Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Role Of Engineering And Geology In Analyzing Ground Control Conditions

    By David A. Newman

    Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f

    Jan 1, 1999

  • SME-ICGCM
    Time Dependent Strength Of Coal Strata For Long-Term Pillar Stability

    By Z. T. Bieniawski

    A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest

    Jan 1, 1994

  • SME-ICGCM
    Mobile Roof Supports For Pillar Retreat Mining

    By Robert P. Kudlawiec

    The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th

    Jan 1, 2000

  • SME-ICGCM
    Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study

    By Li Yang, Andre Cezar Zingano, Alberto Fronza

    "Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f

    Jan 1, 2017

  • SME-ICGCM
    Relationship Between Floor Rock Stress And Floor Failure

    By X. S. Tan

    This paper deals with the analysis of stress condition on the interface between two types of floor rock materials when the vertical stress is larger, or when the horizontal stress is larger in a recta

    Jan 1, 1990

  • SME-ICGCM
    A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining

    By G. J. Hasenfus

    This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw

    Jan 1, 1988

  • SME-ICGCM
    3D Modelling of Mine Backfill

    By Muhammad Zaka Emad, Rangzeb Goraya, Muhammad Usman Khan

    "Numerical modeling has been used extensively to assess the stability of surface and underground mines. Tabular, steeply dipping ore bodies are generally mined out by open stoping methods with delayed

    Jan 1, 2017

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    25 Years of Progressive in Numerical Modeling for Ground Control ? What Have We Accomplished and Where Do We Go Next?

    By Keith A. Heasley

    Exactly 25 years ago this month (August 12, 1981), IBM introduced the ?Personnel Computer? with a 16 bit operating system called MS-DOS 1.0. Since then, Moore?s Law, which essentially states that

    Jan 1, 2006

  • SME-ICGCM
    Rock Mechanics Study Of Lateral Destressing For The Advance-And-Relieve Mining Method (2bf3b56c-1393-4658-a2e4-6e9ace0d24dd)

    By Hamid Maleki

    The advance-and-relieve method benefits from lateral destressing associated with mining in laminated rocks and a high horizontal stress regime. This stress control method is based on measurements show

    Jan 1, 2003

  • SME-ICGCM
    CBM Extraction Engineering Challenges and the Technology of Mining the Upper Protective Seam in the Daxing Mine, China

    By Yuanping Cheng, Jingyu Jiang, Qiang Zhang

    "With the increase of mining depths, deep-seated coal seams face threats from high ground stresses, high gas pressures, high gas content, and low seam permeability, which significantly increase the li

    Jan 1, 2017

  • SME-ICGCM
    Numerical Simulation of Reinforced Concrete Mine Seal Subjected to Explosion Loading

    By Khaled Morsy

    The tragic incidents at Sago and Darby coal mines in 2006 pointed out the need for stronger seals to resist the blast effects of violent gob explosions. Mine Safety and Health Administration (MSHA) ha

    Jan 1, 2008

  • SME-ICGCM
    Roadway Supporting Technology Applied to Very Soft Coal Seam at Yanlong Mining Area in China

    By Sheng Zhang

    The compressive strength of coal in Yanlong mine area of China is less than 3 MPa. Basically, it is powdery. The roof and floor rocks are mudstone. Therefore this coal seam is a typical ?three soft? c

    Jan 1, 2013

  • SME-ICGCM
    The New Two-Dimension LaModel Program

    By Olayemi Akinkugbe

    As coal production in the United States continues to increase, the availability of unexploited or virgin fields continue to diminish. As a result, mine operators are forced to mine in unfavorable or m

    Jan 1, 2004

  • SME-ICGCM
    Dynamic Failure in Coal Seams: Implications of Coal Composition for Bump Susceptibility

    By Arthur Miller, Andrew Weakley, Heather E. Lawson

    "IntroductionDynamic failure events in an underground coal mine, or “bumps,” are defined as “the sudden, violent bursts of coal from a pillar or pillars or a block of coal, resulting in a section, the

    Jan 1, 2015

  • SME-ICGCM
    Analysis Of Longwell Shields And Their Interaction With Surrounding Strata In A Deep Coal Mine

    By Duk-Won Park

    A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama (U

    Jan 1, 1992

  • SME-ICGCM
    Gateroad Support in the Czech and Polish Coal Mining Industry - Present State and Future Developments

    By Stanislaw Prusek

    The present state of Czech and Polish coal mining industry is presented at the beginning of the article. This paper will inform the reader of the general data concerning hard coal reserves? number of

    Jan 1, 2011

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    Gate Entry Design For Longwalls Using The Coal Mine Roof Rating

    By Chris Mark

    Successful longwall mining requires a stable tailgate entry. Gate entry performance is influenced by a number of geotechnical and design factors, including: - Pillar size and pillar loading; - Ro

    Jan 1, 1993

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996