Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
In-Situ Tests and Numerical Simulation about the Effect of Annulus Thickness on the Resin Mixture for Fully Grouted Resin BoltBy Andre Zingano
The objective of this paper is to study the effect of annulus thickness on the quality of resin mixture for fully grouted resin bolt. Pullout and mixture tests were made in underground coal mines for
Jan 1, 2008
-
Evaluating Coal Pillar Mechanics Through Field Measurements (a8e6d7f0-5b83-40bc-b63c-ddaae2b3a526)By Anthony Iannacchione
Designing coal pillars to provide resistance against overburden loads has long been an aim of rock mechanics engineers. The need for accurate pillar strength models has become more urgent as greater o
Jan 1, 1992
-
Multi?Seam Mining Over Old Workings with Small Pillars - A Case StudyBy Peter Zhang
Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough
Jan 1, 2014
-
The Evaluation of Empirical Coal Pillar Strength Formula Based on Uncertainty CriterionBy Navid Hosseini
Several empirical equations to estimate coal pillar strength have been presented in academic studies. The development processes of these equations are similar and are usually obtained by fitting the m
Jan 1, 2012
-
Planning And Design For Barrier Pillar Recovery Three Case HistoriesBy David A. Newman
Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu
Jan 1, 1995
-
Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western ChinaBy Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li
"The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat
Jan 1, 2017
-
Barrier Pillar Design for Safe and Productive Longwall MiningBy Stephen C. Tadolini
Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use
Jan 1, 2013
-
Hydraulic Fracturing Of Sandstone And Longwall Roof Control - Implementation And EvaluationBy D. W. H. Su
Following a roof fall in the B12 headgate of a CONSOL Pennsylvania Coal Company (CCPC) underground coal mine in February 1998, CONSOL R&D and Exploration initiated an underground roof geology reconnai
Jan 1, 2001
-
Progression of Longwall Gateroad Support as Conditions Change at Lodestar Energy's Baker MineBy David Miller
Longwall gateroad support can be supplied by a variety of methods. The system of support also needs to be flexible as conditions change. This is especially true in the complex geological conditions of
Jan 1, 1998
-
Determination And IT-Supported Evaluation Of Rock Mechanical Parameters And Their Utilization During Application Of Roof Bolting TechniquesBy Nikolaos Polysos
For the planning and driving of gateroads supported by roof bolts a practical concept has been developed in order to determine the geological and rock mechanical parameters derived from exploration dr
Jan 1, 2001
-
The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone MinesBy Simon H. Prassetyo
Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre
Jan 1, 2011
-
The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)By Stephen Tadolini
A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar
Jan 1, 2007
-
Improving Design Methodology For Innovative Rock Mechanics DesignBy Dwayne C. Kicker
This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a
Jan 1, 1989
-
Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case StudyBy Li Yang, Andre Cezar Zingano, Alberto Fronza
"Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f
Jan 1, 2017
-
Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case StudiesBy John C. Stankus
Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted
Jan 1, 1990
-
Remote Control Roof BoltingBy Cosmo P. Fazio
Remote control roof bolting is approaching reality with the continued improvement of a number of components and subsystems being developed by The Bendix Corporation under sponsorship of the U.S. Burea
Jan 1, 1982
-
A Case Study of Longwall Roof-Supports InteractionBy Y. H. Wang
During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research
Jan 1, 1986
-
Geologic Conditions Affecting Mineability in the Jane Mine.By Stephen J. Harven
Geologic conditions in eight northern operating sections of Jane Mine, Keystone Coal Mining Complex. Armstrong County, Pennsylvania are defined by utilizing drillhole data and underground geologic map
Jan 1, 1987
-
A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger MiningBy Michael Amick
Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro
Jan 1, 2007
-
Effects of Panel Mining Sequence and Retreat Direction on the Roof Stability of Longwall Headgate EntriesBy Jinsheng Chen
The major functions of longwall headgate entries are to provide access ways to the outby submains or mains for coal transportation and to the longwall face for fresh air and for transporting men and m
Jan 1, 1998