Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Variations In Dust Levels With Continuous Miner Position

    Little knowledge is available that considers the effects of continuous miner position on the possible respirable dust exposure of the remote mining machine operator. Such information could be very use

    Jan 1, 1998

  • SME
    Examination of water spray airborne coal dust capture with three wetting agents - SME Transactions 2013

    By J. A. Organiscak

    Water spray applications are one of the principal means of controlling airborne respirable dust in coal mines. Since many coals are hydrophobic and not easily wetted by water, wetting agents can be ad

    Jan 1, 2013

  • SME
    Constraints and Consequences in 3-Dimensional CFD Modeling of Open-Pit Mines

    By K. V. Raj, T. Bhowmick

    "Computational fluid dynamics (CFD) modeling of an open-pit mine has several challenges. A good quality mesh of the model domain is a pre-requisite for convergence in solution. Good quality tetrahedra

    Jan 1, 2015

  • SME
    The Industrial Uses Of Anthracite

    By Charles G. Zink

    Anthracite is widely known as a domestic or space heating fuel. The prevailing market ratio of domestic to industrial consumption was about 80 to 20 up until 1950. Since then it has been shifting unti

    Jan 1, 1966

  • SME
    Mineralogical Characterization and Preliminary Beneficiation of the Zoro Lithium Project, Manitoba, Canada "Mining, Metallurgy & Exploration (2021)"

    By Toby Mayo, Tassos Grammatikopoulos, Massoud Aghamirian, MARK FEDIKOW

    The Zoro pegmatite project in east-central Manitoba occurs 20 km east of the historic mining town of Snow Lake. A composite sample (Master Comp) was prepared fromthree pegmatite zones within Zoro Dyke

    Sep 16, 2020

  • SME
    Series Fan Installation at Island Creek Coal Company

    By Richard Jr. Ray, David Johnston, Phil Blankenship

    Injection of inert gases to combat mine fires has been practiced in various parts of the world for a long time. Of late, nitrogen has become the preferred inert gas for control of mine fires and safe

    Jan 1, 1989

  • SME
    Amax's Sleeper mine exceeds expectations on all counts as low-cost gold producer

    By Warren D. Stanford Stanford

    Introduction The Sleeper mine is a near-surface gold mine located in a remote area 56 km (35 air miles) northwest of Winnemucca, NV (Fig. 1). The deposit was discovered in 1984 by an Amax exploration

    Jan 4, 1987

  • SME
    Innovative Rehabilitation of Existing Tunnels under Minimum Impact on Operation

    By A. G. Nitschke, I. Ossenbühl, W. Dolsak, J. Dase

    "The authors have successfully developed an innovative rehabilitation concept, which meets actual technical standards and minimizes the impact on the operation of a key conveyor tunnel. A flexible and

    Jan 1, 2015

  • SME
    The Effects of Clothing Insulation and Acclimation on the Thermal Comfort of Underground Mine Workers "Mining, Metallurgy & Exploration (2020)"

    By Taghi Sharizadeh, MAURICE SUNKPAL, ELAHEH TALEBI, PEDRAM ROGHANCHI

    Excessive heat exposure is among the health and safety hazards that have adverse effects on the mine workers. The very nature of the underground climate makes it a convenient avenue for heat generatio

    Jun 29, 2020

  • SME
    Testing of Ground Truth Instruments for Use in Evaluating Haul Truck Collision Warning and Avoidance Systems - SME Annual Meeting 2024

    By C. R. DeGennaro, Yongjun Zhang, J. Bickson, J. L. Carr, Chenming Zhou, J. R. Srednicki, B. Lambie, M. Girman, J. A. Galanko

    Between 2005 and 2021, surface mining haul trucks were involved in 54 fatal incidents in the United States [1]. Collision warning and avoidance systems (CXS) can help haul truck operators navigate the

    Feb 1, 2024

  • SME
    Air-Cooling and Refrigeration Equipment

    By Austin Whillier

    INTRODUCTION Use of air-cooling or refrigeration equipment in underground mines is needed when conventional ventila¬tion techniques do not maintain acceptable environ¬mental temperatures in working

    Jan 1, 1982

  • SME
    Shaft Sinking And Ramp Excavation, Which Method For What Conditions

    By D. R. McMullin

    The purpose of this paper is to provide a method for mine planners and engineers to evaluate on a conceptual basis if a shaft or a ramp is most suited for their particular underground access requireme

    Jan 1, 1994

  • SME
    Evaluation of a novel fire-blocking gel to prevent and suppress mine fires - SME Transactions 2011

    By D. Lauriski, E. D. Thimons, A. C. Smith, D. C. Fredley

    The National Institute for Occupational Safety and Health (NIOSH) and Northwest Barricade LLC (NWB) conducted a study to evaluate the effectiveness of a novel fire blocking gel for use in underground

    Jan 1, 2011

  • SME
    Double thickener circuit at Gold Fields' Chimney Creek

    By J. O. Marsden, J. H. Gourdie, J. R. Arnold, J. G. Mansanti

    During the testing and design of the Gold Fields' Chimney Creek mine, it was found that a much higher carbon loading was possible with CIC (carbon-in-solution columns) than with CIP (carbon-in-pu

    Jan 1, 1990

  • SME
    Magneto-Gravimetric Separation Of Nonmagnetic Solids

    By S. E. Knalafalla

    The availability of a fluid whose gross behavior sharply changes in a magnetic field without affecting its rheologic characteristics has been recently demonstrated. A colloidal solution of a ferrimagn

    Jan 1, 1972

  • SME
    Conveyor Pulley Specifications for Mining

    By Rick Sarkisian, Greg Girardey, David Keech

    The Conveyor Equipment Manufacturers Association (CEMA) specification B105.1 "Welded Steel Conveyor Pulleys" adequately defines pulley assembly standards for light material handling applications. Howe

    Jan 1, 1998

  • SME
    Nonlinear Adaptive Control Of Mineral Processes

    By P. Massacci

    The modelling of phenomena by nonlinear dynamic Systems Theory representations require the specification and identification of suitable models of the phenomenon and the availability of good optimizati

    Jan 1, 1991

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • SME
    Crushing and grinding at Amax's Sleeper gold mine

    By J. J. DeMull, B. A. Boster

    Amax's Sleeper mine uses conventional cyanidation milling and heap leaching techniques to produce gold. Since milling operations commenced in March 1986, average ore processing rates have improve

    Jan 1, 1990

  • SME
    Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024

    By Christian Heinz, Doug Harding

    TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa

    Jun 23, 2024