Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Series Fan Installation at Island Creek Coal Company

    By Richard Jr. Ray, David Johnston, Phil Blankenship

    Injection of inert gases to combat mine fires has been practiced in various parts of the world for a long time. Of late, nitrogen has become the preferred inert gas for control of mine fires and safe

    Jan 1, 1989

  • SME
    Evaluation of a novel fire-blocking gel to prevent and suppress mine fires - SME Transactions 2011

    By D. Lauriski, E. D. Thimons, A. C. Smith, D. C. Fredley

    The National Institute for Occupational Safety and Health (NIOSH) and Northwest Barricade LLC (NWB) conducted a study to evaluate the effectiveness of a novel fire blocking gel for use in underground

    Jan 1, 2011

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • SME
    Constraints and Consequences in 3-Dimensional CFD Modeling of Open-Pit Mines

    By K. V. Raj, T. Bhowmick

    "Computational fluid dynamics (CFD) modeling of an open-pit mine has several challenges. A good quality mesh of the model domain is a pre-requisite for convergence in solution. Good quality tetrahedra

    Jan 1, 2015

  • SME
    Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024

    By Rob Herr, Irwan Halim, Heather Marsh

    This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap

    Jun 23, 2024

  • SME
    A Modified Version Of The Geomechanics Classification For Entry Design In Underground Coal Mines

    By David A. Newman

    The Geomechanics Classification (Bieniawski, 1979) was modified for entry and roof support design in underground room-and-pillar coal mines. Adjustment multipliers were introduced to incorporate the i

    Jan 1, 1985

  • SME
    Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024

    By Christian Heinz, Doug Harding

    TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa

    Jun 23, 2024

  • SME
    Temperature-dependent Langmuir model in the coal and methane sorption process: Statistical relationship - SME Transactions 2016

    By X. Tang, N. Ripepi

    The Langmuir model has been widely used for the coal-methane sorption process through an isothermal test. However, even though the temperature-dependent Langmuir model was recognized theoretically and

    Jan 1, 2016

  • SME
    Amax's Sleeper mine exceeds expectations on all counts as low-cost gold producer

    By Warren D. Stanford Stanford

    Introduction The Sleeper mine is a near-surface gold mine located in a remote area 56 km (35 air miles) northwest of Winnemucca, NV (Fig. 1). The deposit was discovered in 1984 by an Amax exploration

    Jan 4, 1987

  • SME
    The Brand-New Global Prevention Strategy of ISSA Mining for Safety and Health in Mining Safety 7.7 – 7 Golden Rules to Vision Zero

    By H. Ehnes

    "“Industry 4.0” – “Mining 4.0” - perhaps you have already heard of these terms? These keywords signify the next stage of industrial production. The internet and production technologies are growing clo

    Jan 1, 2016

  • SME
    Innovative Approach for Dust Control in Tunnel Construction - NAT2022

    By Craig Allan

    Underground construction environments, especially those with limited airflow such as shafts, cross passages, and stations, necessitate effective dust control. This requires combining existing measures

    Dec 1, 2022

  • SME
    Designing Leach Pad Liners For Differential Settlement

    By T. V. Ramey

    Heap leaching in certain parts of the world, such as Chile's Atacama Desert, brings unique design problems in the form of possible large differential settlements of the foundation soils due to th

    Jan 1, 1997

  • SME
    Double thickener circuit at Gold Fields' Chimney Creek

    By J. O. Marsden, J. H. Gourdie, J. R. Arnold, J. G. Mansanti

    During the testing and design of the Gold Fields' Chimney Creek mine, it was found that a much higher carbon loading was possible with CIC (carbon-in-solution columns) than with CIP (carbon-in-pu

    Jan 1, 1990

  • SME
    Reclamation of the Canmore Creek Open Pit Coal Mines to Form Quarry Lake Heritage Park, Alberta, Canada; an Example of Successful, Walk-Away, Pit Lake Closure

    By H. G. Stephenson, D. Castendyk

    Open pit anthracite mining at the Canmore Creek Mines, Canmore, Alberta, south of Banff National Park, resulted in several pit lakes by the early 1970’s. To enable future mining opportunities in the R

    Jan 1, 2019

  • SME
    Air Permitting In The Commonwealth Of Independent States

    By W. E. Lytle

    Environmental permitting is a critical component for joint-venture projects located in the Commonwealth of Independent States (CIS). This paper presents the basic CIS regulatory environmental requirem

    Jan 1, 1998

  • SME
    Computing The Reliability Of Soil Slopes Using Conditional Simulation (PRIPRINT 93-273)

    By S. Todd Mickleborough

    The geostatistical technique of conditional simulation is applied to measure the uncertainty in factor of safety predictions for soil slopes where there is incomplete knowledge of the spatial distribu

    Jan 1, 1993

  • SME
    Leveraging West Virginia Mined Lands as Centers of Renewable Energy Growth and Innovation

    By D. K. Mynear, J. S. Gardner, S. Mittle, A. A. Campoli

    West Virginia, although having adequate solar insolation, has witnessed very little actual solar development to date. The reasons for this lack of development are varied, but the primary obstacles to

    Jan 1, 2019

  • SME
    Crushing and grinding at Amax's Sleeper gold mine

    By J. J. DeMull, B. A. Boster

    Amax's Sleeper mine uses conventional cyanidation milling and heap leaching techniques to produce gold. Since milling operations commenced in March 1986, average ore processing rates have improve

    Jan 1, 1990

  • SME
    Machine Performance Monitoring In Surface Mines

    By C. Hendricks

    This paper is based upon field studies conducted in a western Canadian open pit coal mine. This work has involved the adaptation of microprocessor-based instrumentation to monitor various operating pa

    Jan 1, 1991

  • SME
    Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022

    By Adam Bedell, Jack Raymer, Brad Crenshaw

    Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There

    Dec 1, 2022