons for this. First, as mining mo

    Jan 1, 1975

  • SME
    Design of Lower Northwest Interceptor Tunnels Beneath the Sacramento River

    By Joel Nonnweiler, David Young, John Hawley

    The Sacramento Regional County Sanitation District has implemented a billion-dollar interceptor system master plan, including the 31 km (19 mile) long Lower Northwest Interceptor (LNWI). For the two L

    Jan 1, 2003

  • SME
    Design Of Materials Handling Facilities For A Lakeside Steel Plant ? Introduction

    By Rollin A. Slater

    The bulk materials handling industry has served silently for years as the skeleton structure and often the central system of nerves and nourishment for the body of basic production industries. During

    Jan 1, 1967

  • SME
    Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

    By Verya Nasri, Mehdi Bakhshi

    The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five

    Dec 1, 2022

  • SME
    Design Of Mount Baker Ridge Freeway Tunnel In Seattle

    By E. B. Johnson, G. Kjerbol, L. J. Holloway

    The Mount Baker Ridge Tunnel is a major improvement of Interstate Route 90 in the State of Washington. The total length of planned underground construction is about 3,400 feet (1,040 m) of which 1,332

    Jan 1, 1983

  • SME
    Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In Boston

    By Verya Nasri

    The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr

  • SME
    Design of Noncaving Mine Openings

    By Wilbur I. Duvall

    INTRODUCTION This chapter outlines some general principles and procedures that a rock mechanics engineer can use to arrive at a logical design for the size, shape, and spacings of underground openi

    Jan 1, 1982

  • SME
    Design of optimal flotation circuits - a review

    By S. P. Mehrotra

    In this review article, various approaches and mathematical models that have been used to simulate, design, and synthesize flotation circuits are examined. First, a brief review of flotation kinetics

    Jan 1, 1987

  • SME
    Design Of PCCP Pressure Tunnel Liners

    By Chris C. Sundberg, Ronald E. Heuer, Stanley L. Paul, Peter M. Douglass

    Use of prestressed concrete cylinder pipe (PCCP) for pressure tunnel liners is gaining popularity with contractors, engineers, and owners. This paper presents loading considerations and a beam-spring

    Jan 1, 1987

  • SME
    Design Of Pebble Crushing Circuit

    By Derek J. Barratt

    The existence of a critical size buildup in an autogenous or SAG mill can be predicted from proper examination of drill core and ore samples. Methods of dealing with such critical size in a primary mi

    Jan 1, 1992

  • SME
    Design Of Permanent Block Stopping To Resist Strata Convergence Using Pre-Formed Low Density Polyisocyanurate Foam As A Perimeter Seal

    By Richard E. Ray

    Conventional concrete block plastered with a cemantitious coating is the most common material used in the construction of perma¬nent stoppings to direct airflow in underground mines in the U.S.A. All

    Jan 1, 1984

  • SME
    Design Of Pillars In Shrinkage Stoping ? 1. Introduction

    By R. W. O. Kersten

    The shrinkage method of stoping with pillar support has been used at Agnes Gold Mine since mining commenced. Until recently, rock instability did not have any detrimental effect on safety or productio

    Jan 1, 1982

  • SME
    Design of Plants

    By F. A. Gates, Bengt Samuelson, James E. Edmunds, S. McCune, Neil Hario, Norman L. Weiss, J. M. Bertram, A. M. Cavaliere, F. M. Jr. Stephens, D. D. Chiang

    DESIGN BASIS Size of Project The size of the project generally is expressed in tons of ore milled per day, but company policies differ widely in this respect with a few adhering to this set figu

    Jan 1, 1985

  • SME
    Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

    By Irwan Halim, Seung Han Kim

    This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c

    Dec 1, 2022

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SME
    Design of Proximity Detection Zones to Prevent Striking and Pinning Fatalities around Continuous Mining Machines

    By P. T. Bissert, J. P. Ducarme, J. L. Carr, A. K. Smith

    "The continuous mining machine is a key piece of equipment used in underground coal mining operations. Over the past several decades these machines have been involved in a number of mine worker fatali

    Jan 1, 2016