Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    Structural Geological and Stress Controls on Natural Gas Inrushes in Southern West Virginia Longwall Coal Mines

    By Sandin E. Phillipson

    "On April 5, 2010 a massive dust-fueled explosion at a longwall mine in southern West Virginia claimed the lives of 29 miners. The mine had experienced large gas inrushes from the floor on two known p

    Jan 1, 2016

  • SME-ICGCM
    Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead Line

    By Axel Preusse

    A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate

    Jan 1, 2003

  • SME-ICGCM
    A Study of Potential Fault Reactivation and Water Intrusion at a Longwall Coal Mine in Appalachia

    By Francis Kendorski

    A longwall coal mine in Appalachia about 1,500 ft deep encountered a fault while developing a new longwall panel. The fault extended from mining depth to the surface near a secondary road and drainage

    Jan 1, 2003

  • SME-ICGCM
    A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element Modelling

    By A. K. Bhattacharyya

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar

    Jan 1, 1992

  • SME-ICGCM
    The Requirements of a Database to Store Geotechnical Data to Assist in Roof Support Design

    By Ross Seedaman

    The specification of roof support needs to consider rock strength, imposed ground stresses, and more importantly the bedding and joint structure of the immediate roof rocks. A database structure has b

    Jan 1, 2003

  • SME-ICGCM
    Determination of Load Transfer Characteristics of Gloved Resin Bolts from Laboratory and In Situ Field Testing

    By Dion Pastars

    Resin based grouts are the main form of rock bolt anchorage in the underground coal industry in Australia and New Zealand. To be effective, the system requires the mixing of the catalyst and mastic co

    Jan 1, 2005

  • SME-ICGCM
    Strength and Deformation Characteristics of Coal under Cyclic Loading

    By Yongjie Yang

    Experimental study on the strength and deformation characteristics of coal under cyclic loading provides guidance for designing coal pillar which is subjected to repeated mining influence during minin

    Jan 1, 2006

  • SME-ICGCM
    Recent Developments on Surface Ground Strain Calculations Due to Underground Mining in Appalachia

    By Zach G. Agioutantis

    The prediction of ground movements due to underground mining using the influence function method is a mature technology, widely used by researchers and planning engineers around the world. Surface str

    Jan 1, 2013

  • SME-ICGCM
    Indian Experiences Of Mechanised Coal Pillar Extraction (b04565f5-fd0b-4a80-a8aa-fcb98125fe52)

    By Arun Kumar Singh

    Wide variation in the nature of the coal seams and the surrounding rock mass of the Indian coalfields and very little information about the associated stress fields were observed to be the major hurdl

    Jan 1, 2009

  • SME-ICGCM
    Roof-Pillar Interface Affecting the Pillar Behavior

    By Andre Cezar Zingano

    "The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng

    Jan 1, 2016

  • SME-ICGCM
    Characteristic Acoustic Emission Sequences of Rock Samples Under Uniaxial Loading

    By Nic Slatalla

    Acoustic emission monitoring techniques are a powerful tool for analysing deformation behaviour and fracture characteristics of rock samples under uniaxial loading. Uniaxial compression tests wer

    Jan 1, 2008

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SME-ICGCM
    Recent Developments in Pre-driven Recovery Road Design

    By Rob Thomas

    Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.

    Jan 1, 2008

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008