Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dynamic Fractured Flow Simulation ModelBy A. S. C. Owili-eger
An efficient state-of-the-art dynamic model to simulate and predict the rate of water production in longwall coal mining operations was developed as a tool for mine planning purposes. The model can al
Jan 1, 1987
-
Application Of Kinetics And Liberation Data To Analysis Of An Industrial Flotation ProcessBy N. W. Johnson
Two analysis tools which have been applied to problems in industrial Flotation processses are the application of kinetics and detailed mineralogical or liberation data, both on a size-by-size basis. T
Jan 1, 1985
-
Preconcentration of Iron, Rare Earth, and Fluorite from Bayan Obo Ore Using Superconducting Magnetic Separation "Mining, Metallurgy & Exploration (2021)"By Jieliang Wang, Shiwen Yi, Zhao Cao, Peng Zu
Bayan Obo ore contains mainly bastnaesite, monazite and associated iron, fluorite, calcite, dolomite, barite, and trace amount of columbite. Due to its complex mineral compositions and similar mineral
Sep 15, 2020
-
Groundwater Pressure Consideration on Partially Drained Tunnel Lining Rehabilitation Design - NAT2022By Irwan Halim, Young Jin Park
A new tunnel lining was designed for rehabilitation of the existing unlined Weehawken Tunnel in New Jersey. Structural assessment using beam spring models was performed for the lining design as a drai
Dec 1, 2022
-
Amtrak East River Tunnels Structural Repairs and Reconstructions - NAT2022By Daniel McNamee, Wern-ping N. Chen
The Amtrak East River Tunnels include four tunnels, Line 1 to Line 4, which extend from New York Penn Station in Manhattan, under the East River to Sunnyside Yard in Long Island City. Since fall 2015,
Dec 1, 2022
-
Tunnel Rehabilitation Through Historic Landslides in Laguna Beach - NAT2022By Trenton Cohen, Joseph McDivitt, Shimi Tzobery, Joseph Sinacori, Scott Zylstra
The 2-mile Beach Interceptor Sewer Tunnel was constructed in 1954 to then-current mining and construction standards. Due to its lifespan and deteriorating condition it is now being stabilized and reha
Dec 1, 2022
-
Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021By P. Nelson, R. O’Connell, J. Rostami
Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u
Jun 13, 2021
-
Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021By D. Nebbia, R. Aliberti, F. Solesin
The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren
Jun 13, 2021
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021By Giuseppe Gaspari, Xiangrong Wang
The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr
Jun 13, 2021
-
Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021By John Newby, Ulf Gwildis, Fred Marquis
From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t
Jun 13, 2021
-
Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?By Giuseppe M. Gaspari, Tamara Kondrachova
Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet
Jun 13, 2021
-
Acid/Base Sites On Mineral Filler Surfaces Determined By The Adsorption Of Probe Molecules (AIME)By R. J. Pugh
In addition to directly analyzing the surfaces of minerals using high vacuum instrumentation methods, some important surface properties of mineral fillers can be determined indirectly by using reactiv
Jan 1, 1992
-
Noranda's Carbon-In-Pulp Gold/Silver Operation At Happy Camp, CaliforniaBy Gary L. Simmons
Noranda's Grey Eagle Mine and Mill, located in the Siskiyou Mountains of Northern California, began shakedown operations in the late fall and early winter of 1982. This paper describes some of th
Jan 1, 1984
-
Surface Treatments of Mineral Fillers for Plastics as Viewed from a Flotation Chemist's PerspectiveBy W. M. Cross
The use of fillers and reinforcements for plastics has increased considerably over the past few decades. For example, in the 1980's the average growth rate of filler use was 5.8%. [Katz and Milew
Jan 1, 1997
-
Statistical Analysis Of Diesel Particulate Matter And Silica For Underground Stone Mines - SME Annual Meeting 2022By E. Rubenstein, V. Gangrade, K. V. Raj, M. L. Harris
Underground stone mine ventilation is characterized by large openings with low resistances. These mines primarily face three challenges: moving adequate volumes of air, controlling and directing the a
Mar 2, 2022
-
Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
-
Risk Assessment and Large Diameter Segmental Lining Design in Swelling Ground - NAT2024By Carlos Álvarez, Sergio Sánchez, Michael Mains, Giuseppe Gaspari
Extensive record of tunnels excavated with SEM (sequential excavation method) in swelling grounds exists in literature: global experiences include successful tunnelling both through clayey and rock ma
Jun 23, 2024
-
Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024By Joan Carles Casado Ortega, Mitchell Gerdtau, Sandeep Pyakurel, Eric Crocker, Frank Perrone
The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal
Jun 23, 2024
-
X‑ray Computed Tomography Evaluation of Crushed Copper Sulfide Ore for Pre‑concentration by Ore Sorting - Mining, Metallurgy & Exploration (2022)By Chaoxun Zhao, TAIYOU LI, JIAQI JIN, Jan D. Miller, Chen‑Luh Lin
A large portion of the energy consumed in copper concentrators is used to reduce the particle size of the feed by crushing and grinding. The cost of metal production could be reduced if low-grade part
Nov 30, 2021