A Discussion Of The Economic Impacts Of Regulations Governing The Stabilization And Decommissioning Of Uranium Milling FacilitiesBy William J. Almas
Operating uranium mill tailings containment and mill decommissioning activities are regulated by the Nuclear Regulatory Commission (NRC) and the Environmental Protection Agency (EPA) through numerous
Jan 1, 1991
-
Engineering, Geologic And Hydrologic Characteristics Of Lake Bonneville Sediments, UtahBy A. E. Kurie
The Great Salt Lake occupies about 1000 square miles whereas its predecessor, Lake Bonneville occupied 20,000 square miles and its shoreline reached 1000 feet above the present lake level. The sedime
Jan 1, 1967
-
Integrating Reclamation Into Mine Planning At The Chimney Creek MineBy William A. Faust
At Gold Fields' Chimney Creek Mine, major reviews of the reclamation and closure plans are done concurrently with the annual mine planning required for budget preparation. This review includes id
Jan 1, 1992
-
Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021By Aaron Archer, James Parkes
This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum
Jun 13, 2021
-
Yield Index: A New Method For The Analysis Of Flotation ResultsBy M. T. Ityokumbul
The use of yield index, the product of the yield and gangue rejection, for the optimization of separation processes is presented. The characteristics of the yield index are contrasted with separation
Jan 1, 1997
-
Raising the Roof, Successfully Overcoming a Starter Tunnel Roof Collapse Incident at the Westerly Storage Tunnel - NAT2024By Richard DePew, Robert J. Auber
The Westerly Storage Tunnel is a 25-foot diameter segmentally lined storage tunnel that is a major component of the Northeast Ohio Regional Sewer District's Project Clean Lake that is designed to capt
Jun 23, 2024
-
Magnex Pilot Plant Evaluation -A Dry Chemical Process For The Removal Of Pyrite And Ash From CoalBy Clifford R. Porter
A 200 pound per hour Magnex Pilot Plant was designed and constructed. A non-compliance Eastern Coal which would generate more than 2.0 lb of SOZ per million Btu upon burning was brought into complianc
Jan 1, 1977
-
An Investigation Of The Effects Of Mill Volumetric Load Level, Percent Solids, And Speed Upon Semi-Autogenous Mill OperationBy J. L. Vanderbeek
The SAG milling of ores with markedly variable grinding rates presents definite process control challenges. Decisions must be made regarding the selection of the most appropriate combination of mill v
Jan 1, 1985
-
Industrial Minerals--A Prospective For The Next Decade: 1985-1995By James J. Fallon
The industrial minerals industry is defined loosely and a specific list is presented. Criteria by which to judge prospects and examples are provided. General trends of the industry are observed.
Jan 1, 1984
-
Phosphate Rock From Mine To PlantBy D. H. Lynch
This paper is a general description of current Central Florida phosphate mining, beneficiation and product transportation. It is directed and believed to be of interest to engineers not familiar with
Jan 1, 1978
-
Clean Air Compliance By A Coal-Based UtilityBy G. R. Hart
The expected 1990 Clean Air legislation is providing electric utilities with a series of challenges and decisions as the utilities prepare strategies to comply with the resulting regulations. This pap
Jan 1, 1991
-
Literature Research As An Exploration ToolBy Richard J. Lundin
Literature research is an inexpensive, yet effective tool for the direct discovery of ore deposits. Case studies abundantly demonstrate that properties with viable mineralization and *proven reserves
Jan 1, 1977
-
The Coal Quality Expert: Introduction To The Acid Rain Advisor (beae044d-7b5d-4d01-8abc-f3b7c00f313b)By C. D. Harrison
The 1990 Clean Air Act Amendments specify national objectives for reducing sulfur dioxide emissions from coal-fired power plants System-wide reductions can be achieved by combining various emissions c
Jan 1, 1992
-
Equipment Selection For Burden Removal Associated With Deep Seated, Thick Seam CoalsBy Max B. Holfeltz
[Many factors impact the selection of one mining method over another for deep seated, thick seam coat deposits. Generally if an operating mine is recovering coal at high volumes from thick seams then
Jan 1, 1983
-
Mine Accident Liabilities -- Planning For PreventionBy T. M. Biddle
If an accident occurs at a mine, the mining company, its parent and affiliates, and its supervisory employees may face substantial -- and sometimes unexpected -- liabilities and costs. This presentati
Jan 1, 1986
-
An On-Board Electrical Diagnostic System To Improve The Availability Of Continuous Mining MachinesBy J. L. Kohler
Control circuit failures contribute significantly to continuous miner downtime. The time required to put the machine back into production is a function of the time required to diagnose the problem, ob
Jan 1, 1993
-
Mine Drainage Pollution Abatement Of Dents Run 'Hater ShedBy Robert B. Scott
The Dents Run Demonstration Project near Morgantown, West Virginia, was a cooperative venture involving the U.S. Environmental Protection Agency (EPA), the Water Resources Division (WRD)(1) of the Wes
Jan 1, 1977
-
Applications Of Surface And Borehole Geophysics To Uranium Waste Disposal PracticesBy Muriel S. Robinette
Ground-water contamination from uranium operations could be avoided with proper site analysis techniques. Contamination from tailings disposal sites is carried downgradient within permeable hydrostra
Jan 1, 1980
-
A Longwall Simulation ModelBy Charles B. Manula
This paper describes the development of a mathematical model for simulating the behavior of a longwall coal production system. The longwall simulator is a design simulator incorporating both determini
Jan 1, 1978
-