Commercial Separation of the Heavy Rare Earths By Ion Exchange - IntroductionBy J. R. Gump
The term "rare earths" is used to designate a group of elements, Numbers 57-71 which are closely related chemically. They were called "earths" because their oxides resemble those of the alkaline earth
Jan 1, 1960
-
Successful Application of EPB Tunneling for the Denny CSO Project, Seattle, WashingtonBy Clay Haynes, Tim Pearia, Robert Robinson, Judy Cochran
A 1.89 km-long, 4.5 m-I.D. tunnel was successfully constructed through saturated hard clay, and highly abrasive dense sand and gravel, with groundwater heads ranging from 10 to 20 m. In order to addre
Jan 1, 2003
-
Industrial Minerals 2004 – SaltBy J. O. Voigt
No major changes took place in the salt industry during 2004. No new uses of salt appeared and only localized supply disruptions occurred. Many salt producers reported slightly increased salt sales
Jan 1, 2005
-
Investigation of Acoustic Emissions and Friction Behavior in a Two-phase Flow with Different Sand Content - Mining, Metallurgy & Exploration (2023)By Sunny Schoone, Maximilian Getz, Felix Leaman, ELISABETH CLAUSEN
Jan 5, 2023
-
Tailings Dam Failure at Omai in GuyanaBy Steven G. Vick
Effects of the August 1995 failure of the Omai tailings dam in Guyana continue to be felt throughout the mining industry. This article is taken from the final report of the independent body of expert
Jan 1, 1996
-
Rod and Ball Mills (d7a19c4a-b72b-4e31-abb4-bdb037d4fa45)By Chester A. Rowland, David M. Kjos
INTRODUCTION Mineral ore comminution is generally a feed preparation step for subsequent processing stages. Grinding, the fine product phase of comminution, requires a large capital investment and
Jan 1, 1998
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
Copper Precipitation And Cyanide Recovery Pilot Testing For The Newmont Yanacocha ProjectBy S. Acar, M. Botz
Introduction In 2007, Newmont Mining Corporation will begin construction of a milling and cyanidation leaching circuit for the Yanacocha site in Peru. Ore to be processed in the circuit contains a r
Jan 1, 2007
-
Cresson Mine: Case History of a Rapidly Evolving Mining ProjectBy Jeffrey A. Pontius
The Cresson gold deposit is in the southcentral portion of the Cripple Creek mining district in central Colorado (Fig. 1). The deposit is hosted by a series of 32 Ma (Kelley, 1995) felsic to mafic, a
Jan 1, 1996
-
TREATING HEAVY METALS IN MINE AND Mill WASTE USING ENVIROBOND™By Ali Sogue, Steven Schurman, R. Jensen
This paper presents the results of the remediation of the Gregory Gulch #1 Superfund site, an EPA Clear Creek Superfund project located in central Colorado. The Gregory Gulch #1 site was an historic g
Jan 1, 1999
-
Innovat Pilot Plant TrialsBy Dan Mackie
Commissioning of a 150 tpd continuous vat leaching pilot plant at Ariel Resource's San Martin Mine began in October, 1995. Functioning of the systems proved to be as designed. Initial trials, however
Jan 1, 1996
-
Comparison of Performance of Soil Mixwall and Conventional Bracing System for Station Excavations in AlluviumBy Timothy P. Smirnoff, Anthony Stirbys, Amanda Elioff
The construction of the continuing expansion of the Los Angeles Metro System has required the construction of eight new station structures. One contractor proposed, as a construction alternative for
Jan 1, 1997
-
Geotechnical Investigation, Design And Construction Of The Km 80/86 Tunnels, Tumbler Ridge Branchline, B.C.By R. D. Hendry, R. A. Pearce, Allyn J. Steward, Dennis C. Martin
This paper outlines the geotechnical exploration and design approach utilized for the Km 80 and Km 86 Tunnels on the British Columbia Railway Tumbler Ridge Branchline. Information from surface mapping
Jan 1, 1985
-
A Biosorption Approach to Removal of Trace Concentrations of Uranium and Heavy Metals from Aqueous SolutionsBy E. B. McNew, J. M. Barnes, A. E. Torma
The applicability of biosorbent materials for the removal of uranium and other heavy metals from synthetic and actual uranium mil 1 tailing (UMT) solutions has been investigated. The biosorbent materi
Jan 1, 1992
-
Evaluation of liberation characteristics of coal organic componentsBy H. Cho, P. T. Luckie
A study was undertaken to investigate the liberation behavior of coal macerals through size reduction and density separation. It was seen that the liberation of coal macerals could be achieved by size
Jan 1, 1999
-
Partnering For Successful Ergonomics: A Study of Musculoskeletal Disorders In MiningBy P. James, L. J. Steiner, F. Turin
NIOSH researchers and an industry partner conducted an investigation to study the effectiveness of ergonomic interventions in mining. The study required a significant commitment of time and resources
Jan 1, 2003
-
Infrastructure Upgrade Through Innovative Tunnel RehabilitationBy Charles A. Maliszewski, James M. Galvin, Gerhard Urschitz
With obvious signs of deterioration, the double track, historically registered Bergen Tunnels as part of the commuter rail system in New Jersey waited for rehabilitation for a long time. Serious water
Jan 1, 2003
-
Ups and Downs of DownsizingBy George Weinman
GEORGE WEINMAN: Our first group leader for the discussion, "Ups and Downs of Downsizing," wishes to remain anonymous. ANONYMOUS PRESENTER: When George and Jamie asked me to do this, I thought a wh
Jan 1, 1998
-
Applied drilling and blasting techniquesfor blast casting at Trapper mine – Potential to save on overburden removalBy Paul D. Dupree
Introduction Trapper mine is a dip-line strip coal mine, located about 10 km (6 miles) southwest of Craig, CO. The mine provides the Craig Generating Station, operated by Colorado-Ute, with about
Jan 1, 1987
-
Bubble diameter estimation in a mechanically agitated flotation machineBy J. A. Finch
The photographic measurement of bubble diameter is tedious and restricted to vessels with transparent walls and relatively low bubble concentrations. A new method for predicting bubble diameter in a f
Jan 1, 1987