Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Heap Leach Gold Production ModelingBy M. Irish, M. Jahraus
Accurate prediction of gold (or other metal) production from a heap leach operation is essential to the economic vitality of any such operation. However, this is also one of the most challenging issu
Jan 1, 2001
-
Economics Of GraphiteBy Wilfred M. Kenan
The relationship of various genetic classifications of graphite, their properties and general applications are reviewed. The classifications being amorphous, flake, high crystalline (vein) primary syn
Jan 1, 1984
-
Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of DesignBy Jimmy Thompson
The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const
Jan 1, 2008
-
Cyanide Leach Process Bans: The Technical SideBy C. A. Young
Cyanide is a fast-acting, highly toxic substance but, at the same time, is deemed essential for sustaining life as well as our standard of living. In this manuscript, the facts about cyanide are pres
Jan 1, 2001
-
Assessment Of Potential Groundwater Flow Within Sub-Permafrost Groundwater At Red Dog Mine, AlaskaBy J. Kulas, J. Weaver, K. Hagley
An assessment of potential groundwater movement beneath the tailing impoundment at the Red Dog Mine was performed, and has indicated a unique aquifer situation within sub-permafrost groundwater at the
Jan 1, 2002
-
Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest InterceptorBy Samuel J. Gambino
Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p
Jan 1, 2008
-
The DC WASA Anacostia River CSO Control Tunnel ProjectBy David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri
On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo
Jan 1, 2007
-
Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct TunnelBy C. D. Hebert, M. R. King
The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with
Jan 1, 2007
-
Dynamic Simulation Of Grinding Circuits As An Aid For The Diagnosis Of Hydrocyclone Malfunction - Preprint 09-100By C. Bazin
Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the identi
Jan 1, 2009
-
Mechanical Mining: The State Of The Art (c03fcc45-2470-4064-ab30-327f1c5b2089)By L. Gertsch, R. Gertsch
Mechanical mining is steadily gaining usage in the mining industry. A variety of machines currently finds employment: tunnel boring machines, roadheaders, continuous miners, surface miners, and auger
Jan 1, 2001
-
A Coal-Based Energy Policy For The 21st CenturyBy M. Deul
For the first half of the 21st Century the USA will rely on the same mix of fuels as for the past 50 years: Petroleum will cost more and availability will decline as developing nations modernize. Incr
Jan 1, 2002
-
Ore Characterization For Process Control: An Update Of A Mesabi Range ProjectBy Richard Gertsch, Jack Eloranta, Leslie Gertsch
An ongoing research program is characterizing the ore qualities that most affect mine and mill processing of iron. Current practice uses assays of magnetic iron and silica, but additional qualities a
Jan 1, 2005
-
Effects Of Surface Forces And Film Elasticity On Froth StabilityBasic parameters affecting the stability of foams have been studied. We used the thin film pressure balance (TFPB) technique of Scheludko and Exerowa (1959) to measure the surface forces in foam films
Jan 1, 2006
-
Economics Of Autogenous GrindingBy S. Lähteenmäki, P. Koivistoinen, J. Levanaho
Semi Autogenous Grinding (SAG) circuit is the most common grinding circuit to day. In Europe and South Africa fully autogenous (AG) circuits are also popular. SAG circuit has a lower capital cost and
Jan 1, 2001
-
Case Study: The Glenrock, Wyoming Subsidence Control ProjectBy J. J. Gusek, J. T. Gormley, V. Scovazzo
Glenrock, WY is underlain by two abondoned coal mines. Subsidence events have been recorded over the years, with the frequency increasing in recent years. As part of Wyoming's Abondoned Wins Land
Jan 1, 1986
-
The Characterization Of Frothers And Frother Blends Based On Dynamic Surface Tension MeasurementsBy B. Comley, M. C. Harris
There is as yet no accepted method of predicting flotation frother performance in plant processes based on laboratory scale characterisation techniques. This paper investigates the use of dynamic surf
Jan 1, 2001
-
Effective Management And Risk Prevention While Blasting Inside High Sensitivity Areas - The Case Of The Atherinolakkos Power Plant Extension ProjectBy E. Baliktsis
PPC (Public Power Corporation) operates a new power plant at the South-West part of Crete. Recently the extension of the Power Plant started. ATHENA SA the main contractor of the project assigned to E
Jan 1, 2006
-
Portland, Oregon’s Alternative Contract Approach—A Final SummaryBy Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007
-
How To Develop An Optimum Metallurgical Project (322b7426-21ae-4055-bbba-e346381936a6)By R. W. Smith, D. L. Taylor, K. A. Altman
The importance of metallurgical information in reaching appropriate decisions during the development of mining projects is demonstrated. A financial analysis is calculated using a simulation that inc
Jan 1, 2000
-
Practical Elements of Project Management For Underground ConstructionBy Dean R. Gehring
Creating projects to reach a goal is not new to American industry. In fact, all major construction projects, from skyscrapers to bridges, are completed using similar project management techniques. H
Jan 1, 1996