Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application Of Three-Dimensional Stress Analysis To Optimizing Pillar Stability And Mining LayoutBy R. D. Hammett
This paper describes an investigation that MS carried out using the three-dimensional, stress analysis computer program "NFOLD" to assess pillar stability in relation to existing mining conditions and
Jan 1, 1983
-
Influence Of Blasting On Open Pit EconomicsBy R. K. Singhal
In open pit mining every effort is made to maintain as steep a pit slope as possible. Pi t slope angles are influenced by numerous factors some natural that are amenable to limited or no control at al
Jan 1, 1988
-
Geological Procedure And Control At Steep Rock Iron Mines Limited ? IntroductionBy C. J. Gauvin
The Geological Department, headed by the Chief Geologist, is part of the General Engineering Division and is under the direct supervision of the Chief Engineer. The Geological Department is respons
Jan 1, 1960
-
The Acceleration Of Trackless Underground Ore MiningBy R. S. Shepard
The closing remarks of a paper which I presented at the annual AIME meeting at Dallas, Texas during February of 1963; contained a forecast of increased activity in trackless underground ore mining whi
Jan 1, 1967
-
Coal Cleaning - Effect Of Stage Flotation On Ignition And Combustion ProcessesBy Brij M. Moudgil
Flotation of fine and coarse coal after multistage addition of the frother was found to yield coal fractions with significantly lower ash content as compared to the feed. It was observed that the lowe
Jan 1, 1984
-
Ground Water Monitoring Of Underground Coal MinesBy B. A. Waite
The new OSH regulations concerning ground ward monitoring of underground coal mines has been the source of many concerns for the mining industry. Because the regulations were initially written at the
Jan 1, 1980
-
AI Techniques To Improve Management Information For Monitoring SystemsBy R. H. King
Mine managers need better information to locate new opportunities and then to assess the effect of their decisions. We are developing the Intelligent Decision Support System (IDSS) and its two major m
Jan 1, 1989
-
Indicator Conditioned Estimator (25d65824-d33d-4da1-8117-5abe26a82e3f)By H. Zhu
Qualitative and interpretative information as obtained from geological and/or geophysical studies, in addition to precise measurement, is incorporated into the estimation process through an indicator
Jan 1, 1989
-
Manufacture Of Reconstituted Talc Crayons For Marking Steel For Fabrication ? IntroductionBy J. T. Tanner
The research activities of the Minerals Research Laboratory, which is a part of North Carolina State University, is normally confined to solving beneficiation problems, and developing flotation proces
Jan 1, 1986
-
Computer-Aided Analysis Of Mine Drainage SystemsBy Christopher J. Bise
Traditionally, mine drainage systems have not received the high level of emphasis on careful engineering design which has been rendered to many of the other auxillary operations. This may be due, in p
Jan 1, 1983
-
Open Pit Mining At CarlinBy Gerald C. Smith
Carlin Gold Mining Company is a wholly owned subsidiary of Newmont Mining Corporation and is located 76 kilometers north west of Elko, Nevada. Multiple bench open pit mining methods are being used to
Jan 1, 1985
-
The Effect Of Pyrite-Pyrrhotite Contact On Their FloatabilitiesBy H. Nakazawa
Galvanic contact, occurring between electricall y conducting minerals in flotation pulps, may affect the nature of mineral surfaces and influence their floatabilities. Rest potential and galvanic curr
Jan 1, 1985
-
The State Battery At Marvel LochBy R. Addison
Boom, boom, boom, boom. The staccato beat rings out across the bush; the stamps are at work - slowly pulverizing gold-bearing ore for a patient, grizzled prospector. This is the State Battery near Mar
Jan 1, 1986
-
Optimization of surface mining dig limits with a practical heuristic algorithmBy Y. V. Vasylchuk
An algorithm is presented for optimizing the classification of surface mine material subject to excavating constraints. High-resolution, expected-profit models are optimized to classification maps sub
-
Atlanta North-South TunnelBy Samer Sadek
The Georgia Department of Transportation (GDOT) undertook an exploratory feasibility study to one of the most ambitious tunneling projects in the United States. HNTB Corporation was retained to perfor
-
Quarried Stone Meets The Challenge Of Contemporary ArchitectureBy Arland R. Krueger
You have asked me today to tell you how quarried stone is meeting the challenges of contemporary architecture. The new position of stone, the oldest building material, in contemporary architecture, w
Jan 1, 1960
-
Simulators Improve Mine Operator Training and SafetySimulator technology has advanced to the point where the cost of mining equipment simulators is beginning to make commercial sense. Simulator-based evaluation allows operators or potential employees t
Jan 1, 2003
-
A Practical Approach For Precast Concrete Segmental Ring SelectionBy Steve Skelhorn
Over the recent years, major advances have been made in design of precast concrete segmental tunnel liner. Starting from basic, parallel sided rings, we now have state of the art, universal rings inco
-
Safe Continuous Precipitation And Disposal Of Arsenic And Other Toxic Elements From Biological Processing Of Refractory Gold OresBy Satid Therdkiattikul, Donald A. Dahlstrom
By oxidizing the pyrite matrix through biological leaching of precious metals ores or concentrates, better than 90% recovery of gold and silver is achieved. The paper develops three precipitation proc
Jan 1, 1995
-
Operation of large underground fans at Kidd Mine ? progressing through the challengesKidd Mine in Northern Ontario is now producing from Stage 1 of the Mine D expansion project ? mining between 2100 m and 2700 m below surface. Planning for Stage 2 of the Mine D project is already well
Jan 1, 2009