Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Research on Coal and Gas Outburst Dynamic System

    By Chaojun Fan, Du Wenzhang, Sheng Li, Hong-Hong Shi

    "Coal and gas outburst is an extremely complex dynamic disaster in coal mine production process which will damage casualties, equipment facilities and disorder the ventilation system by suddenly eject

    Jan 1, 2016

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)

    Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest

    Jan 1, 1992

  • SME-ICGCM
    Heat-Imaging Experimental Study Of Reducing Local Gas Accumulation By Rotary Radial Jet

    By S. Q. Yang

    Rotary radial jet improves greatly the pulsing velocity of airflow along each direction everywhere in the entry, intensifies transverse migration of air, eliminates effectively the local gas accumulat

    Jan 1, 2004

  • SME-ICGCM
    Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)

    By T. N. Singh

    With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa

    Jan 1, 1992

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • SME-ICGCM
    Fundamental Principles of an Effective Reinforcing Roof Bolting Strategy in Horizontally Layered Roof Strata and Areas of Potential Improvement

    By Martin McKinnon, Guy Reed, Russell Frith

    "It is arguable that the development of reinforcing roof bolting systems has largely stagnated in recent times, primarily due to the prevailing industry view that few, if any, further improvements can

    Jan 1, 2017

  • SME-ICGCM
    A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mine

    By T. J. McMahon

    This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from

    Jan 1, 1989

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    Three-Seam Stress Analyses at Bowie Mines, Colorado

    By Hamid Maleki

    In this paper, the authors present a review of data gathering programs and stress analyses for improving mine layout designs at BRL mines located near Paonia, Colorado. BRL and other companies have

    Jan 1, 2007

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993

  • SME-ICGCM
    Roof Stability Mapping to Forecast Ground Conditions at an Illinois Basin Coal Mine

    By Phil R. Ames, Anil K. Ray, Murali M. Gadde, John A. Rusnak

    "Many factors can be responsible for coal mine roof falls including, mining geometry, stress conditions and local geology. In the Illinois Basin coal mines, roof instability is commonly attributed to

    Jan 1, 2010

  • SME-ICGCM
    Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining

    By Guo Wenbing

    "INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody

    Jan 1, 2015

  • SME-ICGCM
    Performance Characteristics for Large Sections of Welded Wire Screen With Multiple Pull Patterns

    By Timothy J. Matthews, Timothy J. Batchler, Ted M. Klemetti

    "From 2011–2016, there were 1,511 documented injuries, including 7 fatalities, from ground falls in underground coal mines in the United States. The majority of these ground-fall injuries were not cau

    Jan 1, 2018

  • SME-ICGCM
    Ground Control Techniques Utilizing Polymer Grid Structures (6a308b5b-e28a-436d-9aed-f102a6943d1b)

    By Brian E. Travis

    Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, highwall

    Jan 1, 1992

  • SME-ICGCM
    Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall Areas

    By Richard A. Allwes

    A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano

    Jan 1, 1986

  • SME-ICGCM
    Overcoring Techniques to Assess in Situ Corrosion of Galvanised Friction Bolts

    The effects of corrosion upon the load bearing capacity and ultimate tensile strength of galvanised friction bolts were determined. Corrosion rates were measured by overcoring of the reinforcement ele

    Jan 1, 2005

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984

  • SME-ICGCM
    Application of Yield-Lok Bolt for Bursting and Convergence Grounds in Mines

    By Rocky Wu

    Rock bursts are one of the greatest challenges to ground control in the mining industry. With increasing mining depth and mining scale, there are more and more industry requirements on yielding rock s

    Jan 1, 2011