Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Coal Mining Environment-Computerized Monitoring Systems

    By Boris M. Vorobjev

    The paper in question discusses a wide range of topics on the coal mining environment in general and on computerized coal mine environment systems in particular. The emphasis is being made on methodol

    Jan 1, 1992

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • SME
    Design Considerations For Structures To Be Built On Subsidence Prone Land

    By R. D. Begley

    This paper will present detailed design drawings of a flexible single floor residential superstructure proposed for both longwall and room and pillar mining conditions. All efforts were made to provid

    Jan 1, 1986

  • SME
    The Hallandsås Dual Mode TBM

    By Werner Burger

    The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at

  • SME
    Leaching Practices At Smoky Valley Mine

    By C. Arthur Lefler

    The hydrometallurgical processes for recovery of gold and silver in use at Round Mountain, Nevada and the practical aspects of the operation are discussed. Included are heap leaching by cyanidation, u

    Jan 1, 1981

  • SME
    Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)

    By Jürg Schlumpf

    Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off

    Jan 1, 2008

  • SME
    San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History

    By Michael Jatczak

    The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin

  • SME
    Concreting the Queens Tunnel, New York City Water Tunnel No.3

    By Edward M. Dowey

    The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring

    Jan 1, 2001

  • SME
    The Thermodynamic Foundation Of The Zero Emission Concept

    By T. Yegulalp, K. S. Lackner

    Zero emission coal plants capture their own CO2 emissions. Since they have no smoke stack, they emit no pollutants to the air. Zero emission plants circulate a gas stream, to which fresh fuel is added

    Jan 1, 2004

  • SME
    Challenges in Modelling Water Flow in Waste Covers: Lysimeter Analysis

    By Ernest K. Yanful, Paul H. Simms

    The lysimeter is a useful tool for evaluating the performance of mine waste covers or liners. A major problem with its application is the possibility for preferential flow into or away from the lysime

    Jan 1, 2000

  • SME
    Response to the Population Balance Model Challenge

    By John A. Herbst

    At the last Comminution Symposium a challenge (Meloy and Williams, 1992) was issued to "predict the typical straight-line, self similar" tumbling mill product size distributions using a population bal

    Jan 1, 1997

  • SME
    Confidence Intervals for Local Estimation: Application to the Witwatersrand Basin

    By Margaret Armstrong, Chris Roth

    One advantage of kriging is that it provides both an estimate of the block or point grade, and an indication of the local precision via the kriging variance. If one assumes that the estimation errors

    Jan 1, 1996

  • SME
    Electrochemical Characterization of a Semiconductor ZnS Concentrate During Oxidative Leaching

    By Wan-Kyu Choi, Arpad E. Torma

    The electrochemical reactions involved in a zinc sulfide flotation concentrate leaching with sulfuric acid in presence and absence of Thiobacillus ferrooxidans, as well as with ferric chloride - hydro

    Jan 1, 1990

  • SME
    Horizontal Geotechnical Investigations for Tunneling

    By Nick Salisbury, Alan Howard, Scott Tunison

    INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to

    Jan 1, 2005

  • SME
    Clay Mineralogy Of The Goathill North Rock Pile, Questa Mine, Taos County, NM: Origins And Indications Of In-Situ Weathering - Preprint 09-098

    By K. Donahue

    Clay minerals play an important role in the gravitational stability of man-made rock piles by affecting geotechnical and hydrological characteristics of the material. The Goathill North rock pile at t

    Jan 1, 2009

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • SME
    US Iron Ore Industry Facing More Worldwide Competition

    The 71st Annual Meeting of the Minnesota Section of SME and the 59th Annual University of Minnesota Mining Symposium were held jointly April 14-16, 1998, in Duluth, MN. Registration was estimated at 4

    Jan 1, 1998

  • SME
    Simulation-Based Analysis of Maintenance Strategies for Mechanized Tunneling Projects

    By Alena Conrads, Markus König, Markus Scheffer, Markus Thewes, Hannah Mattern

    "INTRODUCTION In recent years, the development of tunnel boring machines has revolutionized the tunneling industry. The general structure of a tunnel boring machine (TBM) can be described as a multi-c

    Jan 1, 2016

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • SME
    Advanced Surface Enhancement Technology For Decreasing Wear And Corrosion Of Equipment Used For Mineral Processing

    By Chaoxun Zhao, Daniel Tao, Craig Blue, Narendra B. Dahotre, Rick Honaker, Bhupendra K. Parekh, Hongyang Han

    Equipment wear and corrosion have significant adverse impacts on the operating cost and efficiency of mineral processing plants. In this project advanced surface enhancement technologies are being in

    Jan 1, 2005