Search Documents

  • SME
    Progressive Design-Build in the Tunneling/Underground Construction Industry—Perspective from the Private Sector - RETC2023

    By Carlos Tarazaga

    Progressive Design-Build (PDB) is an emerging variation of alternative delivery programs in the underground construction industry. PDB refers to the way a construction project design is developed by t

    Jun 13, 2023

  • AUSIMM
    Progressive Developments in Steelmaking at Port Kembla

    In 1955 the annual production of steel at Australian Iron and Steel Pty. Ltd., Port Kembla was 1.2 million tonne and over the following two decades this had progressively increased to the present c

    Jan 1, 1976

  • CIM
    Progressive Failure of Norite Rock Under Biaxial Loading Condition

    By Hani S. Mitri

    Strainbursts in brittle rock are common to deep underground mines. The state of stress at the boundary of mine openings is dictated by a biaxial stress/loading condition. This paper reports the result

    Apr 1, 2005

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • SME-ICGCM
    Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, Italy

    By R. Balia

    The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th

    Jan 1, 1990

  • SME
    Progressive Kriging - A Method Of Testing The Geostatistical Hypotheses ? Introduction

    By R. L. Sandefur

    Any geostatistical study involves (implicit) hypotheses about 1. The distribution function 2. The drift of the data 3. The (underlying) variogram Once these are known, most other results f

    Jan 1, 1982

  • CIM
    Progressive Management and Engineering Evaluation of Pipeline Integrity

    By S. Kariyawasam, R. McNealy

    Pipelines are subject to multiple threats often requiring quantification of pipeline risk and engineering evaluation of in-line inspection and other data to effect discovery of conditions defined by t

    Jan 1, 2005

  • CIM
    Progressive Texture Evolution during Annealing of Hot Deformed Mg-Al-Sn Alloy

    By A. S. H. Kabir, I-H. Jung, J. Su, Yue. S., M. Sanjari

    One of the major problems associated with conventional wrought magnesium alloys is the unwanted basal texture that forms during plastic deformation which generally does not change markedly after post-

    Jan 1, 2015

  • AIME
    Progressive Zinc Industry

    By W. M. Peirce

    FOR many years it was considered quite the proper introduction to any discussion of zinc metallurgy to remark that the methods of extracting zinc from its ores were archaic. Often there was an added i

    Jan 1, 1931

  • AUSIMM
    Prohibited Activities and the Resource Management Act 1991 û Does æProhibitedÆ Mean æForbiddenÆ?

    By M L. van Kampen

    The Resource Management Act 1991 provides for activities to be classified as permitted, controlled, restricted discretionary, discretionary, non-complying or prohibited in district and regional plans.

    Jan 1, 2007

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • SME
    Project and Mining Geology

    By Donald A. Ranta

    Every mineral project or mine is based on a geologic entity-an ore (mineral) deposit. A well-defined mineral deposit and its associated geologic characteristics are the only aspects of a project that

    Jan 1, 2008

  • SME
    Project Cash Flows At Risk In Strip Coal Mining

    At present, discounted cash flow analysis is generally accepted as the preferred method of valuation of mine projects in surface coal mining. One of the major reasons for that is its ability to take i

    Jan 1, 2006

  • SME
    Project Clean Lake’s First Large Diameter EPB TBM in Cleveland, Ohio - RETC2023

    By Erica McGlynn, Brian Negrea, Lance Jackson

    There was no need for the people of Cleveland to ask “Where does the raw sewage go? We want to know!” because it was clear. The raw sewage was being discharged into Lake Erie during heavy rainfall eve

    Jun 13, 2023

  • SAIMM
    Project control - an overview

    By E. R. Davis, R. J. Knott

    The paper discusses some of the tools of management in the field of project control, especially in engineering. Project control includes planning and cost engineering, and involves various phases: the

    Jan 1, 1982

  • AUSIMM
    Project Controls for Large Mining Projects - The Client's Perspective

    Control of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf

    Jan 1, 1993

  • AUSIMM
    Project Delivery

    By E Skinner, G Lane

    Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and

    Jul 15, 2013

  • SAIMM
    Project Delivery In The Mining Industry - Options And Trends

    By B. McCosker

    The choice of the appropriate delivery process for a project is often not adequately thought about. The industry needs to be prepared to break its preconceived mind-sets on delivery procedures. Indust

    Jan 1, 2002

  • SME
    Project Delivery Models and Risk Allocation for Whole Life Tunnel Management

    By D. Caiden, C. S. Covil, P. J. Chamley

    The paper describes the background to alternative delivery models, drawing on international experience, and introduces Project Alliancing/Contract Partnering, common risks and risk sharing on tunnel p

    Jan 1, 2005

  • SME
    Project Delivery Selection For Southern Nevada?s Lake Mead Intake No. 3

    By Michael Feroz

    Severe drought in the Colorado River Basin over the past 10 years has caused water levels to drop in Lake Mead by more than 113 feet. The current lake level is at elevation 1,112 feet mean sea level (