The Implementation Of Caro's Acid As A Cyanide Tailings Treatment Method At Lone Tree MineBy J. A. Cole
This paper discusses the modification of the cyanide tailings treatment method from ferrous sulfate to Caro's acid (peroxymonosulfuric acid). An examination of the operating parameters, costs, an
Jan 1, 1996
-
New separation technology for lead and mercury from acid sludge of copper smelting using a total hydrometallurgical process - Mining, Metallurgy & Exploration (2024)By Lida Sun, Na Wu, Mengyang Huang, Xingxiang Fan, Yan Jiang, Shasha He, Kunbin Yang, Yang Cao
The separation of lead (Pb) and mercury (Hg) from copper (Cu) smelting acid sludge using the carbonization and acidleaching total hydrometallurgical process was investigated. The effects of the excess
May 30, 2024
-
Material Preparation & Agglomeration At The Buckhorn MineBy A. A. Schweizer
Buckhorn ore is hydrous, argillized basaltic andesite, and is at least 60% clay composed of kaolinite and subordinate montmorillonite. Moisture content runs from 10% to 25%. The original crushing plan
Jan 1, 1987
-
TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara
This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv
Jun 23, 2024
-
Roof Bolter --New Source Of Low-Cost Roof Strata InformationBy E. M. Frizzell
An ongoing research program at the Spokane Research Center of the U.S. Bureau of Mines is directed toward investigating drilling parameters (thrust, torque, penetration rate, and drill revolutions) du
Jan 1, 1990
-
New Drives And Drive Systems For High-Performance Face ConveyorsBy U. Paschedag
Today's modern longwalls have to produce high outputs with maximum availability and running time with the additional requirement of ever increasing panel width and length high-performance face co
Jan 1, 1995
-
Case Study - Benefits Of Building An Efficient Mine Planning ProcessBy Jr. Wilkinson
Mine planners are under pressure to evaluate the impact of changing economic times and newly acquired data on the mine plan. Incorporating change, such as commodity prices, customer sales, changing c
Jan 1, 2010
-
Mineworkers’ perceptions of mobile proximity detection systems (ME)By Michael McNinch, LaTasha R. Swanson, Jennica L. Bellanca, Justin Helton
As manufacturers and mine operators develop and implement proximity detection systems (PDSs), they need to be mindful of the systems’ compatibility with mineworkers’ tasks, and possible unintended con
-
Magnetic Coalescence Of Hematite And MagnetiteBy Q. Xu
The new process consists of the selective coalescence of fine hematite particles by fine magnetite. The gangue minerals are dispersed by some dispersant; thus it can be separated by desliming. This pr
Jan 1, 1989
-
Column Flotation Of Montana Chromite OreBy J. D. McKay
The Bureau of Mines devised a column flotation technique using either fine or coarse bubbles and compared it with conventional flotation on a Montana chromite ore. On deslimed ore, fine-bubble column
Jan 1, 1985
-
Dust Sources And Controls On High Tonnage Longwall FacesBy R. A. Jankowski
The U.S. Bureau of Mines has conducted a study to identify the sources of respirable dust and appropriate dust controls applicable to today's high tonnage longwall faces. The primary source of re
Jan 1, 1990
-
Lu Decomposition Conditional Simulations For Exploration Strategy Evaluations (a8c58db0-01c7-4ab8-ab72-84a8bbca10b0)By B. M. Davis
Characterizing exploration prospect potential has aspects that differ from those encountered during ore reserve estimation. One problem is determination of the ore reserve potential prior to acquisiti
Jan 1, 1990
-
Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)By D. Kump
The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.
Jan 1, 1999
-
Control System For Long Distance Slurry PipelinesBy Jay P. Chapman
The basic control requirement for multi-pump, long distance slurry pipelines are discussed and a particular example of an operating slurry pipeline using programmable controllers is presented.
Jan 1, 1983
-
Planning For Coal Gasification - Supplement to Tables VII and VIII providing additional dataBy Ralbern H. Murray
Typical First Year Selling Price Strip Mined Western Sub-Bituminous Coal Based [Fixed Capital (1) $600 MM Construction Loan Interest $100 Working Capital $ 30 Start-up Costs $ 30 Total Capit
Jan 1, 1975
-
Slope Stabilization At ?El Cerrejon? Coal Mine, Columbia, South AmericaBy M. Jaramillo
The Expanded West Pit of the 15 MTY El Cerrejon Mine will reach a maximum depth of270 m. Slope stability evaluations indicated that this depth, combined with structural complexities, would create a se
Jan 1, 1995
-
Froth flotation's newest machines: How much better are they?By Peter Amelunxen, Brandon Akerstrom
Since its introduction 40 years ago, the compartmental model of flotation has been used to predict the performance of mechanical flotation cells. However, it has found limited success for modeling dua
Mar 1, 2025
-
An Innovative Coal Mining System Utilizing High-Pressure Water Jet TechnologyBy F. D. Wang
This paper presents an innovative mining method with the application of the water jet. The basic principle of this mining method is to mine a thin panel slice with a water jet system and to allow the
Jan 1, 1991
-
A Simulation-Optimization Model For Exploration And Exploitation Of Exhaustible Mineral ResourcesBy David L. Martin
This paper discusses the development of a SLAM II* simulation model with imbedded optimization modules designed M evaluate mineral exploration and exploitation strategies. The model traces through a s
Jan 1, 1983
-
Organizing The Project Management TeamBy V. E. Cole
For the successful execution of a major project, the project team must be thoughtfully organized, manned, instructed and motivated. This is true of both the engineer/constructor team and the mining co
Jan 1, 1980