Search Documents

  • NIOSH
    Repeatability of a Checklist for Evaluation Cab Design Characteristics of Heavy Mobile Equipment

    By Michael J. Jorgensen, Pranathi B. Aedla, N. K. Kittusamy

    Risk factors associated with the development of muscu­loskeletal discomfort and disorders during the operation of heavy mobile equipment include whole-body vibration and awkward and sustained joint po

  • TMS
    Repeatedly Utilizing Of Carbon Fiber Chemistry Copper Plating Waste Liquid

    By Tianjiao Luo

    Some literatures discussed on how to recycle the various reagent, but the discussion on how to reuse the waste liquid directly is very little. How to reuse the waste liquid directly was researched in

    Jan 1, 2006

  • IIMP
    Repercusiones económicas de la silicosis en el Perú

    By Aníbal Gastañaga

    En la industria minera, la silicosis se presenta como una enfermedad ocupacional que incapacita total o parcialmente al trabajador labor física, incidiendo directamente en la marcha socio-económica de

    May 1, 1968

  • AIME
    Replaceable Lips For Elevator-Buckets.

    By H. J. Maguire

    (Presented by invitation at a meeting of the Spokane Local Section, Feb. 17, 1912.) THOSE familiar with mill-practice understand the work required of an average bucket-elevator, but I wish to call sp

    Sep 1, 1912

  • DFI
    Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire

    By Adrian Mercer, Ashkan Ameri

    Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi

    Sep 8, 2021

  • CIM
    Replacement Hematite Deposits, Steep Rock Lake, Ontario

    By Hugh M. Roberts

    DEVELOPMENT at Steep Rock lake has given rise to renewed interest in the geology of the iron ore deposits in the Lake Superior Region and has implications of no small moment bearing upon methods of ex

    Jan 1, 1943

  • IOM3
    Replacement mineralization styles and breccia dome formation at Dirtlow Rake fluorite-barite deposit, Castleton, England

    By C. A. Jeffrey

    The Dirtlow Rake vein deposit, which is up to 12 m thick, contains a range of paragenetically linked replacement mineralisation styles typical of many Mississippi Valley-type deposit environments. The

    Jun 19, 1905

  • CIM
    Replacement of an ageing mobile equipment fleet

    By E. Laatio, W. McKay

    "History of Tara Mines Ltd.Tara Exploration and Development Company Ltd. was formed in Canada by Irishmen in 1953. The discovery of an orebody approximately six miles from the historically famous Hill

    Jan 1, 1989

  • SME
    Replacement Of Capital Equipment (252a4ea9-bf4a-4af6-ba3c-4dfbae4fc16e)

    By Henry J. Schwellenbach

    The New York Trap Rock Corporation has four plants located along the Hudson River, all within 70 miles of New York City. The company produces crushed stone for use as construction aggregate, with a to

    Jan 1, 1959

  • TMS
    Replacement Of Carbon Black On Natural Rubber Composites And Nanocomposites – Part 1

    By Fabio J. Esper, Wildor T. Hennies, Guillermo R. Martín-Cortés, Francisco R. Valenzuela-Díaz, Antonio J. Santana de Araujo, Maria G. Silva Valenzuela

    Seeking to replace carbon-black as filler of rubber in the production of vulcanized goods, researchers from University of São Paulo have studied different materials types as minerals, vegetal or waste

    Jan 1, 2015

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    Replacement of Diatomaceous Earth Filter Aid with Alpha-Cellulose at the Laronde Refinery

    By François Robichaud

    "The Laronde mill has been in operation since 1988. Actual milling rate ranges from 7,000 to 8,500 mtpd. Laronde uses SAG/ball mill grinding followed by copper and zinc flotation circuits. A cyanidati

    Jan 1, 2007

  • AIME
    Replacement Of Magnetite Ores In The Pellet Feed Mixture By Hematite With Coke Breeze

    By N. A. Hasenack

    A full description of tests and test results of potgrate--as well as industrial tests is given. It is concluded that the favorable effects of magnetite ores on the pelletizing-plant results can almost

    Jan 1, 1977

  • SME
    Replacement Of Magnetite Ores In The Pelletfeed By Hematites with Combustibles

    By Nick Hasenack

    In the pelletizing plant of Hoogovens, Estel BV, a varying mixture of hematites and magnetites is used for the production of acid and (occasionally) fluxed pellets. Optimum results regarding produc

    Jan 1, 1977

  • AUSIMM
    Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditions

    By S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli

    The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req

    Nov 8, 2021

  • SAIMM
    Replacement Of The Existing Merensky Reef Operations At Lebowa Platinum Mines: An Integrated Business And Operational Readiness Approach

    By O. Y. Ntrama

    Lebowa Platinum Mines has been in operation since the late 1960s and is a relatively small producer compared to Anglo Platinum?s other operations. The mine has never had substantial capital investment

    Jan 1, 2006

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • SME
    Replacement Of Wet Ball Milling With High-pressure Grinding Ahead Of Mineral Separation - SME Annual Meeting 2022

    By S. Makni, F. Wang, A. Rosa, B. Klein, C. Saud, R. McIvor, A. Kumar, C. Gagnon, D. Gong

    In response to the Natural Resources Canada “Crush It Challenge”, Corem partnered with the University of British Columbia and led a project to develop and demonstrate the use of high-pressure grinding

    Mar 2, 2022

  • SME
    Replacement of Wet Ball Milling with High‑Pressure Grinding Ahead of Mineral Separation - Mining, Metallurgy & Exploration (2023)

    By Robert McIvor, Sami Makni, Andreia Rosa, Claude Gagnon

    In response to the Natural Resources Canada “Crush It Challenge,” Corem partnered with the University of British Columbia and led a project to develop and demonstrate the use of high-pressure grinding

    Nov 28, 2023

  • SME
    Replacing Dichromate with Polysaccharide Depressant in Cu-Pb Separation: Lab Bench Tests and Plant Trials in Zijin Mining - Mining, Metallurgy & Exploration (2021)

    By Zhian Liang, Xiong Huang, Weixin Wu, Lifeng Cui, Zhuanhua Wei, Guoyao Li, Xiao Ni, Junrong Wang, Shuiping Zhong

    ZJ 201 (modified starch) is a non-toxic, odorless, and biodegradable polymeric depressant, which selectively depressed galena in batch flotation tests while chalcopyrite was not significantly affected

    Aug 27, 2021