Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Synergistic Extraction and Separation of Cobalt and Lithium Using D2EHPA and CYANEX 272

    By Mehdi Noori, Atefeh Azizitorghabeh, Fereshteh Rashchi, Ataollah Babakhani, Sarah Mahmoudi

    The focus of this research was to evaluate the synergistic effect of bis(2,4,4-trimethylpentyl) phosphinic acid (CYANEX 272) and di-(2-ethylhexyl) phosphoric acid (D2EHPA), diluted in kerosene, on the

    Jan 17, 2022

  • SME
    Long-Term Stability for Two-Seam Mining at OCI's Big Island Mine

    By J. F. T. Agapito

    Two flat-lying trona seams 3-to 3.5-m thick, approximately 10 m apart, and at depths of 250 m are mined by room-and-pillar at OCI's Big Island Mine in Wyoming. Continuous miners and a yielding pi

    Jan 1, 1999

  • SME
    What it’s worth : A review of mineral royalty information (cdb31e8a-0d35-470b-98b2-e49232f0c791)

    By H. Lyn Bourne

    This is the seventh annual tabulation of royalty information. It is also the first year in which some data have been deleted to make room for new data. The concept of royalties evolved from a time

    Jan 1, 1989

  • SME
    Using Image Analysis to Measure Phosphate Process-Stream Composition

    By R. D. Grove

    The control of Florida phosphate flotation plants is largely based on the visual observations of experienced operators, both in recognizing good and bad froth conditions and in making judgments about

    Jan 1, 1993

  • SME
    Enhanced Fire Escape Training For Mine Workers Using Virtual Reality Simulation - Preprint 09-126

    Recent U.S. mine disasters identified a need for improved training of miners in escape from mine fires and explosions. Researchers at the National Institute for Occupational Safety and Health?s (NIOS

    Jan 1, 2009

  • SME
    Casualty And Property Concerns For Tunneling Contractors

    By C. N. Greene

    I am sure it is obvious to all of you that a complete program of casualty and property insurance is as necessary for any tunneling contractor as it is for anyone else involved in trade in the United S

    Jan 1, 1983

  • SME
    Wage Disparities In NAFTA Nations

    By Jennifer B. Leinart

    With the signing of the North American Free Trade Agreement (NAFTA), Canada, the United States and Mexico entered into an international experiment in economics amid a cloud of controversy that still

    Jan 1, 1998

  • SME
    Preconcentration Of Native Copper And Porphyry Copper Ores By Electronic Sorting (231d72a2-c65d-4281-916f-f34dbee1fbd5)

    By Vern Miller

    The Bureau of Mines developed a detector for controlling sorting devices to separate the copper-bearing fragments from the barren portion of Michigan native copper and western porphyry copper ores. A

    Jan 1, 1976

  • SME
    1.2 Planning for Mining Information Systems - Introduction

    An information system (I/S) plan is a means for establishing and communicating the direction the organization intends to take to provide the information required for achievement of organizational goal

    Jan 1, 1979

  • SME
    Additional Test Results for Comparison of Penetration of Grout Made with Various Ultrafine Cement Products

    By Shimi Tzobery, Jay Davenport, Raymond Henn, Sam Bandimere

    Over the past several decades, the use of cement-based grouts using ultra fine cement as a replacement for portland cement has begun to gain acceptance as an alternative to chemical solution grouts us

    Jan 1, 2005

  • SME
    Heap Leaching of Fine Agglomerated Tailings at Asamera’s Gooseberry Mine

    By Jeff W. Butwell

    Mill flotation tailings impounded at the Gooseberry Mine site between 1976 and 1984 were determined to be an economic source of gold and silver. The tailings would be recoverable by standard heap leac

    Jan 1, 1990

  • SME
    Gold Heap Leach Simulation And Optimization Using A Multiphysics Model

    By S. Garcia

    The Minera Yanacocha operation presents various operating challenges, due to the complex structure of several heaps interconnected with ponds and gold recovery plants. A comprehensive process model ha

    Jan 1, 2010

  • SME
    East Side Access - Segmental Lining Design Challenges for Closely Spaced and Shallow Tunnels

    By D. I. Smith

    Constructing tunnels in congested urban areas requires tunnels to be placed closer together and with less cover than was previously necessary. Contract CQ031 of New York?s East Side Access project wil

    Jan 1, 2008

  • SME
    Heat and Moisture Transfer within Advancing Longwall Coalface Goafs and the Effect on Face Climatic Conditions

    By I. Longson

    As a longwall coalface advances a caved goaf or waste region is left behind. Air flow takes place through this permeable goaf due to the pressure differentials existing across it and en route this lea

    Jan 1, 1989

  • SME
    Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section

    By D. J. Gilbert

    As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co

    Jan 1, 2011

  • SME
    New Approach Of ASFINAG For Tunnel Construction Monitoring Of The Tauern Tunnel Project In Austria

    By Robert Schnab

    ASFINAG is responsible for the construction and operation of the Austrian highway system. It is approx. 2,400 km of highways and 65 tunnels with a total length of 200 km including the Tauern Tunnel.

  • SME
    Environmental Auditing As An Effective Management Tool For The Mining Industry

    By J. P. Bunch

    As the number of environmental laws continues to steadily increase and the economic penalties for contamination problems become more severe, environmental management represents an important management

    Jan 1, 1990

  • SME
    Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74

    By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy

    This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660

    Feb 24, 1997

  • SME
    The Time Aspect Of The Optimum Long-Term Open Pit Production Sequencing

    By Rossen Halatchev

    The production sequence optimization of open pit mine is a procedure that reflects the exploitation conditions over life of mine. These conditions are determined by the geological characteristics of t

    Jan 1, 2002

  • SME
    Introduction To Minnesota's Copper-Nickel Study With A Resource Overview

    By Peter Kreisman

    This paper and four other papers on the MEQB Regional Copper-Nickel Study, presented today at the 1980 SME-AIME Fall Meeting are based on four years of extensive inter-disciplinary research and impact

    Jan 1, 1980