Search Documents

Sort by

  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • CIM
    Maximising Return On Your Improvement Efforts

    By Gareth Barnes

    Traditional approach to improvement is driven by good ideas from good people, but whilst the business case may sound good, when the project is complete, we often have not delivered on expectations.  W

    May 4, 2025

  • AUSIMM
    Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper Operations

    By G W. Croft, L E. Krause

    The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro

    Jan 1, 2005

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • IIMP
    Maximizando Valor con VDC/BIM en Proyectos de Paradas de Planta

    By Juan Mayta

    Dada la situación actual y escenario post COVID-19, es fundamental adoptar estrategias de Gestión Colaborativa e Integrada de Proyectos, este artículo es el resultado de la aplicación de Virtual Desig

    Sep 29, 2023

  • SME
    Maximization of Productivity Of Autonomous Equipment in Underground Mines

    By J. Paraszczak

    Underground metal mining involves many challenges. Economic slowdown, tough international competition and sometimes volatile metal prices put constant pressure on mine operators to increase productivi

  • SME
    Maximization of Productivity of Autonomous Trackless Loading and Haulage Equipment in Underground Metal Mines ? A Challenging Task

    By J. Paraszczak

    Application of teleoperated and automated (or ?autonomous?) mobile equipment in underground metal mines is a promising avenue for overcoming some of the challenges facing mine operators. These include

    Feb 23, 2014

  • CIM
    Maximizing fuel cell test reliability

    By C. Andrews

    Fuel cell testing requires fully automated operation, on-site configuration of tests, and real-time monitoring for performance and failures. Balancing the flexibility and programmability of a test sta

    Jan 1, 2005

  • CIM
    Maximizing Performance of FRP Equipment in Copper Extraction

    By Jeffrey D. Eisenman

    FRP is a proven material for the solvent extraction processes of copper production. There is a history of successful applications of FRP piping and equipment in hydrometallurgical processing. The perf

    Jan 1, 2019

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • CIM
    Mcclean Lake Mill 55 Kt Debottlenecking Study

    By T. S. Grewal, S. C. Gupta, H. Natarajan, T. W. McQuade, N. Nejibulloev-Mamedov

    Cigar Lake is one of the world’s largest high-grade uranium mines. The ore mined at Cigar Lake is milled at Orano Canada Inc’s (Orano) McClean Lake mill. The average Cigar Lake ore uranium grade since

    Jan 1, 2020

  • SME
    Meandu Rising: The Second Life Of The Meandu Mine

    By J. G. Pippenger

    Rio Tinto Coal Australia (RTCA) developed the Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent and newly constructed Tarong Power Station (TPS). In designing the min

    Jan 1, 2011

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015

  • AUSIMM
    Measurement and Control of the Mill Load in an Air-Swept Ball Mill Circuit

    By Sandvik

    Fine grinding in an air-swept ball mill working in closed circuit with a forced vortex air classifier has been investigated first in continuous laboratory and then in industrial scale. Results from

    Jan 1, 1995

  • SME
    Measurement And Modelling Of Slurry Mixing Using Resistance Tomography

    By Richard A. Williams

    The design, modelling and simulation of solid-liquid mixers remains one of the least advanced aspects of minerals processing, due to difficulties in quantifying complex slurry hydrodynamics from first

    Jan 1, 1995

  • CIM
    Measurement and Prediction of Dilution in a South African Gold Mine Operating with Open Stoping Mining Methods

    By P. J. Le Roux

    "Mining worldwide and definitely in South Africa, is constantly under pressure to reduce its cost structure so as to sustain profitability. In underground gold mines where an open stope mining method

    Jan 1, 2015