Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Geology Of The Bayan Obo Iron-Rare- Earth-Niobium Deposits, Inner Mongolia, ChinaBy L. J. Drew
The plate tectonic setting, regional geology, and certain aspects of the economic geology of the iron-rare-earth-nio-bium ore bodies at Bayan Obo, Inner Mongolia, China, were studied by a team of geol
Jan 1, 1991
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Explorations and the Study Phase of Exploitation of the Macedonian Gold Deposits in YugoslaviaBy A. Davaliev, K. Hrkovic, V. Pavlovic
On the territory of Macedonia in South Yugoslavia primary and dory gold occurences were known since ancient times. Remnants of numerous goafs and remainders of washaries on river terraces and alluvium
Jan 1, 1988
-
Evaluation Of The Drum Friction Test For Determining The Fire Resistance Of Conveyor BeltsBy J. H. Rowland
The Mine Improvement and New Emergency Response Act of 2006 (MINER Act) amended the Federal Mine Safety and Health Act of 1977 to improve the safety of mines. The MINER Act established a Technical Stu
Jan 1, 2011
-
The Development of a Fully Autogenous Grinding Circuit for the Curragh Resources - Stronsay ProjectBy A. C. T. Bigg, A. F. Colombo, A. R. MacPherson
The step-by-step study of the Stronsay ores follows the testwork through the initial determination of Bond Rod and Ball mill work indices, the MacPherson Autogenous work indices and the production of
Jan 1, 1992
-
The Utilization Of On-Line Analyzers At The Blair Athol Coal Mine, Queensland, AustraliaBy G. France
The Blair Athol Coal Mine (BAC) is a large open cut operation in the Bowen Basin of Queensland, Australia. Current mine capacity is about 11 million tonnes per annum(Mtpa) of export coal. On-line a
Jan 1, 1999
-
Improving estimation of the accuracy of the personal dust monitor (PDM) - SME Transactions 2011By S. J. Page
The personal dust monitor (PDM) is a combined tapered element oscillating microbalance (TEOM) respirable dust monitor and cap lamp, configured to have dimensions and weight similar to those of a lead-
Jan 1, 2011
-
TBM Tunnel Logistics Management on the Longest Outfall Tunnel in the Middle East - NAT2022By H Vigil, G. Peach
Long tunnels with only one access shaft pose many program problems for logistics, combine these with the requirement to drive directly out under the seabed for 10.2 km, and the program issues become e
Dec 1, 2022
-
Reconciling The Conflicts Between Objectives Of Owner, Developer And The Public In Mineral VenturesA viable mineral economy requires availability of economic deposits, the ability to exploit then, and protection of the public interests. The natural tendency for each party to consider only its legit
Jan 1, 1979
-
The Use Of A Microcomputer In The Design And Selection Of Materials Hoisting SystemsBy J. D. Patsey
A computer program has been developed for use by the mining engineer for analyzing drum-type hoists prior to the modification of an existing system or the designing of a new one. Its use permits the p
Jan 1, 1986
-
The Effect Of Turbulence On The Flotation Rate Of Galena When Using Fine BubblesBy D. R. Spears, C. E. Jordan
The U.S. Bureau of Mines examined the influence of turbulence on the fine bubble flotation of fine-sized (minus 40 micron) galena in order to improve flotation efficiency. Fine bubble flotation was ca
Jan 1, 1989
-
The Knowledge Management Landscape in the Greek Coal Mining Industry - Mining, Metallurgy & Exploration (2024)By Christos Roumpos, Philip‑Mark Spanidis, Francis Pavloudakis
Coal mining operations are large-scale, long-term frameworks of high complexity. Mining organizations accumulate, develop, and leverage knowledge from diverse scientific and technological fields as a
Mar 16, 2024
-
The Port Richmond N. Y. Project The Excavating Shield In Saturated, Mixed Glacial DepositsBy Henry J. Jacoby
This report concerns Contract No. 3B of the Port Richmond Project, for the Department of Water Resources of the City of New York. It involves the construction of 7, 000 ft. of 7 ft. finish I. D. inter
Jan 1, 1974
-
Column-Test Determinations Of Adsorption Characteristics Of The Madison Aquifer In The Black HillsBy C. J. Webb
Column experiments were performed to determine the ability of Madison aquifer material to adsorb arsenic and other constituents in a heavily mined watershed of the Black Hills in western South Dakota.
Jan 1, 1999
-
Assessing the Challenges in the Extraction of Gold from Bacterial-Treated Double-Refractory ConcentrateBy G. Ofori-Sarpong, A. -S. Adam, R. K. Amankwah
"In the application of the BIOX® technology, high tailings grade (2-16 g/t) may be generated with a decrease in overall gold recovery, which sometimes make it economically unattractive. This paper inv
Jan 1, 2017
-
The Delivery Of Underground Construction Projects In The UK: A Review Of Good PracticeBy Andy Alder
The aim of this paper is to provide an overview and details of good practice, from a United Kingdom perspective, in the development and implementation of major tunnel and underground infrastructure pr
-
State of the Art in the Modeling and Design of Autogenous and Sag MillsBy L. G. Austin
The paper summarizes the current state of development of simulation models for SAG and FAG mills, and gives the results of recent investigations of the physical processes occurring in autogenous grind
Jan 1, 1989
-
The Study on the Micro-climate in a Mine Central Pump and Power StationBy Yiyin Ma, Yuqi Chen
Based on two in-situ measurements and mathematical analysis, the micro-climate in a large central underground pump and power station has been discussed in this paper. It is found from the research tha
Jan 1, 1991
-
The State-Of-The-Art In Coal Pillar Design (6a33d9ed-6bb8-48bc-96fc-7206a236ffd8)By 1980, the U.S. mining community had reached a broad consensus regarding coal pillar design. The pillar load could be estimated from tributary area theory, and the pillar strength from empirical for
Jan 1, 1999
-
Mini Pilot Plant Evaluation Of The Avr Process For The Las Cristinas Gold ProjectBy P. Riveros, J. Binvignat, V. M. McNamara, D. Koren
The feasibility of recovering cyanide and copper from a gold mill barren solution was evaluated in a small A VR pilot plant. The campaign lasted 64 hours, during which time about 4,000 L of gold mill
Jan 1, 1997