Search Documents

  • TMS
    Development of the AusIron Process

    By B. W. Lightfoot, Neill F. Arthur

    "The AusIron process is a new development of the well established Ausmelt bath smelting technology(l). The development of this technology has been tied to the South Australian Steel and Energy (SASE)

    Jan 1, 1996

  • CIM
    Development of the automatic GO-60 drill

    By R. England

    "This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.

    Jan 1, 1987

  • AIME
    Development of the Benguet Mining District

    By CLYDE M. EYE

    THE Sub-province of Benguet is in the North Central part of the Island of Luzon. Baguio, the capital, is situated on a piateau 5000 ft. above sea level, and is the main health resort of the Philippine

    Jan 1, 1930

  • AUSIMM
    Development of the Boleo Process Flow Sheet and the Direct Solvent Extraction (DSX) Circuit for Cobalt and Zinc Recovery

    Development of the Boleo Process Flow Sheet and the Direct Solvent Extraction (DSX) Circuit for Cobalt and Zinc Recovery The metallurgical process designed to treat the El Boleo Cu-Co-Zn-Mn ore invol

    Sep 13, 2010

  • NIOSH
    Development Of The Bureau Of Mines Gas-Combustion Oil-Shale Retorting Process

    By Arthur Matzick

    [1-1 1y IilJLJ,I~X" K pl.rw~~ts rt1s11l s I'I.IIIII 1.c1sc.n rcnlb cind d(~\,elopmrnt rnr- ried oitt by tllc* Illll.cv111 of .\li~~css (111 rlrc. ~ns-c-o~l~l)i~s~io~l oil-sllnlr rcdorting proc-rs

    Jan 1, 1966

  • AUSIMM
    Development of the Burra Mine Museum

    The Barra Mine was the most significant mine of Australia's earliest mining era, which took place in South Australia between 1841 and 1851, the decade prior to discovery of gold in eastern Austra

    Jan 1, 1993

  • AIME
    Development Of The Butchart Riffle System At Morenci

    By David Cole

    THE appearance of the Wilfley table in 1897 marked an epoch in the art of concentration of ores. The table has merited and received an almost unprecedented measure of public approval, lasting through

    Jan 2, 1915

  • SME
    Development of the BX04 Impeller System for Bio-Oxidation Reactors

    By W. Baguley, L. P. H. Greenhalgh, R. P. Riley

    The traditional impeller system for aeration and suspension of slurries, e.g. in bacterial oxidation plants, is the vertical flat blade turbine (VFBT) . This type of impeller is energy-intensive, whi

    Jan 1, 1992

  • AIME
    Development Of The Choking-Free Cyclone And Its Classification Performance

    By T. Sekimoto, T. Kokubo, M. Yamamoto, K. Masuda, T. Moro, H. Sakamoto

    The choking-free cyclone was developed primarily to remove solid particles suspended in a slurry containing fibrous materials, such as municipal solid waste. This cyclone is characterized by a screw c

    Jan 1, 1980

  • CIM
    Development of the Cigar Lake Jet Boring Mining Method

    By M. L. Wacker

    "Cigar Lake high-grade uranium mine in Saskatchewan is operating after 25 years of test mining, construction, and mine flood remediation. Factors include ground stability, groundwater control, radiati

    Jan 1, 2017

  • AIME
    Development Of The Coke Industry In Colorado, Utah, And New Mexico -Discussion

    C. H. GIBBS,* Salt Lake City, Utah (written discussion?).-The development of the coke industry in Utah had a somewhat checkered career for the first 50 years of its existence. About 1851 the iron-ore

    Jan 11, 1918

  • SME
    Development Of The Continuous Elution Process For Extraction Of Gold From Carbon

    By A. M. Stone

    Following the conceptual idea of a Continuous Elution Process early in 1982, the system was successfully pilot plant tested at Western Mining's Kambalda gold plant in December 1982. As a conseque

    Jan 1, 1989

  • SME
    Development Of The Cyprus Thompson Creek Molybdenum Deposit

    By Kenneth P. Neumann

    The development of the Cyprus Thompson Creek Molybdenum Deposit near Challis, Idaho, began in 1967 when the first mining claims were staked on the intrusive rock outcrop. Exploration drilling continue

    Jan 1, 1983

  • SAIMM
    Development Of The Density Distribution Model In A Gas-Solid Phase Fluidized Bed For Dry Coal Separation

    By Y. He

    The nature of the density distribution in a gas-solid phase fluidized bed for dry coal separation is an important factor in influencing the performance. However, during coal processing, fine slime wou

    Jan 1, 2002

  • SME
    Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway

    By Chris Bennett, Drupad Desai, Kirit Mevawala

    INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg

    Jan 1, 2005

  • AIME
    Development Of The Disco Process Of Low Temperature Carbonization

    By C. E. Lesher

    THE Disco* process for the production of low temperature coke and its immediate predecessor, the Wisner or Carbocite process have been described in the voluminous literature of low temperature carboni

    Jan 1, 1952

  • AIME
    Development Of The Dwight-Lloyd Sintering Process

    By H. E. Rowen

    As high grade iron ore deposits dwindle and costs rise, sintering becomes more and more important. The steel industry is now faced with beneficiation problems once peculiar to nonferrous work. Succeed

    Jan 1, 1961

  • CIM
    Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill Facilities

    By Godfrey MacDonald

    "The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East

    Jan 1, 1997

  • AUSIMM
    Development of the Ernest Henry Underground Mine – The Challenges and the Solutions

    By T Purvis

    Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp

    Mar 21, 2011

  • SME
    Development Of The Falcon Concentrators

    By S. McAlister

    This paper outlines the development of the Falcon enhanced gravity separator. Design objectives included continuous operation with sharp separations, mechanical simplicity, minimization of process wat

    Jan 1, 1998