Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Production Of Lightweight Aggregate From Waste Materials (ee2a87da-befe-4bad-915f-b20cc6432f6f)By M. H. Weinecke, B. P. Faulkner
This paper will discuss the process for making lightweight aggregate, the waste materials that make good lightweight aggregate, the chemistry of making lightweight aggregate and finally a discussion o
Jan 1, 2001
-
South Interceptor Tunnel Construction Using a Lovat EPBMBy Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales
This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja
Jan 1, 2003
-
Ergonomic Interventions At Badger Mining Corporation (30a13109-bb6a-4698-a288-c4dfde51a853)By J. Torma-Krajewski, M. Lehman
In 2005, NIOSH and Badger Mining Corporation entered a partnership to implement ergonomic interventions, including a systematic process, to address exposures to risk factors that may result in musculo
Jan 1, 2007
-
Application Of Ac Induction Motors With Variable Frequency DrivesBy B. J. Sauer
Variable frequency drives (VFD’s), or adjustable frequency controls (AFC’s) as they are more precisely identified, have been available to the mining industry for over 20 years. However, in recent yea
Jan 1, 2002
-
Large-Diameter Tunneling Collapses: Recovery Design and ExecutionBy Bradford F. Townsend
A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed
Jan 1, 2008
-
The Next Step Change In The Size Of Mining ProjectsMany of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r
Feb 27, 2013
-
Upper Rouge Tunnel CSO ControlBy Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour
To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage
Jan 1, 2007
-
The positive pressure chamberBy J. P. Brady
A major spontaneous combustion incident occurred in the sealed goaf of the SL3 Panel; Southland Colliery in 2003 resulting in the loss of a longwall and sealing of the mine. The most important issue f
Jan 1, 2009
-
The Economics of Mechanical Raise BoringBy James H. Dye, N. E. Norman
There will be about 300 raise boring machines used worldwide by late 1981, attesting to the acceptance of this drilling system by the mining and construction industries. Over the past few years, many
Jan 3, 1981
-
Landslides, Drought, And Brown Trout In The Red River, NMBy D. Conklin
Annual fish monitoring of the Red River, NM from the town of Red River to downstream of Questa, NM has been conducted since 1997. This long-term dataset, sponsored by the Chevron Mining Inc. Questa M
Jan 1, 2011
-
L-73 Tunnel, Woodbury, MinnesotaBy Michael B. Gilbert
The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o
Jan 1, 2008
-
Rehabilitation of the 80-Year-Old North Outfall Sewer (NOS) TunnelBy Wolfgang Roth
In 1990, a residential area above the North Outfall Sewer (NOS) tunnel constructed in 1924, experienced subsidence. After sewage was diverted into the North Outfall Replacement Sewer (NORS), soil prob
Jan 1, 2008
-
Slurry Shield Tunneling in Portland—West Side CSO Tunnel ProjectBy James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
Challenges and Opportunity in Modelling and Simulation of Mineral Processing SystemsBy K. V. S. Sastry, K. D. Lofftus
Mathematical modeling and computer simulation are two valuable quantitative tools that are being effectively applied to mineral process- systems. This paper presents an up-to-date assessment of proces
Jan 1, 1989
-
Distribution Of Bacillus Cereus Spores In Soil Over Four Subsurface Gold Deposits; A Progress ReportBy N. L. Parduhn
Populations of Bacillus cereus spores are elevated in soils over four subsurface gold deposits in the western United States. Large deposit-to-background ratios of B. cereus populations were obtained i
Jan 1, 2013
-
Portland, Oregon’s Alternative Contract Approach—A Final SummaryBy Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007
-
Understanding And Solving Roof Control Problems In Stone MinesBy F. S. Kendorski
Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditi
Jan 1, 2002
-
Optimising Collector Performance In The Production Of High Grade PGM Concentrates - Preprint 09-115By J. Wiese
Recently the operating philosophy at concentrators processing platinum bearing ores has started to move from a recovery dominated system to one in which the production of high grade concentrates at th
Jan 1, 2009
-
Rare Earth Elements and selected major elements distribution in the siliceous-clayey silts from the NE Pacific abyssal Basin (Clarion-Clipperton Fracture Zone)By Lukasz Maciag, Ryszard Andrzej Kotlinski, Ryszard Krzysztof Borówka, Dominik Zawadzki
Concentration and composition of rare earth elements (REE) and major elements in the sediment samples from the IOM H11 Fe-Mn nodule deposit, eastern part of the Clarion-Clipperton nodule field (locate
Sep 1, 2014
-
Long-Term Evaluation Of Cab Particulate Filtration And Pressurization PerformanceBy A. B. Cecala
Over the past decade, a substantial effort has been made to improve the air quality inside enclosed cabs of both underground and surface mobile mining equipment to reduce respirable dust exposures to
Jan 1, 2012