Search Documents

Search Again

Search Again

Sort by

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014

  • AUSIMM
    Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa Mine

    By B Nielsen, H Lehto, B Musuku

    "The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo

    Oct 10, 2016

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • CIM
    Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in Saskatchewan

    By Witold J. S. Ostrowski

    Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with

    Jan 1, 1967

  • ISEE
    Design/Build Highway Blasting - Case Study

    By Cathy Aimone-Martin, Frank Achuff

    The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i

    Jan 1, 2004

  • SME
    Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024

    By Sean Warren, JOSEF BOURGEOIS

    The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute

    Feb 1, 2024

  • AUSIMM
    Designing and Delivering Explosives Systems and Solutions for the Underground Massive Mining Industry: The Next Five Years with Dyno Nobel

    The extraction of world-class mineral deposits using massive underground mining techniques is not an entirely new theme to world mining companies and experts. Previous MassMin conferences have helped

    Jan 1, 2000

  • CIM
    Designing and developing an integrated cave management system

    By A. van As, J. McGaughey, M. J. Mol, R. Tosen

    Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la

    Jan 1, 2014

  • SME
    Designing and modeling mesh communications in underground coal mines

    By Michael E. Karmis

    New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer

    Jun 1, 2010

  • SME
    Designing And Modeling Wireless Mesh Communications In Underground Coal Mines

    By K. R. Griffin

    New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen

    Jan 1, 2010

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • DFI
    Designing Piles for Seismic Events

    By H G. Poulos

    "This paper sets out a simplified approach by which the practical foundation designer can undertake the relevant calculations to satisfy the requirements for deep foundation design in seismic areas. T

    Jan 1, 1900

  • SME
    Designing, Modeling, and Laboratory Testing of a Non-clogging Impingement Type Filter for Mining Dust Scrubbers "Mining, Metallurgy & Exploration (2020)"

    By Ashish Ranjan Kumar, Steven Schafrik, Oscar Velasquez

    Flooded-bed dust scrubbers installed on continuous miners use fibrous type multi-layered filters to capture dust from the airstream. Prolonged operations of the scrubber could lead to filter clogging

    Sep 19, 2020

  • SME
    Despite industry woes, 2016 is a big year for the mining equipment sector

    By William Gleason

    "Sluggish prices for commodities and a glut of oversupply of many commodities did not stop the world’s largest mining equipment makers from showing off their latest and greatest machines and technolog

    Jun 1, 2016

  • AIME
    Destructive and Non-destructive Tests of Welds

    By J. R. Dawson, A. B. Kinzel

    THE purpose of testing is to determine whether the material in question is identical in all essential respects with similar material which has given satisfactory service. The most common method of sec

    Jan 1, 1930

  • SME
    Desulfurization Of High Sulfur Thermal Coal By Froth Flotation

    By A. K. Sinha

    A great potential market for the high BTU midwestern thermal coal exists if the coal is desulfurized and prepared to meet the environmental restrictions and the utility customer specifications. Becaus

    Jan 1, 1985

  • TMS
    Desulfurization of Missouri Coals

    By M. H. Erten

    Most of the fourteen workable coal seams in the State of Missouri have high ash and sulfur levels and need beneficiation in order to meet customer and Environmental Protection Agency requirements. If

    Jan 1, 1982

  • TMS
    Detailed Mathematical Modeling Of Liquid Metal Streamer Formation And Breakup (Invited)

    By Adam Powell

    A Cahn-Hilliard phase field model is formulated to describe transport-limited electrochemical reactions coupled with fluid flow in a metal reduction cell. When the reaction is limited by mass transfer

    Jan 1, 2003

  • CIM
    Detailed Modeling of an HPGR/HRC for Prediction of Plant Scale Unit Performance

    By J. A. Herbst

    Professor Klaus Schönert and his students used fundamental physics to develop many of the principles required for the design and scale-up of "Gutt Bett Zerkleinern" devices such as the high pressure g

    Jan 1, 2012