Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design Aspects In Multiple-Seam Mining: Case Studies

    By Gregory J. Chekan

    Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i

    Jan 1, 1990

  • SME-ICGCM
    New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)

    By Chris Mark

    The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi

    Jan 1, 2002

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Characterization Of Overburden Response To Longwall Mining In The Western United States

    By Khamis Y. Haramy

    The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time

    Jan 1, 1992

  • SME-ICGCM
    Short-encapsulation Pull Tests for Roof Bolt Evaluation at an Operating Coal Mine (d859e8fa-c0f1-49be-9743-84926e16279e)

    By James Pile

    The San Juan Coal Mine, located near Farmington, New Mexico, supplies the San Juan Generating Station with more than 6 million tons of coal annually. To replace dwindling surface mine production, San

    Jan 1, 2003

  • SME-ICGCM
    The Influence Of Horizontal Stress On Pillar Design And Mine Layout At Two Underground Limestone Mines

    By Garth Kuhnhein

    The Black River and Maysville underground limestone mines operated by Carmeuse Lime and Stone, Inc. in northeastem Kentucky are two of the largest underground limestone operations in the United States

    Jan 1, 2004

  • SME-ICGCM
    Integrity Factor Approach to Assess the Stability of Room-and-Pillar Mines

    By Kanaan Hanna

    The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied

    Jan 1, 1988

  • SME-ICGCM
    Theory and Technology of Mining Subsidence Control by Grouting the Overlying Strata Separations with Fine-Coal Ash

    By Yanfa Gao

    Abstract In order to control and reduce ground subsidence due to coal mining, and to protect building, railway and other surface construction, a new subsidence control method is proposed. Ground subsi

    Jan 1, 2002

  • SME-ICGCM
    The Use Of Geologic Modeling In The Prediction Of Adverse Roof Conditions

    By Edward S. Custer

    Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional

    Jan 1, 1981

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Effects of Longwall Mining on Streamflow in the Pittsburgh Seam Basin

    By Kenneth L. Johnson

    The effects of underground longwall coal mining on flow in perennial streams within the Pittsburgh seam basin were evaluated. Four streams above four different longwall mines were studied. Overburden

    Jan 1, 1997

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden Strata

    By Shugang Li

    The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this

    Jan 1, 2005

  • SME-ICGCM
    The Influence Of Water Content On Strength Characteristic Of Sandstone Subject To Triaxial Test

    By S. Kramadibrata

    It has been well accepted that water content significantly changes the physical and mechanical properties of rocks. Experimentation data of Uniaxial Compressive Strength (UCS), Modulus of Elasticity (

    Jan 1, 2000

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • SME-ICGCM
    Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)

    By Wei Wu

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri

    Jan 1, 1992

  • SME-ICGCM
    The Control Of Surface Subsidence By Width/Depth Ratio And Chain Pillar Size In The Presence Of Competent Coal Measures

    By E. H. R. Schumann

    The local stratigraphy and composition of the coal measures, including competent dolerite sill and massive sandstone lavers is shown to have a restricting influence on the development and magnitude of

    Jan 1, 1988

  • SME-ICGCM
    Some Structural Aspects Of Designing The Shield Supports

    By S. S. Peng

    This paper presents a convenient way for the preliminary design of the shield supports. The locus equations which are applicable for all kids of shield supports are derived. These equations facilitate

    Jan 1, 1982

  • SME-ICGCM
    A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West Virginia

    By Paul L. Tyrna

    The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa

    Jan 1, 2001

  • SME-ICGCM
    The Utilisation of Numerical Modelling to Predict Water and Gas Flows Around Longwall Panels; Two Case Studies from the UK Coal Mining Industry

    By D. J. Reddish

    This paper illustrates how numerical modelling has been utilised to predict water and gas pathways around active longwall panels using two case studies. This information has proved invaluable m the de

    Jan 1, 2003