Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Current Status And Future Direction Of Low-Emission Integrated Steelmaking Process

    By P Ridgeway, D Xie, M A. Somerville, S Jahanshahi, H Rogers, J G. Mathieson, Y Pan, N Haque, P Zulli, T E. Norgate, L Lu, A Deev

    In 2006 the Australian steel industry and CSIRO initiated an R&D program to reduce the industry’s net greenhouse emission by at least 50%. Given that most of the CO2 emissions in steel production occu

    Jan 1, 2014

  • TMS
    Arsenic Control In Modern Smelting Processes

    By M. A. Cocquerel

    The future economic necessity of mining copper ores with a high impurity content and increased environmental awareness will require closer examination of the distribution of arsenic within copper smel

    Jan 1, 1983

  • TMS
    Energy and Emissions with Oxyfuel

    By Thomas Niehoff

    "Oxyfuel combustion systems are state of the art for many melting operations. Airfuel systems have been stepwise modified to oxygen enrichment, oxygen lancing and oxyfuel. Every change of the melting

    Jan 1, 2010

  • TMS
    Platinum-Palladium Concentrate Smelting and Pressure Leaching

    By R. W. Bartlett

    A two step process for treating platinum group metal flotation concentrates Is described while experimental results. The process was designed to be simple and Inexpensive While yielding a high recover

    Jan 1, 1989

  • TMS
    Direct Leaching of Zinc Concentrates at Atmospheric Pressure

    By R. W. Adams

    A new process has been developed for leaching zinc sulphide concentrates at atmospheric pressure using air or oxygen plus nitrogen dioxide in dissolved or gaseous form as? an oxygen carrier. The proce

    Jan 1, 1990

  • TMS
    Operational Practice with the Waelz Kiln and Leaching Plant of Tsu in Taiwan

    By C. Mattich, A. L. Beyzavi

    The Waelz Plant at Taiwan Steel Union Co. Ltd. (TSU) was erected within nine months from September 1, 1998 to May 15, 1999. The nominal capacity of the plant is 50,000 tonnes per year of electric are

    Jan 1, 2000

  • TMS
    Outokumpu Flash Smelting

    By W. G. Davenport

    Chapter 1 showed that flash smelting is a key step in extracting copper from sulfide ores. It also showed that there , are two versions of flash smelting: (a) Outokumpu flash smelting, which uses ox

    Jan 1, 2001

  • TMS
    Study on the Combustion Characteristics and Kinetics of Blending Coal

    By Zhenyang Wang, Xingle Liu, Xiangdong Xing, Shan Ren, Hongen Xie, Jianliang Zhang

    "Non-isothermal combustion experiments of different additive amount of bituminous (0, 20, 40, 60, 80, 100 wt%) were conducted by synthesized thermogravimetry analyzer(STA409PC) from room temperature t

    Jan 1, 2014

  • TMS
    Oxidation Behavior of Aluminium 6061-Hematite Particulate MMCs at Elevated Temperature

    By S. C. Sharma, M. Krishna, N. Sanmukha

    "The oxidation behavior of an aluminium composite with 0, 2, 4, and 6% by weight of hematite at 200 to 500 °C has been investigated. Within the experimental temperature ranges a parabolic weight gain

    Jan 1, 2000

  • TMS
    Effect of Agitation on the Quenching Performance of a Quench Oil using CHTE Quench Probe System

    By Md. Maniruzzaman

    The quenching performance of a liquid quenchant can be controlled by controlling the agitation in the quench tank. Without agitation, a vapor layer or bubbles form at the hot part surface and the natu

    Jan 1, 2003

  • TMS
    Use of the Microscope in Flotation Plant Operations

    By F. L. Marley

    Small and medium-sized flotation plants with no assaying instrumentation still depend much upon the art of the operator to produce acceptable and consistent results. Improved performance can be accomp

    Jan 1, 1981

  • TMS
    Challenges In Sampling, Metallurgical Accounting And Reconciliation Of Primary Smelting Furnaces

    By Jacques J. Eksteen

    Metallurgical accounting around toll treatment smelters pose a number of challenges. This paper reviews the requirements for good sampling practice, and how conflicting requirements for good furnace o

    Jan 1, 2006

  • TMS
    Productivity Increase In Flash Smelting Furnace Operation At Saganoseki Smelter & Refinery

    By Yoshiaki Suzuki

    Since 1973, Saganoseki Smelter & Refinery had operated two flash smelting furnaces together to produce 330,000 mtpy of copper. However, in 1990's, economical situation required the smelter more i

    Jan 1, 1998

  • TMS
    Optimization Of The Asarco East Helena Water Treatment Plant For Removing Arsenic And Metals

    By Douglas K. Modrow

    In the fall of 1993, construction was completed on a state of the art industrial waste water treatment plant at Asarco's East Helena Lead Smelter. Purpose of the plant was to remove arsenic and m

    Jan 1, 1996

  • TMS
    Evaluation of Non-Equilibrium Minor Components in Pyrometallurgy

    By Akira Yazawa

    In the field of pyrometallurgy, the equilibrium evaluation has recently become easy by use of thermodynamic software, but it is strongly desired to estimate the amounts of non-equilibrium minor compon

    Jan 1, 1998

  • TMS
    Equipment Selection for Chloride Circuits

    By G. R. Waters

    NMR360 is developing a suite of chloride-based metals extraction processes, with the first commercial operation scheduled for commissioning late in 2018. It is critical, therefore, that with the intro

  • TMS
    Hydrogen Sulfide Produced From Sulfate By Biological Reduction For Use In Metallurgical Operations (2d4353c8-3fa9-4aeb-b4ea-243e29870bd7)

    By Andre L. De Vegt

    Hydrogen sulfide is an expensive chemical used in nickel, zinc and copper mining and metallurgical operations for selective recovery and concentration of metals, from leach water streams, acid plant b

    Jan 1, 1998

  • TMS
    Electric Smelting of Tin Concentrates at Capper Pass Limited

    By A. M. Strachan

    The application of submerged electric arc furnace smelting techniques to tin concentrates at the Capper Pass tin smelter in England is discussed. Some experimental data from earlier small scale 50 KVA

    Jan 1, 1990

  • TMS
    Oxygen Flash Converting for Production of Copper

    By G. S. Victorovich

    Technical progress in primary smelting has changed the face of the copper industry in the years since the Second World War. Much of this change has resulted from a wide acceptance of flash smelting te

    Jan 1, 1993

  • TMS
    Waste Minimization And Resource Recovery Using Centrifugation And Thermal Desorption

    By Bradford H. Miller

    Separation and Recovery Systems, Inc. (SRS) provides on-site waste minimization and resource recovery using its state-of-the-art MX-1500 centrifuge and MX-2000 thermal desorber. The MX-1500 can proces

    Jan 1, 1994