Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Controlled Dispersion Of Clays And Its Effects On Phosphate Clay Waste DewateringBy Douglas M. Deason
Swelling clays, such as montmorillonite, contribute significantly to the poor dewatering and consolidation behavior of the Florida phosphate clay wastes. Understanding and to a degree, control of the
Jan 1, 1983
-
Transforming HSE Performance It's Not Harder Than You ThinkBy B. Kraus
Many of us who have interacted with senior executives from leading oil and gas companies over the last few years on the subject of HSE performance have observed a marked shift in their engagement on t
Jan 1, 2011
-
Chemical Grinding Aids For Increasing Throughput In The Wet Grinding Of OresBy Richard Klimpel
1. Introduction Laboratory and industrial grinding tests have shown that the process of size reduction can be significantly influenced by chemicals added to the powder or slurry being ground. The te
Jan 1, 1977
-
Mining Methods For Efficient Barite RecoveryBy Keith S. Olsen
Any discussion of barite mining is virtually impossible without considering, almost in the same breath, the many other variables, such as beneficiation, transportation, infrastructure and location tha
Jan 1, 1980
-
Wire Ropes For Mines - Selection, Installation, Inspection, And Maintenance - SelectionBy Robert E. Goodwin
There are four main requirements which must be considered when selecting a wire rope for the best serviceability. A proper choice is made by correctly estimating the relative importance of each of the
Jan 1, 1968
-
Status Of Flywheel-Powered Shuttle Car DevelopmentBy D. Christofferson
As an alternative power source to eliminate trailing cables, ESD Corporation is installing a flywheel system on a shuttle car. Flywheel power is extracted by a high-speed generator, developed by Lear
Jan 1, 1981
-
Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide OreBy H. K. Lin
The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic
Jan 1, 2008
-
Design Aspects of the Minneapolis Central City Parallel Tunnel - RETC2023By Randall C. Divito, Craig R. Eckdahl, Bruce D. Wagener, Joseph Klejwa
The existing Central City Tunnel was built primarily in the 1930s with a small portion as old as the 1880s. It conveys stormwater in downtown Minneapolis. It is a 4,400-ft long tunnel located 80 feet
Jun 13, 2023
-
The Application Of Trend Surface Analysis To The White Pine Copper Deposit ? IntroductionBy S. C. Nordeng
The program described in this paper is primarily a test of the possible utility of multiple regression in ore search, It was carried out as a cooperative project between White Pine Copper Company, the
Jan 1, 1964
-
Bergen And Beyond: Western Norway's Plans For A Tunnel And Bridge NetworkBy Josef Martinsen
This paper describes two-lane dual motorway tunnels under construction in Bergen. The tunnels are part of a by-pass motorway system throuth the most congested area of the city of Bergen. The tunnels a
Jan 1, 1987
-
Sorption Of Uranium, Strontium And Cesium On Pozzolan (d4a7326b-a4a2-4918-ab85-b41947959c5f)By U. Cetin
The Nevada Test Site is located approximately 65 miles northwest of Las Vegas, NY. The site was primarily used by the Department of Energy for the field testing of nuclear weapons and contaminated by
Jan 1, 1998
-
Uranium Precipitation With Hydrogen PeroxideBy Richard A. Brown
The direct precipitation of uranium with hydrogen peroxide has been known since 1877. Commercial use of the process began in the 1960's. During 1967 the Bureau of Mines assisted the Climax Uraniu
Jan 1, 1980
-
Minerals Processing 1989Crushing and grinding activity in 1989 followed the rapid pace of the mineral industry. Use of existing installations, demand for expanded capacity, and implementation of entirely new operations contr
Jan 1, 1990
-
Homestake's Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline StudiesBy C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani
The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine or the expansion of an existing mine can range from nine to 24 months, or even longer. The time
Jan 1, 2003
-
Computer Simulation of Methane Migration in Longwall Panels with Descentional VentilationBy Yuanping Chen, Yihui Zhao, Yunhe Hong
It is important to study the methane transport phenomenon in a longwall panel under descentional ventilation conditions. The gob area is divided into a number of rectangular percolating elements, each
Jan 1, 1991
-
Enhancement Of Bacterial Iron And Sulfate Respiration For In-Situ Bioremediation Of Acid Mine Drainage Sites: A Case StudyBy James M. Harrington, A. Azra Bilgin, JoAnn Silverstein
The prevention of AMD in situ is more attractive compared to subsequent downgradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the micr
Jan 1, 2005
-
Rock Mechanics Applications To The Design Of Oil Shale Pillars ? IntroductionBy Jose F. T. Agapito
The mining engineer must be able to predict the structural behavior of the rock around underground openings so that he can answer questions relating to safety and economics. With the present status of
Jan 1, 1974
-
SelectionConsiderations - Using a ConsultantBy Alfred Weiss
Selecting a minicomputer is not unlike selecting a costly piece of mining equipment such as a truck, shovel, crusher, or conveyor belt system. A marked difference might lie in the frequency at which s
Jan 11, 1981
-
Resource Requirements And Environmental Economics Of Coal ConversionBy Charles A. Beasley
Coal conversion to electricity or to substitute natural gas requires a significant quantity of natural and human resources including, in addition to the coal resource base, land, water and the constru
Jan 1, 1983
-
Planning for the Drumanard Highway Tunnels, KentuckyBy Lawrence Williamson, Randall J. Essex, David P. Field
As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or
Jan 1, 2005