Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Two-phase optimization methodology for the design of mineral flotation plants, including multispecies and bank or cell models - Mining, Metallurgy & Exploration (2018)By E. D. Gálvez, L. A. Cisternas, R. Acosta-Flores, F. A. Lucay
Froth flotation processes are carried out in flotation cells that are grouped into banks, and these banks are interconnected, forming a flotation circuit. A literature review shows the existence of pa
-
A Goal Programming Model For Determining The Optimal Production Schedule Considering Penalties Or Bonuses Dependent On Quality ? IntroductionBy Ralph W. Barbaro
In many parts of the country, electric utilities use spot market coal to make up the difference between the amount of contract coal and the total amount burned. The utilities involved will normally ha
Jan 1, 1983
-
Adapting to Project Needs: Frozen Cross Passages and Adits - RETC2023By Kyle Amoroso, Larry Applegate, Aaron K. McCain
The use of frozen soil as ground improvement and temporary ground support for the excavation and construction of cross passages and adits has gained in popularity over the last decade. Frozen soil pro
Jun 13, 2023
-
Process Development For The Sagasca, Chile, Oxidized Copper Ore Deposit - HistoryBy Earl L. Rau
Although the Sagasca deposit has been known for 76 years, the property was never put into successful operation because of various adverse factors including low market price for copper, legal entanglem
Jan 1, 1970
-
Mine To Model Reconciliation At The Rosebud Mine (7a9ebe79-acaf-4c8e-98a2-975e3f03ffd5)By M. J. Blattman
The problem of measuring the amount of rock removed during a given time interval is faced by most milling operations. Many methods have been developed with varying degrees of success, dependent upon t
Jan 1, 1999
-
Coal Wettability And Its Correlation With FloatabilityThe surface properties of eight coal samples were studied by measuring contact angles, coal oxidation, equilibrium moisture and film flotation. The penetration tests were carried out with do de cane,
Jan 1, 1992
-
A machine learning modelling outline for short-term seismic hazard assessment - RASIM 2022By Patrick Linzer, Lindsay Linzer
By its nature, seismology has been a data intensive field since the first digital computers were introduced in the 1950s. The first empirical models were developed in the same period and are still wid
Apr 26, 2022
-
Evaluation of Different Neutralization Reagents in the Selective Removal of Impurities in Rare Earth Sulfuric Liquor Mining, Metallurgy and ExplorationBy Éder Domingos Oliveira, Carlos Antonio Morais, Ruberlan Gomes Silva
The objective of this study is to assess the impact of different reagents, such as limestone, lime, magnesium oxide, and sodium hydroxide, in experiments carried out in the single purification step an
-
Hutchinson Mine - A Problem In Coal Mine-DrainageBy Ernst P. Hall
The Irwin Basin. (Fig. 1)* is a synclinal or shoe-horn *Figure numbers throughout refer to color slides not included with the preprint shaped basin in the Pittsburgh Coal Seam, It is approximately 10
Jan 1, 1959
-
Western Coal Use In Industrial BoilersBy Kenneth L. Maloney
Ten small and intermediate-sized [11 GJ/hr to 264 GJ/hr (10,000 lb/hr steam to 250,000 lb/hr steam)] coal-fired boilers in the upper Midwest have each been tested on both a bituminous eastern coal and
Jan 1, 1977
-
Nickel Exploration by neutron Capture Gama RaysBy F. E. Senftle
Preliminary geophysical surveys for nickel deposits are usually carried out by airborne magnetometer and surface electrical methods. Once an anomaly is discovered by these techniques, one must resort
Jan 1, 1971
-
Technical Note - Dynamic input-output model as applied to the investment planning of a coal power enterpriseBy J. R. Sturgul
A dynamic input-output model for a coal power enterprise that now includes four underground coal mines, three coal washing plants, a power plant and a railway transportation system was developed. The
Jan 1, 1999
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Geochemistry of Critical Minerals in Mine Wastes at Hillsboro and Steeple Rock Districts, New Mexico - SME Annual Meeting 2024By Virginia T. McLemore, Abena S. Acheampong-Mensah
Critical mineral endowment of mine wastes in two mining districts in New Mexico (Copper Flat at Hillsboro and Carlisle-Center mines in the Steeple Rock district) will be characterized and estimated. “
Feb 1, 2024
-
An Update On In-Pit Crushing-Conveying-Stacking Systems In Surface Metal MinesBy S. A. Jeric
In-pit crushing and conveying of waste has been utilized in the mining industry for over 30 years. In recent years, innovations in crushing, conveying, and particularly waste and leach stacking techno
Jan 1, 1997
-
Process Simulation to Enhance Complex Flowsheet Development: Examples in BiotechnologyBy D. Morin, J. Villeneuve, S. Foucher
The development of new processes has to follow "best practice" rules in order to be technically and economically as efficient as possible. However, innovations, new process routes and new rules are co
Jan 1, 2000
-
Relationship Between Observed Mineral Liberations In Screened Fractions And In Composite Samples (0980c1d0-ad73-4e27-a6fa-aea9c6bf6389)By W. Petruk
An investigation was conducted to determine the minimum number of samples that must be studied by image analysis of polished sections in order to characterize a mill product and to determine the appar
Jan 1, 1985
-
Meeting The U.S. Minerals And Metal Needs For Energy Production?Energy-related systems: wind, solar, electric are typically materials intensive. As new technologies are widely deployed, significant quantities of the elements required to manufacture them will be
Jan 1, 2012
-
The Fourth Tube of the Elbe-Tunnel—Built by the World’s Largest Soft Ground Tunnelling MachineBy Claus Becker
The new, 2.600 m long pipe under the river Elbe in Hamburg/Germany required for 2 traffic lanes, emergency lane and space for utilities a boring diameter of 14,20 m(46,6 ft). According the geology (gl
Jan 1, 2001
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal AreaBy Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987