Search Documents

  • SME
    Impacts of grade distribution and economies of scale on cutoff grade and capacity planning

    By Mustafa Kumral, Mehmet Balci

    Strategic mine planning focuses on cutoff grade selection, capacity planning and block sequencing. Despite significant knowledge accumulated, potential value can be added to mineral sourcing by addres

    Sep 1, 2024

  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • SME
    Impacts of Human Fatigue Impairments on Mine Equipment Operation Performance - SME Annual Meeting 2026

    By Vanessa Viterbo, Lia Walker, Hassan Khaniani, Vitor Viterbo

    Fatigue is a major contributor to haul-truck incidents in mining, with up to 65% of fatigue-related events associated with operator drowsiness or microsleep episodes, Williamson et al. (2011) and Cate

    Feb 22, 2026

  • SME
    Impacts Of Land Use Planning On Mineral Resources

    By R. V. Ramani

    Demands on available lands will continue to increase due to the projected increase in population and industrial expansion. Though there is an upper limit on the available lands, the multi-use nature o

    Jan 1, 1982

  • AIME
    Impacts of Land Use Planning on Mineral Resources (cd6ed184-9d9b-4b43-a404-1527dfc8cecf)

    By R. J. Sweigard, R. V. Ramani

    Demands on available lands will continue to increase due to the projected population increase and industrial expansion. Though there is an upper limit on available lands, the multi-use nature of the l

    Jan 1, 1985

  • SME-ICGCM
    Impacts of Longwall Mining on Hydrology, Soil Moisture, and Tree Health in Belmont County, Ohio

    By David Bartsch

    The Ohio Valley Coal Company (Ohio Valley) has operated the Powhatan No. 6 Mine in Belmont County, Ohio since 1972. Ohio University owns a 455-acre research farm over a portion of the Ohio Valley rese

    Jan 1, 2005

  • ISEE
    Impacts of Measurement Accuracy on Three-Dimension Vibration Models

    By Gavin Yuill, Kameron Ray

    "The impact on vibration model accuracy by input data that is inaccurate was previously unknown, butthought to introduce significant error. This paper explores the impact of accuracy of different GPSr

    Jan 1, 2017

  • SME
    Impacts Of RCRA Regulation Of Mine Waste On The Coal Industry

    By J. H. Desautels

    The modern coal mining industry is subject to a vast array of regulations affecting virtually all aspects of its operations. Probably the most significant over-sight role involves the Office of Surfac

    Jan 1, 1993

  • SME
    Impacts Of Spoil Conditions On Reforestation Of Surface Mined Land

    By M. H. Pelkki, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves

    Research has shown that excessive soil compaction is detrimental to the establishment of trees in reclaimed soils. Dry bulk density and penetration resistance are two soil parameters that can be used

    Jan 1, 2003

  • SME
    Impacts Of Spoil Conditions On Reforestation Of Surface Mined Land (b2bd3f1e-5fbd-441d-ae83-ec597c5ff463)

    By M. H. Pelkki, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves

    Research has shown that excessive soil compaction is detrimental to the establishment of trees in reclaimed soils. Dry bulk density and penetration resistance are two soil parameters that can be used

    Jan 1, 2001

  • AIME
    Impacts Of The Clean Air Act Amendments Of 1977 On The Uranium Mining Industry

    By Gary E. Parish

    TABLE OF CONTENTS Contents I. Introduction II. Purpose of the Paper III. Historical Perspective A. Existing Sources B. New Sources (NSPS) C. Hazardous Pollutants (NESHAPS) D.

    Jan 1, 1979

  • SME
    Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois

    By V. Rajaram

    The Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the Deep Tunnel

    Jan 1, 1991

  • AUSIMM
    Impacts of thrust faulting at Goonyella Riverside Mine

    By H S. Pescini

    A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c

    Mar 22, 2022

  • SME
    Impacts of Grade Distribution and Economies of Scale on Cut‑off Grade and Capacity Planning - Mining, Metallurgy & Exploration (2024)

    By Mustafa Kumral, Mehmet Balci

    Strategic mine planning centers on solving cut-off grade selection, capacity planning, and block sequencing. Even though significant knowledge has been accumulated on mine planning over the last decad

    Apr 29, 2024

  • SME
    Impacts On Air And Water Resources Associated With Possible Copper-Nickel Mining In Minnesota

    By Peter C. Ashbrook

    The Regional Copper-Nickel Study was initiated in large part because of fears that copper-nickel development might cause adverse effects on the environment from air pollutants such as sulfur dioxide (

    Jan 1, 1980

  • IMPC
    Impacts on Energy Consumption and Wear in Grinding Circuits with a Pre-Concentration Stage

    By A. P. Chaves, D. Jose Neto, M. G. Bergerman, E. S. Mano

    "More complex ore comminution and concentration operations have found increasing application in the mining industry due to lower grades and higher complexity of the available ores. An alternative to c

    Jan 1, 2018

  • SAIMM
    Impala Platinum Smelter, Rustenburg - An Integrated Smelter Off-Gas Treatment Solution

    By G. Westcott

    Impala Platinum, the second largest platinum producer in the world, is embarking on a major expansion strategy to increase its platinum output from 1.95 moz to 2.8 moz by the year 2008. The smelter co

    Jan 1, 2007

  • AUSIMM
    Impartiality and Fairness in Stakeholder Engagement Through Triangular Value Analysis

    By J L. Stacey

    The diverse priorities, drivers and concerns of multiple stakeholders in the minerals industry complicate the integration of sustainable development considerations into mine design, as well as operati

    Jan 1, 2009

  • SME
    IMPC Delegates Discuss the Future of Minerals Processing into the 21st Century

    By Steve Kral

    About 500 mineral-processing professionals from around the world gathered in San Francisco, CA in Oct. 22-27, 1995 for the XIX International Mineral Processing Congress (IMPC). Following the theme

    Jan 1, 1996

  • AIME
    Imperatives

    In July 1946 President Truman approved the stock- piling act providing for the accumulation of stocks of strategic minerals in which this country is deficient. Congress also provided huge sums for the

    Jan 1, 1950