Search Documents

Sort by

  • AUSIMM
    Australia's Uranium - Resources, Production, and Demand in World Perspective

    By McKay AD

    The bulk of Australia's uranium resour- ces was delineated in the last 18 years when a total of $563 million (1984 dollar values) was spent on uranium exploration. Australia's share of th

    Jan 1, 1986

  • AUSIMM
    Australian Innovation in African Heavy-Haul Rail

    By K Devencorn

    The development of robust, economical transport infrastructure has been identified as a key driver to sovereign economic growth. Notwithstanding the value of undeveloped mineral resources, unless they

    Nov 22, 2011

  • AUSIMM
    Australian Innovations in High Pressure Grinding Rolls and Large Grinding Mill Manufacture

    By E J. Hofmann, J E. Hofmann, A J. Hofmann-Fritz

    "With its Head Quarters in Perth, global heavy engineering company Hofmann Engineering is one of the largest family owned engineering companies in Australia. The company has pioneered a number of new

    Jul 15, 2013

  • SME
    Australian Mineral Sands Operations 1982 ? Introduction

    By V. J. McSweeney

    This paper is directed at interested parties outside the Beach Sand Industry : the scope is quite broad. The geomorphology described is a successful working hypothesis which guided the author during p

    Jan 1, 1982

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • AUSIMM
    Australian Research Council Research Hub for Advanced Technologies for Australian Iron Ore – An Introduction

    By K Williams, G M. Evans, S M. Iveson, K P. Galvin, C E. Loo

    The Australian Research Council (ARC) has recently established an Industrial Transformation Research Hub in the area of iron ore, focused on iron ore characterisation, beneficiation, materials handlin

    Jul 13, 2015

  • AUSIMM
    Australia’s hydrogen export in the form of embedded mineral derivatives

    By R Daiyan, G Burge, M Haider Ali Khan

    Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary

    Sep 1, 2024

  • SME
    Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice

    By Horst Pöchhacker

    The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin

    Jan 1, 1976

  • SAIMM
    Author's Reply to Discussion (6892bdec-7740-4c72-9841-329b5421e505)

    Solvent loading: It is agreed that it is advantageous, as far as reagent cost is concerned, to operate at maximum solvent loading. However, owing to the fact that no reliable automatic solvent flow c

  • AIME
    Authors' Replies To Discussion Of Papers Presented At Recent Meetings

    Discussion of the paper of R. J. COLONY, presented at the New York Meeting, February, 1921, and issued With MINING AND METALLURGY No. 169, January, 1921. R. J. COLONY (author's reply to discussi

    Jan 8, 1921

  • SME
    Autoclave Overpressure Control in Pressure Oxidation: Reducing Titanium Ingntion Risk in Autoclave Vent Systems

    By T. Krumins, L. Zunti, R. Frischmuth

    "Titanium and titanium alloys are commonly selected for pressure oxidation autoclave vent piping and pressure control valve components, as well as autoclave internals and other process piping. In the

    Jan 1, 2016

  • CIM
    Autogenous and semi-autogenous mill circuits

    By A. K. Ratte, C. M. Brown

    "IntroductionIn autogenous mills, grinding of the ore feed is accomplished by the direct action of the variously sized rocks making up the feed on each other and the mill interior. Size reduction is a

    Jan 1, 1989

  • SME
    Autogenous and Semiautogenous Grinding Practices

    By John H. Bassarear

    How best to grind? This article compares conventional crushing and grinding circuits to semiautogenous circuits, reviews recent installations of each circuit, and describes seven methods of using auto

    Jan 6, 1982

  • SME
    Autogenous Grinding - The Long And The Short Of It! ? Summary

    By Howard W. Adam

    Mill length was the primary variable investigated in an autogenous pilot mill circuit. The 5-1/2' diameter mill had both pebble ports and 1/2" wide slotted grates. The plus 1/2" mill product was

    Jan 1, 1973

  • SME
    Autogenous Grinding At Rana Mines

    By Olav K1omstad1ien

    The lean, but extensive iron ore deposits of the Dunderland Valley north of Mo i Rana, Norway, is the raw material for the Rana Mines which is a division of the state owned steel mill A/S Norsk Jernve

    Jan 1, 1978

  • CIM
    Autoguided Vehicles in a Production Environment

    By Fabien Miller

    Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p

    May 1, 2002

  • CIM
    Automated Cost Analysis of Energy Loss in Existing Buildings Through Thermographic Inspections and CFD Analysis

    By Youngjib Ham

    Understanding energy performance of existing buildings is vital to increasing their efficiency and reducing the overall energy consumptions. This entails facility managers to systematically monitor bu

    Aug 1, 2013

  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • CIM
    Automated Evaluation of Proximity Hazards Caused by Workers Interacting with Equipment

    By Tao Cheng

    Previous research and applications in construction resource optimization have focused on tracking the location of material and equipment. There is a lack of studies on automated monitoring of the inte

    Aug 1, 2013

  • TMS
    Automated Gaspe Puncher

    By W. Dutton, D. Simms

    "The clearing of tuyeres on copper and nickel converters or similar metallurgical, vessels has, for many years, been done using mainly a manually- operated ""puncher"". One such device is the ""Gaspe

    Jan 1, 1989