    Environmental Management Measures Relating to a Greenfield Copper Smelter

    By Norbert L. Piret

    From the copper smelter operation a various outputs are to exert negative impacts on the environment. Particularly, emissions like SO2 and dusts, solid wastes like contaminated gypsum and arsenic slud

    Jan 1, 1996

  • SME
    EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow Conditions

    By Matthew Geary, Stephen J. Marino, Jordan A. Schreiner

    "INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo

    Jan 1, 2016

  • SME
    Episyenites—Characteristics, Genetic Constraints, and Mineral Potential Mining, Metallurgy and Exploration

    By O. T. Rämö, E. Suikkanen

    Episyenites are sub-solidus, quartz-depleted alkali-feldspar-rich rocks. They form veins and lenticular bodies in granitoid rocks and migmatites in a late- to post-orogenic or anorogenic setting. Leac

  • SME
    Episyenites—Characteristics, Genetic Constraints, and Mineral Potential Mining, Metallurgy and Exploration - Mining, Metallurgy & Exploration (2019)

    By O. T. Rämö, E. Suikkanen

    Episyenites are sub-solidus, quartz-depleted alkali-feldspar-rich rocks. They form veins and lenticular bodies in granitoid rocks and migmatites in a late- to post-orogenic or anorogenic setting. Leac

  • ABM
    Equipamentos De Movimentação Interna Customização X Flexibilidade

    By Flaviana Dias Rocha Pimenta

    Com o objetivo de adequar a logística interna ás particularidades e variabilidade das demandas de movimentação interna de produto, a VBR (Vallourec Tubos do Brasil S.A) estudou em parceria com o opera

    Aug 17, 2017

  • AIME
    Equipment and Facilities – Shovel and Haulage Truck Evaluation

    By John T. Crawford

    Introduction Loading and hauling systems are evaluated in open pit mining for new properties, expanding existing operations, changing systems or equipment, and equipment replacement analysis. The obj

    Jan 1, 1979

  • TMS
    Equipment and Processes for Boasting Zinc Concentrates at Cominoo's Trail Zinc Smelter

    By D. H. Magoon

    The zinc smelter of Cominco Ltd. at Trail, B.C. Is the largest In the western world. A total of 550.000 tonnes of concentrate are proceed at the smelter annually. Approximately 80% of the zinc concent

    Jan 1, 1990

  • CIM
    Ergonomic Intervention Through the Design of Jumbo Drill Rigs and its Effect on Cost Savings and Workers Health and Safety

    By Cindy Schiewek

    Industrial injury occurrences are an ongoing concern for Mine Operators. Along with the personal suffering of injured workers comes an increase in compensation and productivity costs. Growing recognit

    May 1, 2003

  • NIOSH
    Ergonomics: Beyond Compliance

    By D. Caruso

    The health and financial costs of cumulative injuries are plaguing the mining industry. Industry leaders are concentrating on reducing the risk of injury to their workers through design and redesign o

  • CIM
    Error Associated with the Sampling of Gold Ores

    By Raphaël Mermillod-Blondin, Claude Bazin

    "Sampling is an important step for ore body evaluation and daily plant material balances. The Gy’s equation is regularly used to assess the size of the samples to be collected and to estimate the repr

    Jan 1, 2012

  • AIME
    Escondida: A Project Financing For The 1990s

    By D. W. Loughridge

    INTRODUCTION Raising capital in the 1990s is a timely subject. However, many of us thought why should raising capital in the 1990s prove to be unlike it was in the 19805, the 1970s, the 1%0s, or ea

    Jan 1, 1990

  • SME
    Estimating Future Energy Requirements - Concept And Method

    By H. J. Bickel

    This paper is concerned with general concepts and statistical devices used in projecting overall energy requirements. Particular emphasis is given to the use of individual end- use markets as an appro

    Jan 1, 1962

  • SME
    Estimating Transportation Costs For Large Volume Shipments

    By Elizabeth Anne Semon

    The marketability of a large volume bulk material is significantly effected by transportation costs. Hence, it is essential for anyone that deals with minerals or mineral wastes to be able to reliably

    Jan 1, 1973

  • CIM
    Estimation and Planning Tool for Industrial Construction Scaffolding

    By C Kumar

    Scaffolds are temporary structures built to facilitate construction activities on site. A considerable amount of resources are allocated to scaffolding on industrial projects. Variability in geometric

    Aug 1, 2013

  • SAIMM
    Estimation of bubble size distributions in flotation froths by use of dense convolutional neural networks, Y. Fu and C. Aldrich

    By Y. Fu, C. Aldrich

    This study investigates the use of dense convolutional neural networks to estimate bubble size distributions in flotation froths. 20 videographically captured images of froths from an industrial plati

    Jan 1, 2020

  • SME
    Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration

    By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa

    Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses

  • SME
    Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration (ff4e1177-21df-44a1-9ca7-c600c2bd555d)

    By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa

    Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses

  • ABM
    Estudo De Fratura E Falhas Superficiais Em Arames Trefilados Btc

    By Tiago Salzmann Vilela

    Durante a produção de arames pelo processo de trefilação diversas falhas superficiais e internas podem ocorrer. Esses defeitos podem ocasionar fratura do arame no processo dos clientes. Um dos defeito

    Jul 30, 2018

  • ABM
    Estudo Preliminar De Viabilidade Econômica De Um Projeto De Mineração De Agregados Através De Análise Probabilística

    By Raíza da Silva Juvenal, Suelen Silva Rocha, Artur Ângelo Alcântara de Assis, Jorge Luiz Valença Mariz

    Um estudo de viabilidade econômica deve considerar parâmetros e incertezas inerentes a um projeto para produzir resultados econômicos consistentes, fornecendo ao investidor uma ferramenta de tomada de

    Oct 3, 2019

  • ABM
    Esw's Research And Development A Combination Of Trials And Simulation

    By Michael Brandner

    In the past the research and development of new materials for hot mill rolls was mostly done by trials. Such trials are expensive and difficult to transform from small size to the big size of a solid