Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Contractor’s Redesign of Construction Methods and Proceduresfor New York City Transit Authority Contract C-20201By Bernard A. Grand, Gary A. Almeraris
This project involves the reconstruction of a 1,100 ft. long by 75 ft. wide segment of an existing 4 to 5 track subway under Northern Boulevard in the Borough of Queens in New York City. The project i
Jan 1, 1999
-
High Intensity Conditioning To Improve Flotation Of Gold Fine ParticlesBy Jorge Rubio, Luis Valderrama, Carlos Pérez
This work describes the effect of the degree of energy transferred to the pulp, during the conditioning stage, on gold flotation fines recovery, grade and kinetics, with three types of frother (Dowfro
Jan 1, 1995
-
Using the continuous improvement process to optimize opencast mining operationsBy D. Gärtner, A. Oster
"""Operational excellence"" provides a sound foundation for RWE Power AG's three strategic pillars (innovation, expansion and organic growth). The maintenance and development of operational excel
Jan 1, 2011
-
Understanding VariancesAs mentioned in chapter 8, one of the objectives of the budget is to provide a mechanism for ongoing measurement and control of the production operation. The budget shows expected performance. Actual
Jan 1, 1999
-
Image Analysis of Froth for Improved FlotationBy L. B. Hales
Color video or digital cameras have been installed over flotation cells to monitor color, bubble size, froth movement, and other characteristics. These systems are designed so that the camera provides
Jan 1, 1999
-
Plant and Laboratory Practice in Nonmetallic FlotationBy Edwin H. Bentzen, Immo H. Redeker
Important industrial minerals are separated and concentrated by froth flotation by industry today. The following descriptions are presented as an overview of the methods employed to separate and recov
Jan 1, 1986
-
Changing Trends in Gold Ore Treatment in Western Australia. The Problem of Refractory OresBy Jim Avraamides
Historically, much of Western Australia's gold production has come from the refractory sulphide-telluride ores located in Kalgoorlie's Golden Mile. Most of the recent gold boom has been asso
Jan 1, 1989
-
Simulator For Degasification, Methane Emission Prediction And Mine VentilationBy P. W. Johnson, H. Fan, S. B. Patton, T. Novak, R. L. Sanford
A computer model is presented that quantitatively uses the relationship between the interactive and dynamic processes of methane drainage, mining, and ventilation. The model includes simulation of the
Jan 1, 1995
-
Gold Fields La Cima Cerro Corona Project Building For Perú’s FutureBy R. Graeme, J. Komadina
Gold Fields acquired an option to purchase the Cerro Corona Project, located in Hualgayoc, Cajamarca Department, Perú, in December 2003. In January 2006, the option was taken up and the transaction c
Jan 1, 2007
-
Techno-Economic Assessment Of Tailings RetreatmentBy D. Malhotra
Metallurgists are continuously striving to improve recovery. But optimization of profits and/or revenue dictates that recovery can be sacrificed at the expense of throughput. However, recently there h
Jan 1, 1994
-
Recovery of "Lost" Gold with Vacuum TechnologyBy Jurgen H. L. Stuve, Rick E. M. Widelski
Any one who has been involved with the mining or the treatment of gold-bearing ores will agree that at the end of the total process, the quantity of gold recovered is never as much as was expected. Th
Jan 1, 1993
-
A Simulation Analysis of the Net Effect of Feed Particle Size Distribution on SAG Mill PerformanceBy Jaime E. Sepúlveda
Semiautogenous grinding (SAG) operators have been realizing the very significant impact of fresh feed particle size distribution on the mill grinding capacity. In actual practice, this impact may be q
Jan 1, 2005
-
Comann Survey Shows Increased Compensation For Minerals ExecutivesBy R. Kent Comann
The sixth survey on the mining industry by Comann Associates provided data for entry-level and midlevel engineers as well as executive officers. Average 1989 compensation - base salary and anticipa
Jan 1, 1990
-
James R. Arnold: An Interview With the 2007 SME PresidentHow did you get into mining; were you from a mining town or mining family? Not at all. I grew up in northwest Kansas. I liked to hunt and fish, so I thought it would be fun to work for a company
Jan 1, 2007
-
The Role of Electrochemistry in HydrometallurgyBy Michael J. Nicol
Hydrometallurgical processes involve the recovery of metals from ores, concentrates, calcines, mattes and scrap materials by a series of operations involving leaching or dissolution, separation, purif
Jan 1, 1993
-
Decision Tools For Integrating Sustainability Into Planning And Feasibility Phases Of Projects For Extractive Sector Enterprises ? IntroductionBy A. Ramage
Since late 2010, CH2M HILL has been working with a confidential client who holds a long-term commitment to sustainable development (SD). The commitment is aligned with all three elements of the triple
Jan 1, 2012
-
A Method Of Determining In Situ Stress In Anisotropic RockBy Robert M. Becker
The evaluation of in situ rock stresses from measurements of the change in diameter of a borehole that is stress-relieved by overcoring has become a common practice. Generally the stress evaluation ha
Jan 1, 1968
-
Estimation of model parameters for liberation and size reductionBy G. T. Adel, W. Z. Choi
In previous work at Virginia Tech, a population balance-model describing the simultaneous processes of size reduction and mineral liberation has been developed. Experimental verification of this model
Jan 1, 1987
-
Precipitates from the Peterburgskoe and Irinovskoe hydrothermal fields, mar: Geochemistry of seafloor and subseafloor mineralizationBy Irina Melekestseva, Beltenev. Victor, Victor Ivanov
"One of the major problems discussed over the last years is a possibility of mining of seafloor massive sulfide deposits. In spite of the pessimistic points of view on their commercial development, th
Sep 1, 2014
-
Numerical analysis of a rock bolt load indicator washer neglecting the stress relaxation effectBy Eugie Kabwe
The effective employment of a pretensioned bolt within support structures requires an appropriate installation tension as a result of sufficient bolt head/nut preload. In this paper, a load indicator