Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    Comparison among the Conventional Fully-Grouted Bolt, Combination Bolt, and One-Step Bolt Using Numerical Modeling

    By Andre Zingano

    The objective of this paper is to compare the behaviors of different types of roof bolts: (1) One-Step Bolt (OSB), (2) Fully grouted Bolt (RB), (3) Combination Bolt (CB), and (4) Torque tension Bolt

    Jan 1, 2007

  • SME-ICGCM
    Extraction of Hard Coal Close to a Shaft

    By Peter Fischer

    Reducing mining costs has become such an important factor in the German coal industry that operators are forced to work only those areas where production costs can be kept low. These areas will normal

    Jan 1, 2007

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SME-ICGCM
    The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia

    By Kieran Black

    The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has

    Jan 1, 2007

  • SME-ICGCM
    The Influence of Rock Mass Quality in Controlled Blasting (87c67f30-2368-4c33-b1ba-1ff98b35a5ef)

    By Paul Singh

    Blasting is an integral part of mining activity and is an inherently destructive process. The quality of the rock mass in which an excavation is being driven has a strong influence on the level of dyn

    Jan 1, 2007

  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • SME-ICGCM
    Study about the Dynamic Influences of Longwall Mining in the US on Surface Structures

    By Karsten Zimmermann

    The paper presents a study on the influence of face retreat rate in longwall coal mining on surface subsidence. It shows possibilities to influence dynamic ground movement by using a specific and con

    Jan 1, 2007

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007

  • SME-ICGCM
    Moranbah North Tests the Critical Caving Theories Every Geotech Engineer?s Dream, the Ability to Get More than Two Points on a Curve

    By Chris Strawson

    Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Austr

    Jan 1, 2007

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SME-ICGCM
    The Roof Behavior of a Longwall Tailgate Under Massive Sandstone Strata

    By Yemi Akinkugbe

    Underground coal mining under massive sandstone can present significant challenges if the roof behavior is not well understood. This paper presents a classic cantilever bending/flexing behavior of a l

    Jan 1, 2007

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Ground Control and Safety Implications of Blast Damage in Underground Mines

    By Stephen Iverson

    The National Institute for Occupational Safety and Health (NIOSH) is currently performing research to help mine operators minimize the amount of loose or damaged rock surrounding a blasted opening. I

    Jan 1, 2007

  • SME-ICGCM
    Three-Seam Stress Analyses at Bowie Mines, Colorado

    By Hamid Maleki

    In this paper, the authors present a review of data gathering programs and stress analyses for improving mine layout designs at BRL mines located near Paonia, Colorado. BRL and other companies have

    Jan 1, 2007

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME-ICGCM
    German-Chinese Cooperation in the Field of Mining Subsidence Engineering

    By Axel Preusse

    Mining subsidence plays an increasing important role in the Chinese hard coal mining. Reasons for this are a substantial rise of production during the last decade, a dense settlement in many mining

    Jan 1, 2007

  • SME-ICGCM
    Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)

    By Craig Compton

    Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,

    Jan 1, 2007