Stabilizing Flowing Sands on the Millwoods Double Barrel Replacement Project - Uniting Academia and the “Real World” from Field to Lab to FieldBy James J. Brady, Kenneth L. Faught, Chadi El Mohtar, Chaoshi Hu
"During construction of a 9.5-ft. diameter sanitary sewer tunnel, the City of Edmonton encountered a large pocket of flowing sand that flooded their TBM and caused significant surface subsidence, stop
Jan 1, 2016
-
The Application Of Linear Goal Programming To Coal-Fired Power Plant Blending ProblemsBy James E. Lonergan
Linear goal programming is a multi-objective optimization technique where the constraints of a linear programming formulation of a problem are considered as additional objectives. The optimal solution
Jan 1, 1984
-
Reducing The Fire Hazard Of Mine Conveyor BeltsBy Harry C. Verakis
A conveyor belt fire presents a serious safety hazard in an underground coal mine. A review of underground coal mine fires involving conveyor belts which occurred within the past two decades was made
Jan 1, 1991
-
Identifying And Sustaining Best Practices Through Time Studies By ForemenBy C. Hilton
Arch Coal Inc. has implemented and sustained Best Practices at its four western mines through utilizing foremen in ongoing time studies. A prime benefit is the unique opportunity provided to front lin
Jan 1, 2010
-
Artificial neural networks to determine ventilation emissions and optimum degasification strategies for longwall minesIn longwall mining, premining prediction of methane emission rate depends on a number of geological factors, geographical factors, and operational factors. These same factors also can impact the selec
Jan 1, 2009
-
Take Adequate Measures to Ensure Good BidsBy David D. DiPonio, John DiPonio, Roger Van Omen
The greatest opportunity to attain the most favorable prices for underground construction projects occurs during the competitive bidding period. The Owner, Engineer, and Contractor need to have a thor
Jan 1, 2005
-
Geology And Mineralization Of The Lulu Graben, Barrick Mercur Gold Mine, Tooele, UtahBy L. W. Stanger, Erich U. Petersen, William J. Tafuri, Donald M. Hausen, Douglas N. Halbe
Gold mineralization at the Mercur Mine was controlled primarily by structure and secondarily by lithology in Mississippian-age sedimentary rocks. Gold was localized where Sevier-age high angle northea
Jan 1, 1990
-
Cut-and-Fill at Mount Isa Mines Ltd.By B. Hornsby
At the Mount Isa mine, Mount Isa, Qld., Australia, sublevel open-stope mining is used for copper ore while both sublevel open-stope and cut-and-fill methods are used for the silver-lead-zinc ores. Pro
Jan 1, 1982
-
Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining ActivitiesBy K. E. Kolm, W. H. Langer
Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,
Jan 1, 2001
-
Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021By John Newby, Ulf Gwildis, Fred Marquis
From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t
Jun 13, 2021
-
Construction Of The East Side Access Manhattan TunnelsBy Don Hickey
The MTA in conjunction with LIRR, are in the process of expanding one of the largest commuter railroads in the country, with over 260,000 passengers a day. The LIRR, which provides 700 passenger train
-
Alternative production processes for zircon productsBy E. Snyders
Two alternative processes for the manufacturing of zircon products were investigated by the South African Nuclear Energy Corporation (Necsa). These were the synthesis of doped-zircon pigments from pl
Jan 1, 2005
-
Effects of MERV 16 filters and routine work practices on enclosed cabs for reducing respirable dust and DPM exposures in an underground limestone mineBy J. D. Noll
An effective technique to minimize miners? respirable dust and diesel exposure on mobile mining equipment is to place mine operators in enclosed cabs with designed filtration and pressurization system
Feb 1, 2014
-
Site investigations and geotechnical assessment for the construction of the deep underground science and engineering laboratory at the former Homestake Mine - SME Transactions 2011By W. Roggenthen, Z. J. Hladysz, G. D. Callahan, W. G. Pariseau, W. Weinig, C. Randolph-Loar, R. Popielak
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, SD, under the sponsorship of the U.S. National Science Foundation
Jan 1, 2011
-
The Behavior Of Platinum Electrodes As Redox Potential Indicators In Some Systems Of Metallurgical InterestBy K. A. Natarajan
Platinum electrodes are not inert as originally thought to be. The reactivity of platinum electrodes can explain their erratic behavior in many electrochemical measurements of metallurgical interest,
Jan 1, 1970
-
East Side Access project taking shape beneath the streets of ManhattanBeneath some of New York?s most iconic buildings ? The Met Life Building, the Helmsley Building, the Waldorf Astoria ? crews are busily at work on the Metropolitan Transportation Authority?s long-awai
Jan 3, 2010
-
The Current State of Disc Cutter Design and Development DirectionsBy Joe Roby
Rolling disc cutters are the business end of hard rock and mixed face tunnel boring machines (TBMs). Since their first successful employment on a TBM over fifty years ago, disc cutter technology has c
Jan 1, 2008
-
Production Of Cultured Marble Vs. Natural Marble Products (b4a9ead7-5e7a-4659-895b-5a526d8d1c94)By J. O. Costello
Marble is a preferred surfacing material in up-scale buildings. Its use increased in the 1870's with rising national wealth and declined in the 1950's when synthetic materials for these appl
Jan 1, 1999
-
Dewatering for the Lenox Avenue Subway Reconstruction ProjectBy Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001
-
Recovery Of Magnetite At New Zealand Steel Mining Operations Taharoa, New Zealand - SynopsisBy D. R. Buist
The Taharoa plant of New Zealand Steel Mining Limited extracts a 57% Fe titano-magnetite concentrate from a large mineral sand deposit 90 miles south of Auckland on the west coast of New Zealand'