Performance and Safety Considerations of Hydraulic Support Systems (eb62774d-dbca-420f-b228-950711bafbce)By Thomas Barczak
Hydraulic cylinders are used in several roof support systems, such as longwall shields and mobile roof supports, to provide critical ground control Many state-of-the-art hydraulic support system opera
Jan 1, 1998
-
A Practical and Efficient Steel King Beam Structure Design Methodology at Slope Bottom IntersectionsBy Stankusm John C., Xiaoting Li
"Quantitatively identifying the load on a steel king beam set is a complicated issue in designing the king beam structure at the slope bottom area. From an engineering perspective, understanding the n
Jan 1, 2018
-
Analysis of Roof Falls at and Recommendation of Roof Control Plansfor Rofomex Posphate MineBy Jinsheng Chen
For underground openings, many factors can cause roof failure and thus roof falls. The most common factors related to Mother Nature are weak roof lithology, geological structures, and an abnormal in-s
Jan 1, 2011
-
Empirical and analytical design of large openings at a proposed national underground science laboratoryBy Karl Jr. Zipf
The famous Homestake gold mine in Lead, SD. closed recently alter 125 years of operation. However, the mine may receive a new lease on life as a National Underground Science Laboratory (NUSL) supporte
Jan 1, 2002
-
Failure Characteristics Of Roof Falls At An Underground Stone Mine In Southwestern Pennsylvania (75950903-1172-4003-a90c-706052b9d4ea)By Anthony T. Iannachione
The location and time of 2,007 microseismic emissions from a limestone mine in southwestern Pennsylvania were compared with the development of mine faces and the characteristics of the mine layout. Ba
Jan 1, 2001
-
The Initial Performance of Commonly Used Primary Support on U.S. Coal MinesBy Murali Gadde
U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio
Jan 1, 2011
-
Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface StructuresBy Yi You
A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term
Jan 1, 1997
-
Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and EvaluationBy Stephen Tadolini
Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no
Jan 1, 2002
-
New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)By Chris Mark
The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi
Jan 1, 2002
-
Stability Control of Clusters of Deep Openings Around Shaft Bottom and Theory of Rock DeformationBy Yanfa Gao
Clusters of underground openings were developed around the shaft bottom of Tangshan Mine. They were deep and located in soft rock strata. After development, those openings have been subjected to consi
Jan 1, 2002
-
Laboratory Study Of Shear Loading And Bolt Load Transfer Mechanisms Under Constant Normal Stiffness ConditionsOne of the most important parameters in rock/resin/bolt load transfer mechanism is the surface property of the bolt. Although there are various bolt surface configurations available in the market, ver
Jan 1, 1999
-
Influence Of Bolts On Discontinuities And Yielding Rock - Conceptual Developments (76baa342-4034-40cb-bc1f-e7c7c132e40f)By Buddhima Indraratna
The paper highlights the conceptual developments in rock mechanics applied to quantify the effect of bolts in the stabilization of joints and yielding soft rocks.
Jan 1, 1992
-
Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography SoftwareBy Larry Stolarczyk
A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A
Jan 1, 2003
-
Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)By Daniel W. H. Su
This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan
Jan 1, 1987
-
The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground MovementsBy Robert W. Bruhn
A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a
Jan 1, 1990
-
Influence of joints on the elastic response of a LFUFL stope to FEM miningBy W. G. Pariseau
A new approach to the direct inclusion of the effects of joints and geologic structure in rock mechanics analyses is applied to an elastic analysis of stability of a Lucky Friday undercut and 4111 lon
Jan 1, 1989
-
The Influence Of Water Content On Strength Characteristic Of Sandstone Subject To Triaxial TestBy S. Kramadibrata
It has been well accepted that water content significantly changes the physical and mechanical properties of rocks. Experimentation data of Uniaxial Compressive Strength (UCS), Modulus of Elasticity (
Jan 1, 2000
-
Rock Bursting and Seismicity During Ramp Development, Lucky Friday Mine, Mullan, Idaho (70e1cb23-d3f9-44e0-89bb-620862946d41)By J. K. Whyatt
A comprehensive survey of mine seismicity and rock bursting during development of two sublevels at the Lucky Friday Mine, Mullan, ID, USA, was conducted to better define rock failure mechanisms and so
Jan 1, 1998
-
The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)By Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
The Response Of Massive Structures Inferred From Tidal Tilt Monitoring (a922d488-04e7-4665-bcdd-a85115c8db5e)At any given lime, the tidal force subjects massive regions to a spatially uniform load. The deformation of any large structure due to these forces is proportional to the elastic properties of the str