Search Documents

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • SME
    Pilot Plant Testing of a New Process for Rhenium Recovery from Copper PLS

    By C. Bryce

    Rhenium is primarily recovered as a by-product from molybdenum roasting circuits. However, rhenium is also present in copper heap leach solutions at very low concentrations and represents a potential

    Feb 23, 2014

  • SME
    Pilot Plant Testing of a New Process for Rheniumrecovery From Copper PLS

    By C. Bryce

    Rhenium is primarily recovered as a byproduct from molybdenum roasting circuits. However, rhenium is also present in copper heap leach solutions at very low concentrations, and this represents a poten

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • SME
    Pilot Scale Dewatering Studies Of Ultra Fine Clean Coal Slurries

    By D. P. Tao, J. G. Groppo, R. Killmeyer, W. W. Wen, B. K. Parekh

    Economical dewatering of ultra-fine (minus 74 m) clean coal slurry produced in column flotation to a 20 percent or lower moisture level will be an important step in successful implementation of the a

    Jan 1, 1999

  • SME
    Pilot Scale Dewatering Studies Of Ultra Fine Clean Coal Slurries (a4d4eeba-bae6-4acc-9f95-4ae265f50a63)

    By B. K. Parekh

    Economical dewatering of ultra-fine (minus 74 m) clean coal slurry produced in column flotation to a 20 percent or lower moisture level will be an important step in successful implementation of the ad

    Jan 1, 1999

  • AIME
    Pilot Scale Heap Leaching At The Pinson Mine, Humboldt County, Nevada

    By Mark E. Smith

    To allow recovery of gold values from ore which cannot be economically processed by the mill, Pinson Mining Company has developed a run-of-mine heap leaching facility. In order to estimate production

    Jan 1, 1984

  • SME
    Pilot Scale Heap Leaching At The Pinson Mine, Humboldt County, Nevada (df24f728-eef7-4f74-8afe-526ab92ed030)

    By Mark E. Smith

    To allow recovery of gold values from ore which cannot be economically processed by the mill, Pinson Mining Company has developed a run-of-mine heap leaching facility. In order to estimate production

    Jan 1, 1983

  • TMS
    Pilot Scale Measurements of No Emissions from the Silicon Process

    By Nils Eivind Kamfjord, Halvard Tveit, Ingeborg Solheim

    "Because of its negative environmental effect the attention towards NO emissions increases. This again leads to new demands from the authorities for better surveillance and control of emissions. Earl

    Jan 1, 2012

  • TMS
    Pilot Scale Solar Carbothermic Reduction Of ZnO To Zn

    By C. Wieckert

    Concentrated solar energy can be used as heat source for the production of metals. One of the most promising respective processes, the solar carbothermic production of Zn from ZnO, is investigated wit

    Jan 1, 2006

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • SME
    Pilot Scale Test Program To Define Gravity Recoverable Gold And Concentrate Grade For A Ryan Lode Ore Milling Circuit

    By PDF

    Previous work has shown that significant, free milling gold values exist in the Ryan Lode ore. This project used pilot scale equipment to estimate the percentage of gold recoverable by gravity methods

    Jan 1, 1995

  • CIM
    Pilot Scale Testing of a Lead-Zinc Ore Aljustrel Project

    By Jeffiey B. Austin, Maurice Tagami

    "The ores of the Iberian Pynte Belt are typically massive sulphide ores with very fine grained mineral textures. EuroZinc Mining Corporation is currently evaluating one of the massive sulphide deposit

    Jan 1, 2000

  • SME
    Pilot Scale Testing Of Hyperbaric Filtration For Fine Coal Dewatering

    By J. G. Groppo

    The Andritz Ruthner Inc. hyperbaric filter was evaluated at a pilot scale for dewatering fine coal cleaned by froth flotation. The pilot scale dewatering testing was conducted at a solid feed rate ran

    Jan 1, 1996

  • AUSIMM
    Pilot Studies of the Ravensthorpe Nickel ProjectÆs Pressure Acid Leach Slurry Heater

    By M Miller

    Operators of nickel laterite pressure acid leach and gold pressure oxidation technology frequently employ a series of steam condensing heaters to preheat the leach feed slurry. The heaters are an econ

    Jan 1, 2005

  • SME
    Pilot Study On The Influence Of The Eccentric Speed On Cone Crusher Production And Operation

    By D. Jacobson

    There are many different machine setup parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the eccentric speed at which the co

    Feb 27, 2013

  • SME
    Pilot study on the influence of the eccentric speed on cone crusher production and operation (edb7524e-49ff-4eb7-a7e1-0da505b43724)

    By D. Jacobson

    There are many different machine design parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the speed at which the cone gyrate

    Dec 1, 2013

  • SME
    Pilot Test Of The Dupont Activator Technology At The Homestake Mine, Lead, South Dakota

    By H. Hinds

    Plant testing of DuPont's Activator Technology in the vat leach circuit of the Homestake mine shows increased gold recoveries of 3-5%. Activators are catalysts of gold dissolution in cyanide solu

    Jan 1, 1997

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020