The Flotation Recovery of High-Purity Gibbsite Concentrates from a Brazilian Bauxite OreBy Chen L. Lin, Luis R. M. Bittencourt, Jan D. Miller
Recently research efforts have been made to obtain a high-purity gibbsite concentrate, suitable for first-class alumina refractories, from a Brazilian bauxite ore containing gibbsite (50%), quartz (35
Jan 1, 1990
-
Effective Management And Risk Prevention While Blasting Inside High Sensitivity Areas - The Case Of The Atherinolakkos Power Plant Extension ProjectBy E. Baliktsis
PPC (Public Power Corporation) operates a new power plant at the South-West part of Crete. Recently the extension of the Power Plant started. ATHENA SA the main contractor of the project assigned to E
Jan 1, 2006
-
Mineral Projects Evaluation With The Aid of Micro-ComputerBy H. J. Zhang, W. Wui
With the adoption of market-oriented economic policies, Chinese non-ferrous metals industry has gained remarkable progress. The continuously increasing domestic demand for non-ferrous metals, however,
Jan 1, 1996
-
Conversion Of Fixed Speed To Variable Speed For Sag Motors At The Barrick Goldstrike MineBy J. Hebert, J. Donnelli, J. Sedey
Installation of a Load Commutated Inverter (LCI) provides an economical method for conversion of a Fixed Speed Semi-Autogenous Grinding Mill into one with variable speed, qualities. Though capital int
Jan 1, 1999
-
Initial Filling of 15 km Long, 10.50 m Diameter Voluminous Water Conductor System Constructed in Fragile Himalayan Geology - With Specific Reference to SJVN’s Rampur Hydro Electric Project (412 MW) - IndiaBy Rakesh Sehgal, Pushkar Verma, Mohit Sharma
"SJVN Limited successfully commissioned its Rampur HEP (412 MW) in 2014. The project has been planned to operate in tandem by directly utilizing the Tail Water of SJVN’s prestigious Nathpa Jhakri Hydr
Jan 1, 2016
-
Determination of the Fire Hazards of Mine Materials Using a Radiant Panel (ME Technical Papers)By R. A. Thomas, C. D. Litton
"The objective of this study was to develop a laboratory-scale method to rank the ignition and fire hazards of commonly used underground mine materials and to eliminate the need for the expensive larg
Jan 1, 2015
-
South African National Government Policy And The Platinum IndustryBy T. Kelly
The post-apartheid South African government has instituted a new minerals policy. As part of the new policy, minerals rights are now held by the national government, not as private property. In additi
Jan 1, 2004
-
Model for the active horizontal force of shield supportBy D. R. Zhu, H. S. Chiang, Y. M. Jiang, S. S. Peng
Two types of underground tests on three types of shield supports, 2-leg, 4-leg, and chock shield, were con- ducted to measure the horizontal movement of the canopy against the immediate roof. In no fr
Jan 1, 1990
-
Premining Investigations For Ground Control State-Of-The-ArtBy Yoginder P. Chugh, M. Silverman
Premining investigations involve the determination of roof, floor, and coal seam characteristics to delineate areas of troublesome ground control prior to development of a mine. Data obtained can be u
Jan 1, 1982
-
The Implementation Of Caro's Acid As A Cyanide Tailings Treatment Method At Lone Tree MineBy J. A. Cole
This paper discusses the modification of the cyanide tailings treatment method from ferrous sulfate to Caro's acid (peroxymonosulfuric acid). An examination of the operating parameters, costs, an
Jan 1, 1996
-
Probabilistic Ecological Risk Assessment (ERA) Incorporating Geochemical Speciation to Determine Bioavailable Metals in Freshwaters Affected by Acid Rock Drainage (ARD).By J. Twining, V. Nguyen, J. Perera
A computer code for ecological risk assessment (ERA), AQUARISK, has been developed and applied to evaluate the likelihood of biotic detriment due to exposure to acid rock drainage (ARD) from the Burku
Jan 1, 2000
-
Application Of The Mine Roof Simulator For Assessing Load Strengths Of Various Mine Roof Support CribbingsBy P. M. Yavorsky
Using a mine roof simulator press capable of duplicating the expected magnitude of vertical and horizontal forces experienced by underground mine roof supports, load capabilities of some roof support
Jan 1, 1984
-
Geochemical types of sulfide ore as indicators of mineral evolution at the hydrothermal vent field Jubileynoye (MAR)By Anna Sukhanova, Svetlana Babaeva, Sergey Andreev, Victor Beltenev
"The Zenith-Victoria /1/ and Jubileynoye /2/ hydrothermal fields have symmetrical structural position on the Mid Atlantic Ridge (Fig. 1). In order to compare the evolution of hydrothermal systems, we
Sep 1, 2014
-
A Life-Cycle Approach To Coal Resource Analysis: Examples From The Appalachian And Illinois BasinsBy R. C. Milici
Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from
Jan 1, 1997
-
Clearance Improvements for the White Haven and Rockport TunnelsBy J. C. May, G. M. Elliott, J. J. Brady
Increased clearance was required in two railroad tunnels that were built about the time of the Civil War. Clearance infringements, whether they be excavation tights or caused by ice accumulation, redu
Jan 1, 1997
-
Limnology of the Sleeper Pit Lake, Humboldt County, NevadaBy Steven A. Atkin, William D. Schrand
Closure plans for open pit mines require the prediction of final pit lake water chemistry. The geochemical models used for water quality predictions make assumptions about the physical and chemical be
Jan 1, 2000
-
A parametric study for the effect of dip on stone mine pillar stability using a simplified model geometryBy Morgan M. Sears, Gamal Rashed, Michael M. Murphy, Brent Slaker
A parametric study was conducted using FLAC3D numerical models to examine the impact of oblique loading on the strength and yield pattern of a stone pillar using two simplified geometry types. In type
-
A Preliminary Study on the Beneficiation and Recovery of Valuable Metals from Municipal Solid Waste Incineration Bottom Ash - Mining, Metallurgy & Exploration (2024)By Sidi Deng, Sharon Pedraza, Aaron Noble, Subodh Das, Bin Ji, Wencai Zhang, Michael Van Brunt
In this study, a MSWI bottom ash sample was assessed to evaluate the feasibility of various physical beneficiation processes in concentrating valuable elements prior to chemical leaching. The raw samp
Apr 27, 2024
-
Disc Cutting Tests On Dry And Saturated Sandstone: Muck As A Performance EstimatorBy M. Z. A. Bakar
A series of full scale laboratory linear rock cutting tests was carried out with a long bladed single disc cutter (292 mm diameter, 11mm wide constant cross-section blade) on dry and water saturated s
Jan 1, 2012
-
Los Angeles Metro Gold Line Eastside Extension—Tunnel Construction Case HistoryBy Christophe Bragard, Brett Robinson
This paper reflects the challenges encountered during the construction of the light rail tunnels under Boyle Heights, in Los Angeles, California. Equipped with two state-of-the-art EPB TBMs, the c
Jan 1, 2007