Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Design of Primary Ground Support during Roadway Development Using Empirical Databases

    By Ry Stone

    "There have been many design practices utilised within the coal mining industry to arrive at the minimum densities of primary ground support required during roadway development. This paper demonstrate

    Jan 1, 2015

  • SME-ICGCM
    Understanding and Optimizing the Performance of Passive Primary Support on Coal Mines

    By Anthony Spearing

    There are approximately 68 million rockbolts installed annually in underground coal mines in the USA (Tadolini and Mazzoni, 2006). The most utilized is the passive fully grouted resin rebar bolt, whic

    Jan 1, 2014

  • SME-ICGCM
    Basics on the Dimensioning and the Extraction of Shaft Safety Zones

    By Anton Sroka

    The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th

    Jan 1, 2005

  • SME-ICGCM
    Ground Control Techniques Utilizing Polymer Grid Structures (6a308b5b-e28a-436d-9aed-f102a6943d1b)

    By Brian E. Travis

    Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, highwall

    Jan 1, 1992

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Modern Shield Technology: Better Than Ever But Still Not Perfect

    By Thomas M. Barczak

    A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer

    Jan 1, 1999

  • SME-ICGCM
    Design Considerations For Bump-Prone Longwall Mines

    Tailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a

    Jan 1, 1999

  • SME-ICGCM
    Evaluation of the Point Load Strength for Soft Rock Classification

    By B. (Mamas) Das

    A project to evaluate the suitability of point Load strength tests for testing and classifying coal measure rocks for coal mining application was initiated by Canada Centre for Mineral and Energy Tech

    Jan 1, 1984

  • SME-ICGCM
    Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry Modification

    By Luis Giraldo

    Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout

    Jan 1, 2005

  • SME-ICGCM
    Prediction of Inter-Strata Movements Above Longwall Faces (bade68bf-520f-401d-9d3a-43ba4395e61a)

    By Neil Styler

    This paper presents an analysis of measurements of inter-burden de- formations above six longwall faces. An attempt is made to demonstrate some correlation between the movements at the various sites,

    Jan 1, 1984

  • SME-ICGCM
    Applications of ARMPS (Version 6) to Practical Pillar Design Problems

    By Christopher Mark

    The Analysis of Retreat Mining Pillar Stability (ARMPS) program has been used to evaluate room and pillar retreat mining layouts since it was first released in the mid 1990s. After the Crandall Canyon

    Jan 1, 2011

  • SME-ICGCM
    Practical Stress Modeling for Mine Planning

    By Keith Heasley

    As part of the initial investigation and validation of a new boundary-clement formulation for stress modeling in coal mines. the underground stresses and displacements at two multiple-seam coal mines

    Jan 1, 1998

  • SME-ICGCM
    Mechanism and Prediction of Ground Surface Subsidence Due to Multiple-Seam Longwall Mining

    By Gang Ren, Behrooz Ghabraie

    "Observational data suggest that the ground surface subsidence profile from multiple-seam longwall mining is rather different from that of single seam. Despite the increase of coal production from mul

    Jan 1, 2016

  • SME-ICGCM
    Design Considerations of the Secondary Roof Support for Longwall Tailgate Entries

    By Jinsheng Chen

    To maintain the stability of longwall tailgate entries, they have to be supported by not only the primary roof support but also the secondary roof support due to the impact of the longwall mining¬indu

    Jan 1, 2003

  • SME-ICGCM
    Application Of Time Domain Reflectometry To Ground Control

    By Kevin M. Connor, O&apos

    An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste

    Jan 1, 1990

  • SME-ICGCM
    Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot Longwall

    By J. G. Stewart

    Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since

    Jan 1, 1984

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • SME-ICGCM
    Surface Flooding-Considerations For Mining Facilities Site Selection

    By Daniel S. Mazzei

    This paper will be a general discussion of surface flooding considerations as they affect mining facilities site selection, based primarily on experience with several such problems with which MSHA&apo

    Jan 1, 1982

  • SME-ICGCM
    Field Testing of the Fully Grouted Thrust Tensioned Bolts

    By Kot Unrug

    Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati

    Jan 1, 2002

  • SME-ICGCM
    Vertical Load Capacities of Roof Truss Cross Members

    By David F. Gearhart, Khaled M. Mohamed

    "Trusses are primarily used as passive roof supports in coal mines. They are constructed of three main parts: two grouted bolts installed at opposing forty-five degree angles into the roof so that the

    Jan 1, 2015