Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Mapping By Seismic Imaging In Underground Mines

    By W. J. Mcgaughey

    A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me

    Jan 1, 1989

  • SME-ICGCM
    Geotechnical Assessment Of Skin Reinforcement In Underground Mines (f05de68f-e8c8-43ca-aab9-9a65452cc10f)

    By Jan A. Nemcik

    Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati

    Jan 1, 2009

  • SME-ICGCM
    An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder Monitoring

    By Greg Hendon

    Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t

    Jan 1, 1990

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies

    By John C. Stankus

    Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted

    Jan 1, 1990

  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    Cable Bolting - Potential Applications For Variable Strata Conditions

    By David Allen

    Cable bolting is a relatively new strata reinforcement technique that has been used successfully in Australia and the United Kingdom. Jim Walter Resources, Inc. has examined the principles and can vis

    Jan 1, 1994

  • SME-ICGCM
    Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, Italy

    By R. Balia

    The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th

    Jan 1, 1990

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    In-Situ Coal Strength Determination - Case Studies

    By Kot F. Unrug

    Strength of coal is one of the governing factors in size determination of mine pillars, and therefore affects the percentage of extraction and thus, utilization of reserves. Coal strength is also impo

    Jan 1, 1995

  • SME-ICGCM
    Effect Of Water On Stability Of Mine Roadways

    The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road

    Jan 1, 1996

  • SME-ICGCM
    The Formation And Effects Of Transient Abutment Stress During Nonuniform Face Advance

    By George J. Karabin

    Since the inception of a qualitative pressure arch theory by Haak4 in 1911, much work has been done in an effort to apply this concept to underground mining. It has been used in both longwall and room

    Jan 1, 1982

  • SME-ICGCM
    Surface Subsidence. in Longwall Mining--A Case Stud

    By R. D. Yancich

    A case study of longwall mining surface subsidence was performed at a mine in Southwestern Pennsylvania. The mine operated in the Pittsburgh coal seam which averaged 70-72 inches with 6-8 inches draw

    Jan 1, 1984

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • SME-ICGCM
    Analyses of Valley Fill Slope Stability - Three Case Studies

    By Shiva P. B. Kolli

    Surface mining of multiple scams by mountaintop mining methodology is complex in the Appalachian region of West Virginia. Excess spoil from the removal of overburden and interburden is disposed in the

    Jan 1, 2001

  • SME-ICGCM
    Ground Control and the Inundation of the Retsof Mine

    By Vincent A. Scovazzo

    On March 12, 1994, the 1,100-foot deep 2 Yard South panel of the 1l0 year-old Retsof Mine collapsed. At the time of this occurrence, the Retsof Mine was characterized as the world's largest, most

    Jan 1, 1997

  • SME-ICGCM
    Application in Design for Close Proximity Multi-Seem Mining

    Virtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl

    Jan 1, 1987